Data Dubai

Volta Tower

Volta TowerActive29% built417 homesDLD data through 25 Nov 2026

Updated 25 Nov 2026 · latest DLD registrations 25 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Volta Tower: ChatGPT · Claude · Perplexity

Volta Tower is a project by Damac C S L Investment L.L.C, recorded at 29% complete at its last Dubai Land Department inspection. 24 sales registered in the trailing 12 months at a median AED 2.99M (2 413 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 2.99M -3.8% y/y
≈ US$ 815k · typical range AED 2.02M – AED 3.46M
DLD verified
Median price per sqft
AED 2 413/sqft -1.5% y/y
typical range 2 169 – 2 669 AED/sqft
DLD verified
Registered sales
24 -31.4% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 25 Nov 2026 · sample 24 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDamac C S L Investment L.L.C
StatusActive
Construction progress29% — at the last DLD inspection
Registered with DLD27 Sep 2023
Construction started13 Dec 2023
Declared completion31 Dec 2027 — registry date, not a handover promise
Units in the project417
Project area44 016 sqm
Escrow agentEmirates Nbd Bank (P.J.S.C)
Project number2782

Source: DLD project registry (Mashrooi) · Data through 25 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

2 2502 5002 750Oct 2023Feb 2024Jun 2024Oct 2024Feb 2025Jun 2025Oct 2025Feb 2026Jun 20262 2502 5002 750Oct 2023Sep 2024Aug 2025Jul 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 25 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2025: in the 14 months since, no month reached the five registered sales a median needs (32 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 8 technical inspections for this project, from 14 Sep 2023 at 0.0% to 18 Aug 2026 at 29.3%. Over the inspections since 10 Apr 2025 it moved 1.33 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2027-12-312023-09-142026-08-18

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
18 Aug 202629.3% +8.5 pp
11 Apr 202620.8% +5.9 pp
11 Dec 202514.9% +2.0 pp
4 Aug 202512.8% +5.3 pp
10 Apr 20257.6% +2.3 pp
20 Nov 20245.2% +4.1 pp
5 Jul 20241.1% +1.1 pp
14 Sep 20230.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 25 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

Off-plan sale registrations in Volta Tower (431) already equal 100% of the 417 homes in the DLD unit register, as of 24 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.

HomesIn unit
register
Registered
sales
1 bedroom204215
2 bedrooms173176
3 bedrooms2019
4+ bedrooms2021

Source: DLD unit register and registered off-plan sales · Data through 24 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (11) 11AED 2.00M 2 432 702 sqft — —
2-bedroom apartments low sample (8) 8AED 3.11M 2 164 1 412 sqft — —
4-bedroom apartments low sample (5) 5AED 6.24M 2 632 2 343 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 25 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
27 Jul 20261 B/R FlatOff-plan 1 011 sqftAED 2 301 120 2 276
14 Jul 20261 B/R FlatOff-plan 692 sqftAED 1 977 000 2 858
7 Jul 20261 B/R FlatOff-plan 349 sqftAED 968 875 2 777
7 Jul 20264 B/R FlatOff-plan 2 293 sqftAED 4 700 000 2 050
29 Jun 20264 B/R FlatOff-plan 2 289 sqftAED 5 480 800 2 394
15 Jun 20261 B/R FlatOff-plan 1 011 sqftAED 2 150 000 2 127
11 May 20264 B/R FlatOff-plan 2 343 sqftAED 6 490 000 2 770
6 May 20261 B/R FlatOff-plan 1 085 sqftAED 2 481 600 2 287
1 Apr 20264 B/R FlatOff-plan 2 343 sqftAED 6 890 000 2 940
30 Mar 20261 B/R FlatOff-plan 1 085 sqftAED 2 595 000 2 392
25 Mar 20262 B/R FlatOff-plan 1 437 sqftAED 3 122 000 2 173
25 Feb 20262 B/R FlatOff-plan 1 373 sqftAED 3 346 000 2 436
23 Feb 20262 B/R FlatOff-plan 1 438 sqftAED 3 070 000 2 135
6 Feb 20262 B/R FlatOff-plan 1 414 sqftAED 3 376 000 2 388
29 Jan 20261 B/R FlatOff-plan 727 sqftAED 1 766 940 2 432
27 Jan 20261 B/R FlatOff-plan 691 sqftAED 1 714 000 2 480
27 Jan 20261 B/R FlatOff-plan 702 sqftAED 1 706 180 2 432
26 Dec 20252 B/R FlatOff-plan 1 400 sqftAED 3 017 000 2 155
25 Dec 20251 B/R FlatOff-plan 694 sqftAED 2 021 000 2 911
17 Dec 20252 B/R FlatOff-plan 1 411 sqftAED 3 719 000 2 635
4 Dec 20252 B/R FlatOff-plan 1 442 sqftAED 3 095 000 2 146
25 Nov 20254 B/R FlatOff-plan 2 370 sqftAED 6 239 720 2 632
19 Nov 20251 B/R FlatOff-plan 696 sqftAED 2 000 000 2 874
17 Nov 20252 B/R FlatOff-plan 1 394 sqftAED 2 971 360 2 132

Source: Registered DLD transactions · Data through 25 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Volta Tower: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

010020020152023202420252026010020020152023202420252026

registered sales per calendar year; the current year is incomplete

By month

024SepOctNovDecJanFebMarAprMayJunJulAug024OctDecFebAprJunAug

registered sales per month, Sep 2025 – Aug 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202617AED 2.60M 2 394AED 54.14M
202534AED 3.05M 2 448AED 115.77M
2024123AED 3.21M 2 540AED 397.83M
2023258AED 2.07M 2 691AED 693.36M
20151— —AED 120.10M

Source: Registered DLD transactions · Data through 25 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Aug 20255 AED 2.92M2 355 2 136 – 2 451
Jul 20252 —— —
Jun 20251 —— —
May 20252 —— —
Apr 20255 AED 2.07M2 780 2 560 – 2 806
Mar 20251 —— —
Feb 20250 —— —
Jan 20253 —— —
Dec 20242 —— —
Nov 20246 AED 3.60M2 552 2 471 – 2 577
Oct 20243 —— —
Sep 20242 —— —
Aug 20240 —— —

Source: Registered DLD transactions · Data through 25 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

Questions about Volta Tower

Who is the developer of Volta Tower?

The Dubai Land Department project registry lists Damac C S L Investment L.L.C as the developer of Volta Tower.

Is Volta Tower completed?

The DLD registry status of Volta Tower is Active, 29% complete at the last DLD inspection. The declared completion date in the registry is 31 Dec 2027 — a registry date, not a handover promise.

How many homes are in Volta Tower?

The DLD registry records 417 units in Volta Tower. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in Volta Tower?

Over the last 12 complete months the median registered sale in Volta Tower was AED 2.99M, or AED 2 413 per sqft, from 24 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Volta Tower?

The escrow agent recorded by DLD for Volta Tower is Emirates Nbd Bank (P.J.S.C).

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 25 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 25 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Volta Tower — Data Dubai, Continental Club Property, data through 25 Nov 2026, https://datadubai.ae/projects/volta-tower/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Volta Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.