Data Dubai

La Riviera Estate

La Riviera EstateFinished100% built21 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about La Riviera Estate: ChatGPT · Claude · Perplexity

La Riviera Estate is a project by B And M Fzco, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperB And M Fzco
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD27 Apr 2008
Construction started27 Apr 2008
Declared completion15 Oct 2014 — registry date, not a handover promise
Units in the project21
Project area19 487 sqm
Escrow agentUnited Bank Limited (Management Office)
Project number619

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 29 Jul 2013 at 66.8% to 22 Jun 2014 at 94.2%. Over the inspections since 29 Jul 2013 it moved 2.55 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2014-10-152013-07-292014-06-22

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
22 Jun 201494.2% +16.7 pp
12 Jan 201477.6% +10.8 pp
29 Jul 201366.8% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Buildings in this project

Building (DLD name)SalesMedian priceMedian AED/sqftOff-plan
Lariviera Estate-B insufficient data 0— ——
Lariviera Estate-A insufficient data 0— ——

Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of La Riviera Estate. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Aliva Green
Active · Gulf Land Property Developers L.L.C
112 m52%268
Serenity Lakes 5
Finished · Gulf Land Property Developers L.L.C
118 m100%305
Haven Villas
Finished · Gnhomes Real Estate Development L.L.C
190 m100%14
The Habitat
Finished · Radiant Star Properties L.L.C
202 m100%14
La-Riviera Apartments
Finished · Riviera Properties Development
252 m100%146
Chaimaa Premiere
Finished · Deval Real Estate Development L.L.C
278 m100%96
Haven Villas 1
Finished · Gnhomes Real Estate Development L.L.C
279 m100%16
Seasons Community- Summer
Finished · Seasons Development Limited
295 m100%179
Spica
Finished · Five Elements Real Estate Development L.L.C
341 m100%130
Iris Park
Finished · Ab Properties Limited
362 m100%15

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

Questions about La Riviera Estate

Who is the developer of La Riviera Estate?

The Dubai Land Department project registry lists B And M Fzco as the developer of La Riviera Estate.

Is La Riviera Estate completed?

The DLD registry status of La Riviera Estate is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 15 Oct 2014 — a registry date, not a handover promise.

How many homes are in La Riviera Estate?

The DLD registry records 21 units in La Riviera Estate.

Who holds the escrow account for La Riviera Estate?

The escrow agent recorded by DLD for La Riviera Estate is United Bank Limited (Management Office).

Where is La Riviera Estate?

La Riviera Estate is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is Aliva Green, about 112 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “La Riviera Estate — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/la-riviera-estate/”. Reuse is permitted with attribution.