# The Mertopolis

The Mertopolis is a project by Deyaar Development (P.J.S.C), recorded at 100% complete at its last Dubai Land Department inspection. 15 sales registered in the trailing 12 months at a median AED 1.57M. Registry facts come from DLD; prices are registered transactions, not asking prices.

## Registry record

| Field | Value | Provenance |
|---|---|---|
| Developer | Deyaar Development (P.J.S.C) | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% | DLD verified |
| Registered with DLD | 8 Nov 2008 | DLD verified |
| Construction started | 6 Sep 2006 | DLD verified |
| Declared completion | 27 Mar 2011 | DLD verified |
| Units in the project | 332 | DLD verified |
| Project area | 27 126 sqm | DLD verified |
| Project number | 44 | DLD verified |

## Latest registered sales

| Date | Property | Registration | Size sqft | Price AED | AED/sqft |
|---|---|---|---|---|---|
| 2026-11-06 | Office — THE METROPOLIS | Ready | 1 087 | 1 962 545 | — |
| 2026-11-06 | Office — THE METROPOLIS | Ready | 877 | 1 550 000 | — |
| 2026-10-20 | Office — THE METROPOLIS | Ready | 877 | 2 150 000 | — |
| 2026-10-09 | Office — THE METROPOLIS | Ready | 574 | 1 750 000 | — |
| 2026-08-06 | Office — THE METROPOLIS | Ready | 634 | 975 016 | — |
| 2026-06-22 | Office — THE METROPOLIS | Ready | 1 159 | 2 550 000 | — |
| 2026-06-03 | Office — THE METROPOLIS | Ready | 1 087 | 500 000 | — |
| 2026-04-29 | Office — THE METROPOLIS | Ready | 574 | 1 090 000 | — |
| 2026-02-19 | Office — THE METROPOLIS | Ready | 877 | 1 570 000 | — |
| 2026-02-13 | Office — THE METROPOLIS | Ready | 1 159 | 2 930 000 | — |

| Measure | Value | Year on year |
|---|---|---|
| Median sale price | AED 1.57M | +32.5% |
| Interquartile range | AED 1.17M – AED 1.95M | |
| Median price per sqft | — AED | — |
| Registered sales, 12 months | 15 | -76.6% |
| Off-plan share | 0.0% | |

## Price per square foot by month

| Month | Sales | Median AED/sqft | IQR |
|---|---|---|---|

## What these numbers do not show

- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 15 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

## Nearby projects (within 1.2 km)

| Project | Distance m | Status | Built | Units |
|---|---|---|---|---|
| [Marquise Square Tower](https://datadubai.ae/projects/marquise-square-tower/) | 60 | Finished | 100% | 428 |
| [Opal Tower](https://datadubai.ae/projects/opal-tower/) | 119 | Finished | 100% | 206 |
| [Prive By Damac](https://datadubai.ae/projects/prive-by-damac/) | 139 | Finished | 100% | 1 056 |
| [Elite Downtown Residence](https://datadubai.ae/projects/elite-downtown-residence/) | 166 | Finished | 100% | 469 |
| [Westburry Tower](https://datadubai.ae/projects/westburry-tower/) | 214 | Finished | 100% | 280 |
| [Bellevue Towers](https://datadubai.ae/projects/bellevue-towers/) | 292 | Finished | 100% | 365 |
| [Marasi Riverside](https://datadubai.ae/projects/marasi-riverside/) | 332 | Cancelled | 1% |  |
| [Mayfair Residency](https://datadubai.ae/projects/mayfair-residency/) | 357 | Finished | 100% | 217 |
| [Bay Square](https://datadubai.ae/projects/bay-square/) | 359 | Finished | 100% | 1 036 |
| [Mayfair Tower](https://datadubai.ae/projects/mayfair-tower/) | 385 | Finished | 100% | 224 |


## Questions and answers

**Who is the developer of The Mertopolis?**

The Dubai Land Department project registry lists Deyaar Development (P.J.S.C) as the developer of The Mertopolis.

**Is The Mertopolis completed?**

The DLD registry status of The Mertopolis is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 27 Mar 2011 — a registry date, not a handover promise.

**How many homes are in The Mertopolis?**

The DLD registry records 332 units in The Mertopolis.

**What is the price per square foot in The Mertopolis?**

Too few sales were registered in The Mertopolis in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

**Where is The Mertopolis?**

The Mertopolis is in the Business Bay community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Marquise Square Tower, about 60 m away.

**Where does this data come from?**

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 25 Nov 2026.

---

**Source:** Dubai Land Department open data, compiled by Continental Club Property  
**Data through:** 25 Nov 2026  
**Methodology:** https://datadubai.ae/methodology/ (v1.0)  
**License:** Reuse permitted with attribution  
**Canonical:** https://datadubai.ae/projects/the-mertopolis/  
**Suggested citation:** Continental Club Property, "The Mertopolis", Data Dubai, data through 25 Nov 2026, https://datadubai.ae/projects/the-mertopolis/  
**Disclaimer:** Registered transactions, not asking prices. Not investment advice, not a valuation. Not affiliated with or endorsed by the Dubai Land Department.
