Damac Islands 2 - Bahamas 1
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Damac Islands 2 - Bahamas 1 is a project by Damac Prime Development L.L.C, recorded at 0% complete at its last Dubai Land Department inspection. 475 sales registered in the trailing 12 months at a median AED 2.98M (1 822 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 475 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Damac Prime Development L.L.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 0% — at the last DLD inspection | DLD verified |
| Registered with DLD | 27 Nov 2025 | DLD verified |
| Construction started | 2 May 2026 | DLD verified |
| Declared completion | 30 Jun 2030 — registry date, not a handover promise | DLD verified |
| Units in the project | 544 | DLD verified |
| Project area | 100 826 sqm | DLD verified |
| Escrow agent | First Abu Dhabi Bank P.J.S.C. | DLD verified |
| Project number | 4243 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2026: in the 1 months since, no month reached the five registered sales a median needs (3 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 24 Nov 2025 at 0.0% to 14 May 2026 at 0.3%. Since 24 Nov 2025 the recorded percentage has moved 0.06 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 14 May 2026 | 0.3% | +0.3 pp |
| 24 Nov 2025 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2026 | 16 | AED 3.14M | 1 872 | 1 617 – 2 027 |
| Jul 2026 | 7 | AED 4.18M | 1 740 | 1 513 – 1 868 |
| Jun 2026 | 10 | AED 4.05M | 1 640 | 1 583 – 1 877 |
| May 2026 | 5 | AED 2.90M | 1 821 | 1 820 – 1 873 |
| Apr 2026 | 24 | AED 2.98M | 1 822 | 1 679 – 1 922 |
| Mar 2026 | 42 | AED 3.88M | 1 706 | 1 547 – 1 835 |
| Feb 2026 | 146 | AED 2.90M | 1 822 | 1 685 – 1 872 |
| Jan 2026 | 167 | AED 2.90M | 1 822 | 1 821 – 1 873 |
| Dec 2025 | 55 | AED 2.83M | 1 822 | 1 822 – 1 873 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 4-bedroom apartments | 318 | AED 2.83M | 1 822 | 1 550 sqft | — | — |
| 5-bedroom apartments | 140 | AED 4.11M | 1 626 | 2 517 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 420 | AED 2.98M | 1 822 | AED 1.48B |
| 2025 | 55 | AED 2.83M | 1 822 | AED 165.70M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 21 Sep 2026 | 4 B/R Villa — DAMAC ISLANDS 2 - BAHAMAS 1 | Off-plan | 1 550 sqft | AED 2 903 000 | 1 873 |
| 17 Sep 2026 | 5 B/R Villa — DAMAC ISLANDS 2 - BAHAMAS 1 | Off-plan | 1 557 sqft | AED 3 519 360 | 2 260 |
| 15 Sep 2026 | 5 B/R Villa — DAMAC ISLANDS 2 - BAHAMAS 1 | Off-plan | 2 428 sqft | AED 3 965 760 | 1 633 |
| 26 Aug 2026 | 5 B/R Villa — DAMAC ISLANDS 2 - BAHAMAS 1 | Off-plan | 1 550 sqft | AED 3 142 480 | 2 027 |
| 26 Aug 2026 | 5 B/R Villa — DAMAC ISLANDS 2 - BAHAMAS 1 | Off-plan | 1 550 sqft | AED 3 142 480 | 2 027 |
| 26 Aug 2026 | 5 B/R Villa — DAMAC ISLANDS 2 - BAHAMAS 1 | Off-plan | 1 550 sqft | AED 3 142 480 | 2 027 |
| 24 Aug 2026 | 5 B/R Villa — DAMAC ISLANDS 2 - BAHAMAS 1 | Off-plan | 2 461 sqft | AED 3 891 840 | 1 582 |
| 24 Aug 2026 | 4 B/R Villa — DAMAC ISLANDS 2 - BAHAMAS 1 | Off-plan | 1 551 sqft | AED 2 845 250 | 1 835 |
| 21 Aug 2026 | 5 B/R Villa — DAMAC ISLANDS 2 - BAHAMAS 1 | Off-plan | 2 398 sqft | AED 3 883 200 | 1 620 |
| 21 Aug 2026 | Land — DAMAC ISLANDS 2 - BAHAMAS 1 | Ready | 5 230 sqft | AED 10 758 720 | — |
| 18 Aug 2026 | 5 B/R Villa — DAMAC ISLANDS 2 - BAHAMAS 1 | Off-plan | 2 574 sqft | AED 4 154 000 | 1 614 |
| 14 Aug 2026 | 5 B/R Villa — DAMAC ISLANDS 2 - BAHAMAS 1 | Off-plan | 1 550 sqft | AED 3 143 360 | 2 028 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects by Damac Prime Development L.L.C
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Damac Islands 2 - Bahamas 1 — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/damac-islands-2-bahamas-1/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Damac Islands 2 - Bahamas 1. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.