Data Dubai

Cadi3

Cadi3Cancelled60% built1 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Cadi3: ChatGPT · Claude · Perplexity

Cadi3 is a project by New World Invest Ltd, recorded at 60% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperNew World Invest Ltd
StatusCancelled
Construction progress60% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started16 Mar 2009
Declared completion30 Sep 2015 — registry date, not a handover promise
Units in the project1
Project area2 183 sqm
Escrow agentMashreq Bank Psc
Project number588

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 5 technical inspections for this project, from 20 Sep 2012 at 55.4% to 4 Jan 2017 at 59.5%. The recorded percentage is the same as at the inspection on 29 Sep 2015: no inspection since then changed it. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2015-09-302012-09-202017-01-04

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
4 Jan 201759.5% -0.5 pp
29 Sep 201560.0% +5.6 pp
14 Dec 201454.4% +8.7 pp
20 May 201345.8% -9.6 pp
20 Sep 201255.4% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Cadi3. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Cadi1
Cancelled · Al Masah International Real Estate Development (Llc)
115 m26%—
Cadi4
Cancelled · New World Invest Ltd
120 m43%—
Manhattan
Finished · Al Fara'A Properties (Llc)
147 m100%346
Center Court
Cancelled · Eta Star Property Developers L.L.C
211 m26%156
Park Villa'S
Finished · Arabian Gulf Properties
293 m100%22
Park Villa'S 2
Finished · Arabian Gulf Properties
335 m100%19
Laya Residences
Finished · Laya Developers L.L.C
355 m100%164
Hanover Square
Finished · Acw Holding Ltd
388 m100%419
Luma22
Finished · Townx Real Estate Development L.L.C
395 m100%407
Aces Chateau
Finished · Aces Property Development L.L.C
405 m100%53

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

Questions about Cadi3

Who is the developer of Cadi3?

The Dubai Land Department project registry lists New World Invest Ltd as the developer of Cadi3.

Is Cadi3 completed?

The DLD registry status of Cadi3 is Cancelled, 60% complete at the last DLD inspection. The declared completion date in the registry is 30 Sep 2015 — a registry date, not a handover promise.

How many homes are in Cadi3?

The DLD registry records 1 units in Cadi3.

Who holds the escrow account for Cadi3?

The escrow agent recorded by DLD for Cadi3 is Mashreq Bank Psc.

Where is Cadi3?

Cadi3 is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is Cadi1, about 115 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Cadi3 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/cadi3/”. Reuse is permitted with attribution.