One Za'Abeel
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about One Za'Abeel: ChatGPT · Claude · Perplexity
One Za'Abeel is a project by One Zaabeel L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 41 sales registered in the trailing 12 months at a median AED 7.55M (4 095 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 41 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | One Zaabeel L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 20 May 2022 |
| Construction started | 3 Jan 2016 |
| Declared completion | 29 Dec 2023 — registry date, not a handover promise |
| Units in the project | 484 |
| Project area | 277 252 sqm |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) |
| Project number | 2388 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Oct 2025: in the 12 months since, no month reached the five registered sales a median needs (17 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 4 technical inspections for this project, from 9 May 2022 at 70.5% to 15 Nov 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 15 Nov 2023 | 100.0% | +7.9 pp |
| 20 Jun 2023 | 92.1% | +9.0 pp |
| 11 Oct 2022 | 83.1% | +12.6 pp |
| 9 May 2022 | 70.5% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (12) | 12 | AED 6.20M | 6 308 | 1 328 sqft | — | — |
| 2-bedroom apartments | 27 | AED 8.38M | 3 872 | 2 016 sqft | — | — |
| 3-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 23 Nov 2026 | 1 B/R Hotel Apartment — Tower | Ready | 856 sqft | AED 4 100 000 | 4 791 |
| 19 Nov 2026 | 3 B/R Hotel Apartment — Tower | Ready | 3 419 sqft | AED 30 000 000 | 8 775 |
| 18 Nov 2026 | 1 B/R Hotel Apartment — Tower | Ready | 1 505 sqft | AED 9 500 000 | 6 314 |
| 17 Nov 2026 | 2 B/R Flat — The Residences | Ready | 1 611 sqft | AED 7 500 000 | 4 655 |
| 16 Nov 2026 | 2 B/R Flat — The Residences | Ready | 2 009 sqft | AED 12 800 000 | 6 372 |
| 13 Nov 2026 | 2 B/R Flat — The Residences | Ready | 2 571 sqft | AED 12 300 000 | 4 783 |
| 10 Nov 2026 | 2 B/R Flat — The Residences | Ready | 3 025 sqft | AED 12 650 000 | 4 182 |
| 9 Nov 2026 | 2 B/R Flat — The Residences | Ready | 2 392 sqft | AED 12 000 000 | 5 016 |
| 6 Nov 2026 | 3 B/R Flat — The Residences | Ready | 3 785 sqft | AED 21 000 000 | 5 548 |
| 28 Oct 2026 | 2 B/R Flat — The Residences | Ready | 2 571 sqft | AED 8 500 000 | 3 306 |
| 28 Oct 2026 | 2 B/R Flat — The Residences | Ready | 3 026 sqft | AED 15 220 000 | 5 031 |
| 28 Oct 2026 | 2 B/R Flat — The Residences | Ready | 1 782 sqft | AED 7 080 800 | 3 975 |
| 21 Oct 2026 | 2 B/R Flat — The Residences | Ready | 2 488 sqft | AED 10 250 000 | 4 120 |
| 20 Oct 2026 | 2 B/R Flat — The Residences | Ready | 2 016 sqft | AED 8 400 000 | 4 166 |
| 12 Oct 2026 | 1 B/R Flat — The Residences | Ready | 1 159 sqft | AED 4 600 000 | 3 969 |
| 9 Sep 2026 | 2 B/R Flat — The Residences | Ready | 1 782 sqft | AED 6 700 000 | 3 761 |
| 7 Sep 2026 | 2 B/R Hotel Apartment — Tower | Ready | 1 539 sqft | AED 9 500 000 | 6 172 |
| 4 Sep 2026 | 2 B/R Flat — The Residences | Ready | 2 572 sqft | AED 12 000 000 | 4 666 |
| 24 Aug 2026 | 3 B/R Flat — The Residences | Ready | 2 436 sqft | AED 5 564 684 | 2 284 |
| 5 Aug 2026 | 2 B/R Flat — The Residences | Ready | 2 016 sqft | AED 10 600 000 | 5 259 |
| 5 Aug 2026 | 2 B/R Flat — The Residences | Ready | 2 016 sqft | AED 8 500 000 | 4 216 |
| 28 Jul 2026 | 1 B/R Hotel Apartment — Tower | Ready | 856 sqft | AED 4 500 000 | 5 259 |
| 28 Jul 2026 | 2 B/R Flat — The Residences | Ready | 3 011 sqft | AED 12 000 000 | 3 986 |
| 16 Jul 2026 | 2 B/R Flat — The Residences | Ready | 2 028 sqft | AED 11 500 000 | 5 669 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for One Za'Abeel: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 32 | AED 7.20M | 3 927 | AED 157.35M |
| 2025 | 49 | AED 7.50M | 4 374 | AED 257.51M |
| 2024 | 68 | AED 6.00M | 3 949 | AED 282.72M |
| 2023 | 193 | AED 6.80M | 3 999 | AED 1.35B |
| 2022 | 154 | AED 8.15M | 4 054 | AED 1.06B |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2024–2026
| Year | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 300k | 600k | — |
| 2025 | 310k | 600k | 6.34% |
| 2024 | 365k | 550k | 7.19% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Oct 2025 | 5 | AED 5.35M | 5 755 | 3 603 – 6 252 |
| Sep 2025 | 0 | — | — | — |
| Aug 2025 | 2 | — | — | — |
| Jul 2025 | 1 | — | — | — |
| Jun 2025 | 1 | — | — | — |
| May 2025 | 2 | — | — | — |
| Apr 2025 | 0 | — | — | — |
| Mar 2025 | 5 | AED 8.00M | — | — |
| Feb 2025 | 7 | AED 11.36M | — | — |
| Jan 2025 | 2 | — | — | — |
| Dec 2024 | 1 | — | — | — |
| Nov 2024 | 7 | AED 7.90M | — | — |
| Oct 2024 | 6 | AED 6.61M | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| One Za'abeel The Residences | 30 | AED 7.14M | 3 871 | 0.0% |
| One Za'Abeel Tower low sample (11) | 11 | AED 9.50M | 6 308 | 0.0% |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
Questions about One Za'Abeel
Who is the developer of One Za'Abeel?
The Dubai Land Department project registry lists One Zaabeel L.L.C as the developer of One Za'Abeel.
Is One Za'Abeel completed?
The DLD registry status of One Za'Abeel is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 29 Dec 2023 — a registry date, not a handover promise.
How many homes are in One Za'Abeel?
The DLD registry records 484 units in One Za'Abeel.
What is the price per square foot in One Za'Abeel?
Over the last 12 complete months the median registered sale in One Za'Abeel was AED 7.55M, or AED 4 095 per sqft, from 41 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for One Za'Abeel?
The escrow agent recorded by DLD for One Za'Abeel is Emirates Nbd Bank (P.J.S.C).
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗