Al Habtoor City
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Al Habtoor City is a project by Al Habtoor City Real Estate Development (Br. Of Dubai National Investment Co L.L.C), recorded at 100% complete at its last Dubai Land Department inspection. 77 sales registered in the trailing 12 months at a median AED 2.50M (1 820 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 77 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Al Habtoor City Real Estate Development (Br. Of Dubai National Investment Co L.L.C) | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 2 Aug 2015 | DLD verified |
| Construction started | 1 Jul 2014 | DLD verified |
| Declared completion | 17 Feb 2022 — registry date, not a handover promise | DLD verified |
| Units in the project | 1 485 | DLD verified |
| Project area | 984 099 sqm | DLD verified |
| Escrow agent | First Abu Dhabi Bank P.J.S.C. | DLD verified |
| Project number | 1670 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2026: in the 1 months since, no month reached the five registered sales a median needs (3 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 12 technical inspections for this project, from 1 Jun 2016 at 37.4% to 17 Feb 2022 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 17 Feb 2022 | 100.0% | +3.4 pp |
| 31 Mar 2021 | 96.6% | +3.9 pp |
| 4 Dec 2018 | 92.7% | +2.6 pp |
| 18 Sep 2018 | 90.1% | +8.7 pp |
| 21 Dec 2017 | 81.4% | +0.9 pp |
| 15 Nov 2017 | 80.5% | +2.5 pp |
| 1 Oct 2017 | 78.0% | +6.9 pp |
| 30 Apr 2017 | 71.1% | +3.7 pp |
| 15 Feb 2017 | 67.4% | +7.4 pp |
| 4 Dec 2016 | 60.1% | +10.0 pp |
| 29 Sep 2016 | 50.1% | +12.7 pp |
| 1 Jun 2016 | 37.4% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2026 | 9 | AED 2.50M | 1 803 | 1 658 – 1 912 |
| Jul 2026 | 8 | AED 2.50M | 1 679 | 1 603 – 1 747 |
| Jun 2026 | 9 | AED 2.47M | 1 815 | 1 743 – 1 839 |
| May 2026 | 4 | — | — | — |
| Apr 2026 | 8 | AED 2.38M | 1 985 | 1 833 – 2 045 |
| Mar 2026 | 6 | AED 2.45M | 1 883 | 1 824 – 1 999 |
| Feb 2026 | 4 | — | — | — |
| Jan 2026 | 3 | — | — | — |
| Dec 2025 | 7 | AED 2.30M | 1 954 | 1 718 – 1 972 |
| Nov 2025 | 3 | — | — | — |
| Oct 2025 | 11 | AED 2.70M | 1 820 | 1 776 – 1 974 |
| Sep 2025 | 6 | AED 1.89M | 1 985 | 1 813 – 2 052 |
| Aug 2025 | 9 | AED 2.55M | 1 729 | 1 720 – 1 901 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments | 26 | AED 1.67M | 1 900 | 877 sqft | — | — |
| 2-bedroom apartments | 34 | AED 2.60M | 1 778 | 1 511 sqft | — | — |
| 3-bedroom apartments low sample (11) | 11 | AED 3.75M | 1 885 | 1 976 sqft | — | — |
| 4-bedroom apartments insufficient data | 4 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 56 | AED 2.50M | 1 817 | AED 139.44M |
| 2025 | 106 | AED 2.33M | 1 794 | AED 262.77M |
| 2024 | 110 | AED 2.30M | 1 693 | AED 269.59M |
| 2023 | 232 | AED 2.68M | 2 100 | AED 650.98M |
| 2022 | 231 | AED 1.80M | 1 350 | AED 466.27M |
| 2021 | 594 | AED 1.80M | 1 300 | AED 1.10B |
| 2020 | 132 | AED 1.89M | 1 408 | AED 298.30M |
| 2019 | 46 | AED 1.90M | 1 658 | AED 84.39M |
| 2018 | 18 | AED 2.19M | 1 552 | AED 40.68M |
| 2017 | 71 | AED 2.36M | 2 040 | AED 168.41M |
| 2016 | 109 | AED 2.53M | 2 304 | AED 314.48M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 30 Sep 2026 | 3 B/R Flat — AL HABTOOR CITY | Ready | 1 965 sqft | AED 3 450 000 | 1 756 |
| 25 Sep 2026 | 3 B/R Flat — AL HABTOOR CITY | Ready | 1 965 sqft | AED 3 680 000 | 1 872 |
| 2 Sep 2026 | 4 B/R Flat — AL HABTOOR CITY | Ready | 3 010 sqft | AED 5 550 000 | 1 844 |
| 27 Aug 2026 | 2 B/R Flat — AL HABTOOR CITY | Ready | 1 511 sqft | AED 2 525 000 | 1 671 |
| 27 Aug 2026 | 3 B/R Flat — AL HABTOOR CITY | Ready | 1 976 sqft | AED 3 900 000 | 1 973 |
| 20 Aug 2026 | 6 B/R Flat — AL HABTOOR CITY | Ready | 10 137 sqft | AED 20 000 000 | 1 973 |
| 20 Aug 2026 | 2 B/R Flat — AL HABTOOR CITY | Ready | 1 496 sqft | AED 2 425 000 | 1 621 |
| 19 Aug 2026 | 2 B/R Flat — AL HABTOOR CITY | Ready | 1 368 sqft | AED 2 180 000 | 1 594 |
| 17 Aug 2026 | 2 B/R Flat — AL HABTOOR CITY | Ready | 1 511 sqft | AED 2 500 000 | 1 654 |
| 13 Aug 2026 | 2 B/R Flat — AL HABTOOR CITY | Ready | 1 511 sqft | AED 2 600 000 | 1 721 |
| 6 Aug 2026 | 4 B/R Flat — AL HABTOOR CITY | Ready | 2 937 sqft | AED 5 600 000 | 1 907 |
| 6 Aug 2026 | 1 B/R Flat — AL HABTOOR CITY | Ready | 810 sqft | AED 1 550 000 | 1 914 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects by Al Habtoor City Real Estate Development (Br. Of Dubai National Investment Co L.L.C)
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Al Habtoor City — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/al-habtoor-city/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Al Habtoor City. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.