Parkway By Prestige One
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Parkway By Prestige One is a project by Prestige The Parkway Real Estate Development L.L.C, recorded at 11% complete at its last Dubai Land Department inspection. 89 sales registered in the trailing 12 months at a median AED 1.74M (1 955 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 89 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Prestige The Parkway Real Estate Development L.L.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 11% — at the last DLD inspection | DLD verified |
| Registered with DLD | 30 Oct 2024 | DLD verified |
| Construction started | 1 Feb 2025 | DLD verified |
| Declared completion | 31 Jan 2028 — registry date, not a handover promise | DLD verified |
| Units in the project | 274 | DLD verified |
| Project area | 25 692 sqm | DLD verified |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) | DLD verified |
| Project number | 3272 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Mar 2026: in the 6 months since, no month reached the five registered sales a median needs (8 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 4 Sep 2024 at 0.0% to 17 Aug 2026 at 10.9%. Over the inspections since 20 Jun 2025 it moved 0.77 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 17 Aug 2026 | 10.9% | +3.2 pp |
| 12 May 2026 | 7.7% | +1.6 pp |
| 20 Jan 2026 | 6.0% | +5.1 pp |
| 9 Oct 2025 | 0.9% | +0.7 pp |
| 20 Jun 2025 | 0.2% | +0.2 pp |
| 4 Sep 2024 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Mar 2026 | 9 | AED 1.77M | 1 932 | 1 932 – 1 932 |
| Feb 2026 | 7 | AED 1.69M | 1 996 | 1 850 – 2 157 |
| Jan 2026 | 8 | AED 1.94M | 2 084 | 1 932 – 2 269 |
| Dec 2025 | 8 | AED 1.67M | 2 090 | 1 891 – 2 253 |
| Nov 2025 | 40 | AED 1.64M | 1 932 | 1 909 – 2 050 |
| Oct 2025 | 9 | AED 1.90M | 2 000 | 1 954 – 2 228 |
| Sep 2025 | 14 | AED 1.61M | 1 904 | 1 773 – 2 010 |
| Aug 2025 | 22 | AED 1.64M | 2 017 | 1 932 – 2 186 |
| Jul 2025 | 55 | AED 1.48M | 1 909 | 1 770 – 2 040 |
| Jun 2025 | 9 | AED 2.09M | 1 888 | 1 864 – 1 957 |
| May 2025 | 6 | AED 2.13M | 1 934 | 1 918 – 1 983 |
| Apr 2025 | 11 | AED 1.67M | 1 957 | 1 883 – 2 049 |
| Mar 2025 | 3 | — | — | — |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments | 54 | AED 1.57M | 1 932 | 742 sqft | — | — |
| 2-bedroom apartments | 29 | AED 2.41M | 1 964 | 1 115 sqft | — | — |
| 3-bedroom apartments low sample (6) | 6 | AED 3.36M | 1 932 | 1 737 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 32 | AED 2.00M | 1 948 | AED 66.72M |
| 2025 | 215 | AED 1.65M | 1 932 | AED 397.88M |
| 2024 | 12 | AED 2.19M | 1 964 | AED 80.56M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 30 Jul 2026 | 2 B/R Flat — PARKWAY BY PRESTIGE ONE | Off-plan | 1 301 sqft | AED 2 555 500 | 1 964 |
| 30 Jul 2026 | 2 B/R Flat — PARKWAY BY PRESTIGE ONE | Off-plan | 1 301 sqft | AED 2 406 850 | 1 850 |
| 20 Jul 2026 | 2 B/R Flat — PARKWAY BY PRESTIGE ONE | Off-plan | 1 301 sqft | AED 2 556 800 | 1 965 |
| 1 Jun 2026 | 2 B/R Flat — PARKWAY BY PRESTIGE ONE | Off-plan | 1 301 sqft | AED 2 555 500 | 1 964 |
| 15 May 2026 | 1 B/R Flat — PARKWAY BY PRESTIGE ONE | Off-plan | 742 sqft | AED 1 313 453 | 1 770 |
| 11 May 2026 | 2 B/R Flat — PARKWAY BY PRESTIGE ONE | Off-plan | 1 301 sqft | AED 2 798 450 | 2 151 |
| 23 Apr 2026 | 2 B/R Flat — PARKWAY BY PRESTIGE ONE | Off-plan | 1 114 sqft | AED 2 142 000 | 1 923 |
| 13 Apr 2026 | 2 B/R Flat — PARKWAY BY PRESTIGE ONE | Off-plan | 1 299 sqft | AED 2 915 000 | 2 244 |
| 13 Mar 2026 | 1 B/R Flat — PARKWAY BY PRESTIGE ONE | Off-plan | 740 sqft | AED 1 429 716 | 1 932 |
| 13 Mar 2026 | 3 B/R Flat — PARKWAY BY PRESTIGE ONE | Off-plan | 1 737 sqft | AED 3 356 251 | 1 932 |
| 13 Mar 2026 | 1 B/R Flat — PARKWAY BY PRESTIGE ONE | Off-plan | 915 sqft | AED 1 768 481 | 1 932 |
| 12 Mar 2026 | 1 B/R Flat — PARKWAY BY PRESTIGE ONE | Off-plan | 742 sqft | AED 1 432 628 | 1 932 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Parkway By Prestige One — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/parkway-by-prestige-one/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Parkway By Prestige One. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.