One.B Tower
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about One.B Tower: ChatGPT · Claude · Perplexity
One.B Tower is a project by 1b Tower Co. L.L.C, recorded at 10% complete at its last Dubai Land Department inspection. 21 sales registered in the trailing 12 months at a median AED 3.74M (2 743 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 21 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | 1b Tower Co. L.L.C |
| Status | Active |
| Construction progress | 10% — at the last DLD inspection |
| Registered with DLD | 25 Sep 2024 |
| Construction started | 1 Mar 2025 |
| Declared completion | 31 Dec 2028 — registry date, not a handover promise |
| Units in the project | 262 |
| Project area | 41 809 sqm |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) |
| Project number | 3206 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Dec 2025: in the 10 months since, no month reached the five registered sales a median needs (14 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 4 technical inspections for this project, from 6 Aug 2024 at 0.0% to 8 Oct 2026 at 10.1%. Since 5 May 2025 the recorded percentage has moved 0.47 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 8 Oct 2026 | 10.1% | +4.3 pp |
| 3 Mar 2026 | 5.8% | +3.7 pp |
| 5 May 2025 | 2.1% | +2.1 pp |
| 6 Aug 2024 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
The DLD unit register lists 260 homes in One.B Tower, and 180 off-plan sale registrations have been recorded since November 2024, as of 23 Nov 2026. After 2 years of sales, resales make up a growing part of those registrations, so we do not turn them into an unsold count.
| Homes | In unit register | Registered sales |
|---|---|---|
| Studios | 1 | 0 |
| 1 bedroom | 72 | 56 |
| 2 bedrooms | 136 | 97 |
| 3 bedrooms | 35 | 24 |
| 4+ bedrooms | 16 | 3 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (6) | 6 | AED 2.55M | 3 640 | 691 sqft | — | — |
| 2-bedroom apartments low sample (12) | 12 | AED 3.92M | 2 533 | 1 466 sqft | — | — |
| 3-bedroom apartments insufficient data | 1 | — | — | — | — | — |
| 4-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 15 Oct 2026 | 2 B/R Flat | Off-plan | 1 796 sqft | AED 3 618 000 | 2 015 |
| 1 Oct 2026 | 2 B/R Flat | Off-plan | 1 796 sqft | AED 3 738 000 | 2 081 |
| 16 Sep 2026 | 4 B/R Flat | Off-plan | 3 956 sqft | AED 12 212 000 | 3 087 |
| 11 Sep 2026 | 4 B/R Flat | Off-plan | 3 956 sqft | AED 12 129 000 | 3 066 |
| 15 Jul 2026 | 2 B/R Flat | Off-plan | 1 697 sqft | AED 3 976 000 | 2 342 |
| 1 Jun 2026 | 2 B/R Flat | Off-plan | 1 395 sqft | AED 3 801 000 | 2 725 |
| 25 May 2026 | 2 B/R Flat | Off-plan | 1 400 sqft | AED 3 863 000 | 2 759 |
| 9 Apr 2026 | 1 B/R Flat | Off-plan | 945 sqft | AED 2 273 000 | 2 404 |
| 9 Apr 2026 | 3 B/R Flat | Off-plan | 2 207 sqft | AED 5 044 000 | 2 285 |
| 8 Apr 2026 | 2 B/R Flat | Off-plan | 1 466 sqft | AED 3 995 000 | 2 726 |
| 16 Feb 2026 | 2 B/R Flat | Off-plan | 1 693 sqft | AED 3 633 000 | 2 147 |
| 10 Feb 2026 | 1 B/R Flat | Off-plan | 682 sqft | AED 2 487 000 | 3 646 |
| 10 Feb 2026 | 1 B/R Flat | Off-plan | 682 sqft | AED 2 477 000 | 3 634 |
| 28 Jan 2026 | 2 B/R Flat | Off-plan | 2 116 sqft | AED 4 591 000 | 2 169 |
| 29 Dec 2025 | 1 B/R Flat | Off-plan | 697 sqft | AED 2 825 000 | 4 054 |
| 29 Dec 2025 | 1 B/R Flat | Off-plan | 686 sqft | AED 2 604 000 | 3 797 |
| 29 Dec 2025 | 2 B/R Flat | Off-plan | 1 466 sqft | AED 4 121 000 | 2 812 |
| 29 Dec 2025 | 1 B/R Flat | Off-plan | 951 sqft | AED 2 692 000 | 2 831 |
| 15 Dec 2025 | 2 B/R Flat | Off-plan | 1 466 sqft | AED 4 020 000 | 2 743 |
| 21 Nov 2025 | 2 B/R Flat | Off-plan | 1 399 sqft | AED 3 199 000 | 2 286 |
| 3 Nov 2025 | 2 B/R Flat | Off-plan | 1 466 sqft | AED 4 096 000 | 2 795 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for One.B Tower: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 14 | AED 3.77M | 2 564 | AED 43.50M |
| 2025 | 111 | AED 3.71M | 2 519 | AED 419.53M |
| 2024 | 55 | AED 3.55M | 2 408 | AED 189.77M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Dec 2025 | 5 | AED 2.83M | 2 831 | 2 812 – 3 797 |
| Nov 2025 | 2 | — | — | — |
| Oct 2025 | 22 | AED 3.98M | 2 875 | 2 730 – 3 709 |
| Sep 2025 | 1 | — | — | — |
| Aug 2025 | 2 | — | — | — |
| Jul 2025 | 1 | — | — | — |
| Jun 2025 | 0 | — | — | — |
| May 2025 | 14 | AED 3.81M | 2 317 | 2 050 – 2 666 |
| Apr 2025 | 7 | AED 3.86M | 2 569 | 2 384 – 2 831 |
| Mar 2025 | 6 | AED 4.39M | 2 609 | 2 373 – 2 853 |
| Feb 2025 | 8 | AED 3.28M | 2 139 | 1 941 – 2 535 |
| Jan 2025 | 42 | AED 3.71M | 2 397 | 2 181 – 2 544 |
| Dec 2024 | 1 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
Questions about One.B Tower
Who is the developer of One.B Tower?
The Dubai Land Department project registry lists 1b Tower Co. L.L.C as the developer of One.B Tower.
Is One.B Tower completed?
The DLD registry status of One.B Tower is Active, 10% complete at the last DLD inspection. The declared completion date in the registry is 31 Dec 2028 — a registry date, not a handover promise.
How many homes are in One.B Tower?
The DLD registry records 262 units in One.B Tower. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in One.B Tower?
Over the last 12 complete months the median registered sale in One.B Tower was AED 3.74M, or AED 2 743 per sqft, from 21 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for One.B Tower?
The escrow agent recorded by DLD for One.B Tower is Emirates Nbd Bank (P.J.S.C).
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for One.B Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.