# Oasis Tower One

Oasis Tower One is a project by Brighton Holdings Limited, recorded at 100% complete at its last Dubai Land Department inspection. 9 sales registered in the trailing 12 months at a median AED 720k (899 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

## Registry record

| Field | Value | Provenance |
|---|---|---|
| Developer | Brighton Holdings Limited | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% | DLD verified |
| Registered with DLD | 8 Nov 2008 | DLD verified |
| Construction started | 1 Oct 2007 | DLD verified |
| Declared completion | 14 May 2020 | DLD verified |
| Units in the project | 221 | DLD verified |
| Project area | 18 240 sqm | DLD verified |
| Escrow agent | Abu Dhabi Commercial Bank | DLD verified |
| Project number | 501 | DLD verified |

## Latest registered sales

| Date | Property | Registration | Size sqft | Price AED | AED/sqft |
|---|---|---|---|---|---|
| 2026-09-23 | 1 B/R Flat | Ready | 856 | 720 000 | 841 |
| 2026-07-16 | 1 B/R Flat | Ready | 867 | 650 000 | 749 |
| 2026-04-30 | 1 B/R Flat | Ready | 867 | 840 000 | 968 |
| 2026-04-08 | Studio Flat | Ready | 584 | 525 000 | 900 |
| 2026-04-06 | 3 B/R Flat | Ready | 1 612 | 1 450 000 | 899 |
| 2026-03-26 | 2 B/R Flat | Ready | 1 005 | 1 027 000 | 1 022 |
| 2026-02-19 | Studio Flat | Ready | 584 | 535 000 | 917 |
| 2026-01-09 | Studio Flat | Ready | 584 | 479 000 | 821 |
| 2025-12-18 | 2 B/R Flat | Ready | 1 115 | 1 000 000 | 897 |

| Measure | Value | Year on year |
|---|---|---|
| Median sale price | AED 720k | +10.8% |
| Interquartile range | AED 535k – AED 1.00M | |
| Median price per sqft | 899 AED | +6.3% |
| Registered sales, 12 months | 9 | -57.1% |
| Off-plan share | 0.0% | |

## By number of bedrooms

| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios | 3 | — | — | — | — | — |
| 1-bedroom apartments | 3 | — | — | — | — | — |
| 2-bedroom apartments | 2 | — | — | — | — | — |
| 3-bedroom apartments | 1 | — | — | — | — | — |

## Price per square foot by month

| Month | Sales | Median AED/sqft | IQR |
|---|---|---|---|
| Apr 2023 | 5 | 538 | 526 – 542 |

## What these numbers do not show

- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 9 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

## Nearby projects (within 1.2 km)

| Project | Distance m | Status | Built | Units |
|---|---|---|---|---|
| [Champions Tower 4](https://datadubai.ae/projects/champions-tower-4/) | 98 | Cancelled | 52% |  |
| [The Matrix](https://datadubai.ae/projects/the-matrix/) | 136 | Finished | 100% | 384 |
| [Eden Garden](https://datadubai.ae/projects/eden-garden/) | 139 | Active | 96% | 394 |
| [The Spirit](https://datadubai.ae/projects/the-spirit/) | 165 | Finished | 100% | 386 |
| [Elite 4 Sports Residence](https://datadubai.ae/projects/elite-4-sports-residence/) | 183 | Finished | 100% | 251 |
| [Elite 5 Sports Residence](https://datadubai.ae/projects/elite-5-sports-residence/) | 199 | Finished | 100% | 354 |
| [Global Golf Residence 2](https://datadubai.ae/projects/global-golf-residence-2/) | 206 | Finished | 100% | 342 |
| [The Medalist](https://datadubai.ae/projects/the-medalist/) | 226 | Finished | 100% | 154 |
| [Hera Tower](https://datadubai.ae/projects/hera-tower/) | 240 | Finished | 100% | 531 |
| [Arena Apartments](https://datadubai.ae/projects/arena-apartments/) | 250 | Finished | 100% | 148 |


## Questions and answers

**Who is the developer of Oasis Tower One?**

The Dubai Land Department project registry lists Brighton Holdings Limited as the developer of Oasis Tower One.

**Is Oasis Tower One completed?**

The DLD registry status of Oasis Tower One is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 14 May 2020 — a registry date, not a handover promise.

**How many homes are in Oasis Tower One?**

The DLD registry records 221 units in Oasis Tower One.

**What is the price per square foot in Oasis Tower One?**

Over the last 12 complete months the median registered sale in Oasis Tower One was AED 720k, or AED 899 per sqft, from 9 registered sales. These are DLD registrations, not asking prices.

**Who holds the escrow account for Oasis Tower One?**

The escrow agent recorded by DLD for Oasis Tower One is Abu Dhabi Commercial Bank.

**Where is Oasis Tower One?**

Oasis Tower One is in the Dubai Sports City community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Champions Tower 4, about 98 m away.

**Where does this data come from?**

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

---

**Source:** Dubai Land Department open data, compiled by Continental Club Property  
**Data through:** 24 Nov 2026  
**Methodology:** https://datadubai.ae/methodology/ (v1.0)  
**License:** Reuse permitted with attribution  
**Canonical:** https://datadubai.ae/projects/oasis-tower-one/  
**Suggested citation:** Continental Club Property, "Oasis Tower One", Data Dubai, data through 24 Nov 2026, https://datadubai.ae/projects/oasis-tower-one/  
**Disclaimer:** Registered transactions, not asking prices. Not investment advice, not a valuation. Not affiliated with or endorsed by the Dubai Land Department.
