Tura Residence
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Tura Residence: ChatGPT · Claude · Perplexity
Tura Residence is a project by Namat Real Estate Development L.L.C, recorded at 1% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Namat Real Estate Development L.L.C |
| Status | Active |
| Construction progress | 1% — at the last DLD inspection |
| Registered with DLD | 23 Feb 2026 |
| Construction started | 30 Apr 2026 |
| Declared completion | 30 Apr 2029 — registry date, not a handover promise |
| Units in the project | 23 |
| Project area | 3 249 sqm |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) |
| Project number | 4318 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 7 Jan 2026 at 0.0% to 13 Jul 2026 at 0.7%. Since 7 Jan 2026 the recorded percentage has moved 0.11 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 13 Jul 2026 | 0.7% | +0.7 pp |
| 7 Jan 2026 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 0 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
Questions about Tura Residence
Who is the developer of Tura Residence?
The Dubai Land Department project registry lists Namat Real Estate Development L.L.C as the developer of Tura Residence.
Is Tura Residence completed?
The DLD registry status of Tura Residence is Active, 1% complete at the last DLD inspection. The declared completion date in the registry is 30 Apr 2029 — a registry date, not a handover promise.
How many homes are in Tura Residence?
The DLD registry records 23 units in Tura Residence.
Who holds the escrow account for Tura Residence?
The escrow agent recorded by DLD for Tura Residence is Emirates Nbd Bank (P.J.S.C).
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗