Ahs Tower
Data through 7 Sep 2026 · DLD project registry and registered sales · trailing 12 months Sep 2025 – Aug 2026 · rebuilt daily
Ahs Tower is a project by Ahs Tower Holding Development L.L.C S.O.C, recorded at 67% complete at its last Dubai Land Department inspection. 77 sales registered in the trailing 12 months at a median AED 22.29M. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 7 Sep 2026 · sample 77 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Ahs Tower Holding Development L.L.C S.O.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 67% — at the last DLD inspection | DLD verified |
| Registered with DLD | 19 Dec 2025 | DLD verified |
| Construction started | 15 Oct 2025 | DLD verified |
| Declared completion | 31 Jan 2027 — registry date, not a handover promise | DLD verified |
| Units in the project | 82 | DLD verified |
| Project area | 35 811 sqm | DLD verified |
| Escrow agent | Abu Dhabi Commercial Bank | DLD verified |
| Project number | 4245 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 7 Sep 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 7 Sep 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 11 Dec 2025 at 60.2% to 19 May 2026 at 67.4%. Over the inspections since 11 Dec 2025 it moved 1.39 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 19 May 2026 | 67.4% | +7.3 pp |
| 11 Dec 2025 | 60.2% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 7 Sep 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 77 | AED 22.29M | — | AED 1.69B |
Source: Registered DLD transactions · Data through 7 Sep 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 31 Jul 2026 | Office — AHS TOWER | Off-plan | 2 434 sqft | AED 14 442 000 | — |
| 12 May 2026 | Office — AHS TOWER | Off-plan | 2 899 sqft | AED 17 595 600 | — |
| 8 May 2026 | Office — AHS TOWER | Off-plan | 6 037 sqft | AED 25 417 600 | — |
| 29 Apr 2026 | Office — AHS TOWER | Off-plan | 3 415 sqft | AED 22 285 000 | — |
| 16 Apr 2026 | Office — AHS TOWER | Off-plan | 3 415 sqft | AED 14 834 419 | — |
| 9 Apr 2026 | Office — AHS TOWER | Off-plan | 3 107 sqft | AED 15 196 829 | — |
| 9 Apr 2026 | Office — AHS TOWER | Off-plan | 2 837 sqft | AED 17 552 205 | — |
| 9 Apr 2026 | Office — AHS TOWER | Off-plan | 3 107 sqft | AED 19 151 055 | — |
| 9 Apr 2026 | Office — AHS TOWER | Off-plan | 2 837 sqft | AED 13 927 794 | — |
| 7 Apr 2026 | Office — AHS TOWER | Off-plan | 3 415 sqft | AED 14 472 640 | — |
| 6 Apr 2026 | Office — AHS TOWER | Off-plan | 3 415 sqft | AED 20 101 900 | — |
| 6 Apr 2026 | Office — AHS TOWER | Off-plan | 2 899 sqft | AED 13 844 901 | — |
Source: Registered DLD transactions · Data through 7 Sep 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Ahs Tower — Dubai Data, Continental Club Property, data through 7 Sep 2026, https://datadubai.ae/projects/ahs-tower/”. Reuse is permitted with attribution.