Al Habtoor Tower
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Al Habtoor Tower is a project by Al Habtoor City Real Estate Development (Br. Of Dubai National Investment Co L.L.C), recorded at 90% complete at its last Dubai Land Department inspection. 216 sales registered in the trailing 12 months at a median AED 3.45M (2 749 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 216 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Al Habtoor City Real Estate Development (Br. Of Dubai National Investment Co L.L.C) | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 90% — at the last DLD inspection | DLD verified |
| Registered with DLD | 13 Jun 2023 | DLD verified |
| Construction started | 1 Oct 2022 | DLD verified |
| Declared completion | 31 Dec 2026 — registry date, not a handover promise | DLD verified |
| Units in the project | 1 739 | DLD verified |
| Project area | 401 157 sqm | DLD verified |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) | DLD verified |
| Project number | 2656 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2026: in the 1 months since, no month reached the five registered sales a median needs (4 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 11 technical inspections for this project, from 1 Jun 2023 at 10.1% to 31 Aug 2026 at 90.0%. Over the inspections since 24 Apr 2025 it moved 2.83 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 31 Aug 2026 | 90.0% | +10.0 pp |
| 5 May 2026 | 80.0% | +8.7 pp |
| 30 Jan 2026 | 71.3% | +11.1 pp |
| 14 Oct 2025 | 60.2% | +7.7 pp |
| 22 Aug 2025 | 52.5% | +8.4 pp |
| 24 Apr 2025 | 44.1% | +15.1 pp |
| 27 Sep 2024 | 28.9% | +2.9 pp |
| 18 Jul 2024 | 26.1% | +3.0 pp |
| 18 Apr 2024 | 23.0% | +6.4 pp |
| 15 Feb 2024 | 16.7% | +6.5 pp |
| 1 Jun 2023 | 10.1% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2026 | 5 | AED 3.86M | 2 636 | 2 429 – 2 687 |
| Jul 2026 | 11 | AED 2.77M | 2 389 | 2 291 – 2 874 |
| Jun 2026 | 12 | AED 3.80M | 2 818 | 2 661 – 3 133 |
| May 2026 | 12 | AED 3.41M | 2 541 | 2 443 – 2 766 |
| Apr 2026 | 38 | AED 3.09M | 2 643 | 2 535 – 2 982 |
| Mar 2026 | 14 | AED 3.60M | 2 661 | 2 567 – 2 805 |
| Feb 2026 | 20 | AED 3.60M | 2 589 | 2 476 – 2 784 |
| Jan 2026 | 37 | AED 3.32M | 2 967 | 2 841 – 3 293 |
| Dec 2025 | 20 | AED 3.22M | 2 796 | 2 676 – 2 862 |
| Nov 2025 | 13 | AED 3.52M | 2 773 | 2 515 – 2 947 |
| Oct 2025 | 29 | AED 3.65M | 2 734 | 2 541 – 2 924 |
| Sep 2025 | 29 | AED 3.29M | 2 719 | 2 493 – 2 949 |
| Aug 2025 | 74 | AED 3.47M | 2 916 | 2 544 – 3 113 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments | 136 | AED 3.11M | 2 853 | 1 122 sqft | — | — |
| 2-bedroom apartments | 69 | AED 4.03M | 2 536 | 1 537 sqft | — | — |
| 3-bedroom apartments low sample (11) | 11 | AED 5.73M | 2 520 | 2 283 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 154 | AED 3.44M | 2 732 | AED 540.33M |
| 2025 | 479 | AED 3.40M | 2 597 | AED 1.64B |
| 2024 | 506 | AED 2.60M | 2 612 | AED 1.59B |
| 2023 | 166 | AED 2.46M | 2 744 | AED 505.91M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 21 Sep 2026 | 2 B/R Flat — Al Habtoor Tower | Off-plan | 1 445 sqft | AED 3 788 854 | 2 623 |
| 18 Sep 2026 | 1 B/R Flat — Al Habtoor Tower | Off-plan | 1 001 sqft | AED 2 835 838 | 2 832 |
| 17 Sep 2026 | 2 B/R Flat — Al Habtoor Tower | Off-plan | 2 024 sqft | AED 4 926 355 | 2 434 |
| 8 Sep 2026 | 2 B/R Flat — Al Habtoor Tower | Off-plan | 1 547 sqft | AED 3 614 866 | 2 337 |
| 20 Aug 2026 | 1 B/R Flat — Al Habtoor Tower | Off-plan | 1 004 sqft | AED 2 870 774 | 2 860 |
| 18 Aug 2026 | 2 B/R Flat — Al Habtoor Tower | Off-plan | 1 466 sqft | AED 3 938 795 | 2 687 |
| 18 Aug 2026 | 2 B/R Flat — Al Habtoor Tower | Off-plan | 1 464 sqft | AED 3 858 509 | 2 636 |
| 4 Aug 2026 | 1 B/R Flat — Al Habtoor Tower | Off-plan | 1 019 sqft | AED 2 356 727 | 2 312 |
| 4 Aug 2026 | 2 B/R Flat — Al Habtoor Tower | Off-plan | 2 016 sqft | AED 4 896 014 | 2 429 |
| 30 Jul 2026 | 1 B/R Flat — Al Habtoor Tower | Off-plan | 951 sqft | AED 2 270 992 | 2 389 |
| 24 Jul 2026 | 2 B/R Flat — Al Habtoor Tower | Off-plan | 1 416 sqft | AED 4 348 551 | 3 072 |
| 23 Jul 2026 | 1 B/R Flat — Al Habtoor Tower | Off-plan | 873 sqft | AED 2 650 412 | 3 038 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects by Al Habtoor City Real Estate Development (Br. Of Dubai National Investment Co L.L.C)
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Al Habtoor Tower — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/al-habtoor-tower/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Al Habtoor Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.