# Zenith Tower A2

Zenith Tower A2 is a project by Zenith Smart Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

## Registry record

| Field | Value | Provenance |
|---|---|---|
| Developer | Zenith Smart Real Estate Development L.L.C | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% | DLD verified |
| Registered with DLD | 10 Dec 2014 | DLD verified |
| Construction started | 20 Oct 2013 | DLD verified |
| Declared completion | 25 Aug 2016 | DLD verified |
| Units in the project | 161 | DLD verified |
| Project area | 14 372 sqm | DLD verified |
| Escrow agent | Abu Dhabi Commercial Bank | DLD verified |
| Project number | 923 | DLD verified |

## Latest registered sales

| Date | Property | Registration | Size sqft | Price AED | AED/sqft |
|---|---|---|---|---|---|
| 2026-11-18 | 2 B/R Flat | Ready | 1 016 | 920 000 | 905 |
| 2026-07-13 | Studio Flat | Ready | 447 | 465 000 | 1 040 |
| 2026-04-07 | 1 B/R Flat | Ready | 854 | 850 000 | 996 |

| Measure | Value | Year on year |
|---|---|---|
| Median sale price | — | — |
| Interquartile range | — – — | |
| Median price per sqft | — AED | — |
| Registered sales, 12 months | 2 | -75.0% |
| Off-plan share | 0.0% | |

## By number of bedrooms

| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios | 1 | — | — | — | — | — |
| 1-bedroom apartments | 1 | — | — | — | — | — |

## Price per square foot by month

| Month | Sales | Median AED/sqft | IQR |
|---|---|---|---|
| Dec 2021 | 7 | 531 | 475 – 537 |

## What these numbers do not show

- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 2 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

## Nearby projects (within 1.2 km)

| Project | Distance m | Status | Built | Units |
|---|---|---|---|---|
| [Chess Tower](https://datadubai.ae/projects/chess-tower/) | 80 | Cancelled | 41% |  |
| [Grand Horizon 1](https://datadubai.ae/projects/grand-horizon-1/) | 81 | Finished | 100% | 126 |
| [Elite 9 Sports Residence](https://datadubai.ae/projects/elite-9-sports-residence/) | 156 | Finished | 100% | 288 |
| [Eagle Heights](https://datadubai.ae/projects/eagle-heights/) | 160 | Finished | 100% | 292 |
| [Olympic Park 6](https://datadubai.ae/projects/olympic-park-6/) | 162 | Finished | 100% | 154 |
| [Arabian & Spainsh Tower (Phase 2)](https://datadubai.ae/projects/arabian-and-spainsh-tower-phase-2/) | 188 | Cancelled | 27% |  |
| [Victory Heights - Phase 2](https://datadubai.ae/projects/victory-heights-phase-2/) | 276 | Finished | 100% | 30 |
| [Canal Residence West (Phase 1)](https://datadubai.ae/projects/canal-residence-west-phase-1/) | 281 | Finished | 100% | 612 |
| [Champions Tower2](https://datadubai.ae/projects/champions-tower2/) | 283 | Active | 78% | 172 |
| [Royale Residence2](https://datadubai.ae/projects/royale-residence2/) | 284 | Finished | 100% | 196 |


## Questions and answers

**Who is the developer of Zenith Tower A2?**

The Dubai Land Department project registry lists Zenith Smart Real Estate Development L.L.C as the developer of Zenith Tower A2.

**Is Zenith Tower A2 completed?**

The DLD registry status of Zenith Tower A2 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 25 Aug 2016 — a registry date, not a handover promise.

**How many homes are in Zenith Tower A2?**

The DLD registry records 161 units in Zenith Tower A2.

**What is the price per square foot in Zenith Tower A2?**

Too few sales were registered in Zenith Tower A2 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

**Who holds the escrow account for Zenith Tower A2?**

The escrow agent recorded by DLD for Zenith Tower A2 is Abu Dhabi Commercial Bank.

**Where is Zenith Tower A2?**

Zenith Tower A2 is in the Dubai Sports City community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Chess Tower, about 80 m away.

**Where does this data come from?**

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

---

**Source:** Dubai Land Department open data, compiled by Continental Club Property  
**Data through:** 24 Nov 2026  
**Methodology:** https://datadubai.ae/methodology/ (v1.0)  
**License:** Reuse permitted with attribution  
**Canonical:** https://datadubai.ae/projects/zenith-tower-a2/  
**Suggested citation:** Continental Club Property, "Zenith Tower A2", Data Dubai, data through 24 Nov 2026, https://datadubai.ae/projects/zenith-tower-a2/  
**Disclaimer:** Registered transactions, not asking prices. Not investment advice, not a valuation. Not affiliated with or endorsed by the Dubai Land Department.
