Green Valley Tower
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Green Valley Tower: ChatGPT · Claude · Perplexity
Green Valley Tower is a project by G V G Real Estate Development, recorded at 4% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | G V G Real Estate Development |
| Status | Cancelled |
| Construction progress | 4% — at the last DLD inspection |
| Registered with DLD | 24 May 2017 |
| Construction started | 15 Aug 2017 |
| Declared completion | 16 Jul 2020 — registry date, not a handover promise |
| Units in the project | 0 |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 1890 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 25 Apr 2018 at 0.5% to 24 Sep 2018 at 4.5%. Over the inspections since 25 Apr 2018 it moved 0.80 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 24 Sep 2018 | 4.5% | +4.0 pp |
| 25 Apr 2018 | 0.5% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 0 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Green Valley Tower. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Reef Residence Finished · Sama Alkhaleej Real Estate Development Co. L.L.C |
109 m | 100% |
| Rigel Cancelled · Five Elements Real Estate Development L.L.C |
151 m | 3% |
| Marwa Homes 2 Finished · New World Developments L.L.C |
217 m | 100% |
| Orchid Residence Cancelled · Al Masah International Real Estate Development (Llc) |
219 m | 31% |
| Knight Bridge Court & Kensngton Manor Finished · Acw Holding Ltd |
244 m | 100% |
| Dar Al Jawhara Finished · Realty One Real Estate Development |
308 m | 100% |
| Westar Reflection Finished · Westar Properties Limited |
330 m | 100% |
| Sobha Daffodil Finished · Sobha Investments Limited |
337 m | 100% |
| Park Corner Finished · Gulf Technical Construction Co( L.L.C) |
347 m | 100% |
| Indigo Ville 2 Finished · Venus Properties Investment Ltd |
350 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
Questions about Green Valley Tower
Who is the developer of Green Valley Tower?
The Dubai Land Department project registry lists G V G Real Estate Development as the developer of Green Valley Tower.
Is Green Valley Tower completed?
The DLD registry status of Green Valley Tower is Cancelled, 4% complete at the last DLD inspection. The declared completion date in the registry is 16 Jul 2020 — a registry date, not a handover promise.
Who holds the escrow account for Green Valley Tower?
The escrow agent recorded by DLD for Green Valley Tower is Abu Dhabi Commercial Bank.
Where is Green Valley Tower?
Green Valley Tower is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is Reef Residence, about 109 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗