Aark Terraces

Aark TerracesActive0% built131 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Aark Terraces: ChatGPT · Claude · Perplexity

Aark Terraces is a project by Aark Developers L.L.C, recorded at 0% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAark Developers L.L.C
StatusActive
Construction progress0% — at the last DLD inspection
Registered with DLD21 May 2025
Construction started1 Apr 2025
Declared completion30 Jun 2028 — registry date, not a handover promise
Units in the project131
Project area12 571 sqm
Escrow agentMashreq Bank Psc
Project number3686

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 30 Apr 2025 at 0.0% to 6 Oct 2026 at 0.0%. The recorded percentage is the same as at the inspection on 30 Apr 2025: no inspection since then changed it. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2028-06-302025-04-302026-10-06

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
6 Oct 20260.0% +0.0 pp
27 Jul 20260.0% +0.0 pp
5 Jan 20260.0% +0.0 pp
30 Apr 20250.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Aark Terraces: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

Questions about Aark Terraces

Who is the developer of Aark Terraces?

The Dubai Land Department project registry lists Aark Developers L.L.C as the developer of Aark Terraces.

Is Aark Terraces completed?

The DLD registry status of Aark Terraces is Active, 0% complete at the last DLD inspection. The declared completion date in the registry is 30 Jun 2028 — a registry date, not a handover promise.

How many homes are in Aark Terraces?

The DLD registry records 131 units in Aark Terraces.

Who holds the escrow account for Aark Terraces?

The escrow agent recorded by DLD for Aark Terraces is Mashreq Bank Psc.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Aark Terraces — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/aark-terraces/”. Reuse is permitted with attribution.