Alexis Tower
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Alexis Tower: ChatGPT · Claude · Perplexity
Alexis Tower is a project by Reportage Prime Properties L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 35 sales registered in the trailing 12 months at a median AED 560k (1 476 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 35 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Reportage Prime Properties L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 9 Jan 2020 |
| Construction started | 4 Mar 2019 |
| Declared completion | 20 May 2024 — registry date, not a handover promise |
| Units in the project | 378 |
| Project area | 15 680 sqm |
| Escrow agent | Arab Bank For Investment & Foreign Trade Almasref P.J.S.C. |
| Project number | 2187 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2026: in the 8 months since, no month reached the five registered sales a median needs (9 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 17 technical inspections for this project, from 1 Oct 2019 at 3.6% to 17 Dec 2024 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 17 Dec 2024 | 100.0% | +14.2 pp |
| 4 Jun 2024 | 85.8% | +10.0 pp |
| 13 Mar 2024 | 75.8% | +4.3 pp |
| 6 Dec 2023 | 71.4% | +14.1 pp |
| 31 Jul 2023 | 57.4% | +10.2 pp |
| 8 Mar 2023 | 47.1% | +6.7 pp |
| 24 Nov 2022 | 40.4% | +4.8 pp |
| 25 Aug 2022 | 35.5% | +5.5 pp |
| 18 May 2022 | 30.0% | +5.0 pp |
| 10 Feb 2022 | 25.0% | +3.4 pp |
| 4 Jan 2022 | 21.7% | +1.6 pp |
| 14 Sep 2021 | 20.0% | +3.5 pp |
| 13 Jul 2021 | 16.5% | +7.2 pp |
| 20 Jan 2021 | 9.3% | +4.7 pp |
| 24 Aug 2020 | 4.6% | +1.8 pp |
| 14 Jul 2020 | 2.8% | -0.8 pp |
| 1 Oct 2019 | 3.6% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios | 23 | AED 530k | 1 549 | 351 sqft | — | — |
| 1-bedroom apartments low sample (10) | 10 | AED 831k | 1 221 | 696 sqft | — | — |
| 2-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 5 Oct 2026 | Studio Flat | Ready | 348 sqft | AED 562 000 | 1 614 |
| 14 Aug 2026 | 1 B/R Flat | Ready | 605 sqft | AED 750 000 | 1 240 |
| 24 Jul 2026 | Studio Flat | Ready | 357 sqft | AED 510 000 | 1 427 |
| 17 Jul 2026 | Studio Flat | Ready | 250 sqft | AED 300 000 | 1 200 |
| 9 Jun 2026 | Studio Flat | Ready | 343 sqft | AED 530 000 | 1 544 |
| 11 May 2026 | Studio Flat | Ready | 366 sqft | AED 643 533 | 1 760 |
| 6 Apr 2026 | Studio Flat | Ready | 351 sqft | AED 545 000 | 1 554 |
| 26 Mar 2026 | Studio Flat | Ready | 298 sqft | AED 530 000 | 1 778 |
| 17 Mar 2026 | 2 B/R Flat | Ready | 814 sqft | AED 965 000 | 1 186 |
| 23 Feb 2026 | Studio Flat | Ready | 362 sqft | AED 570 000 | 1 577 |
| 10 Feb 2026 | Studio Flat | Ready | 351 sqft | AED 530 000 | 1 511 |
| 5 Feb 2026 | Studio Flat | Ready | 362 sqft | AED 560 000 | 1 549 |
| 4 Feb 2026 | 1 B/R Flat | Ready | 700 sqft | AED 1 065 000 | 1 522 |
| 2 Feb 2026 | Studio Flat | Ready | 340 sqft | AED 640 000 | 1 882 |
| 22 Jan 2026 | 2 B/R Flat | Ready | 814 sqft | AED 1 000 000 | 1 229 |
| 21 Jan 2026 | 1 B/R Flat | Ready | 724 sqft | AED 830 000 | 1 147 |
| 19 Jan 2026 | Studio Flat | Ready | 351 sqft | AED 535 000 | 1 525 |
| 19 Jan 2026 | Studio Flat | Ready | 364 sqft | AED 530 000 | 1 458 |
| 15 Jan 2026 | Studio Flat | Ready | 348 sqft | AED 530 000 | 1 523 |
| 9 Jan 2026 | Studio Flat | Ready | 333 sqft | AED 492 170 | 1 476 |
| 5 Jan 2026 | Studio Flat | Ready | 364 sqft | AED 530 000 | 1 458 |
| 30 Dec 2025 | Studio Flat | Ready | 362 sqft | AED 525 000 | 1 449 |
| 30 Dec 2025 | Studio Flat | Ready | 335 sqft | AED 540 000 | 1 613 |
| 29 Dec 2025 | 1 B/R Flat | Ready | 605 sqft | AED 828 900 | 1 371 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Alexis Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 21 | AED 545k | 1 522 | AED 13.15M |
| 2025 | 125 | AED 538k | 1 246 | AED 60.12M |
| 2024 | 40 | AED 598k | 1 194 | AED 18.00M |
| 2023 | 65 | AED 436k | 1 177 | AED 24.56M |
| 2022 | 123 | AED 439k | 1 207 | AED 51.05M |
| 2021 | 85 | AED 439k | 978 | AED 40.85M |
| 2020 | 2 | — | — | AED 956k |
| 2012 | 1 | — | — | AED 32.12M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Feb 2026 | 5 | AED 570k | 1 549 | 1 522 – 1 577 |
| Jan 2026 | 7 | AED 530k | 1 458 | 1 343 – 1 500 |
| Dec 2025 | 11 | AED 780k | 1 395 | 1 222 – 1 543 |
| Nov 2025 | 3 | — | — | — |
| Oct 2025 | 11 | AED 644k | 1 539 | 1 282 – 1 680 |
| Sep 2025 | 7 | AED 525k | 1 143 | 1 111 – 1 383 |
| Aug 2025 | 3 | — | — | — |
| Jul 2025 | 5 | AED 664k | 1 096 | 1 036 – 1 168 |
| Jun 2025 | 6 | AED 482k | 1 316 | 1 065 – 1 416 |
| May 2025 | 22 | AED 477k | 1 223 | 1 059 – 1 430 |
| Apr 2025 | 12 | AED 532k | 1 369 | 1 069 – 1 490 |
| Mar 2025 | 6 | AED 650k | 1 140 | 987 – 1 263 |
| Feb 2025 | 8 | AED 521k | 1 258 | 1 096 – 1 381 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Down Town Jabal Ali
Questions about Alexis Tower
Who is the developer of Alexis Tower?
The Dubai Land Department project registry lists Reportage Prime Properties L.L.C as the developer of Alexis Tower.
Is Alexis Tower completed?
The DLD registry status of Alexis Tower is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 20 May 2024 — a registry date, not a handover promise.
How many homes are in Alexis Tower?
The DLD registry records 378 units in Alexis Tower.
What is the price per square foot in Alexis Tower?
Over the last 12 complete months the median registered sale in Alexis Tower was AED 560k, or AED 1 476 per sqft, from 35 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Alexis Tower?
The escrow agent recorded by DLD for Alexis Tower is Arab Bank For Investment & Foreign Trade Almasref P.J.S.C..
Where is Alexis Tower?
Alexis Tower is in the Down Town Jabal Ali community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗