Data Dubai

Api- Barsha Residential Tower

Api- Barsha Residential TowerActive93% built335 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Api- Barsha Residential Tower: ChatGPT · Claude · Perplexity

Api- Barsha Residential Tower is a project by Dubai General Properties L.L.C, recorded at 93% complete at its last Dubai Land Department inspection. 13 sales registered in the trailing 12 months at a median AED 3.36M (1 778 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 3.36M +18.1% y/y
≈ US$ 914k · typical range AED 2.94M – AED 3.45M
DLD verified
Median price per sqft
AED 1 778/sqft +2.9% y/y
typical range 1 659 – 1 923 AED/sqft
DLD verified
Registered sales
13 -82.2% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 13 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDubai General Properties L.L.C
StatusActive
Construction progress93% — at the last DLD inspection
Registered with DLD24 Jan 2025
Construction started17 Aug 2021
Declared completion31 Oct 2025 — registry date, not a handover promise
Units in the project335
Project area46 482 sqm
Escrow agentEmirates Nbd Bank (P.J.S.C)
Project number3417

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 6001 8002 000May 2025Jul 2025Sep 2025Nov 2025Jan 2026Mar 2026May 2026Jul 2026Sep 20261 6001 8002 000May 2025Nov 2025May 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Dec 2025: in the 10 months since, no month reached the five registered sales a median needs (6 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 27 Dec 2024 at 78.6% to 17 Feb 2026 at 92.6%. Over the inspections since 27 Dec 2024 it moved 1.02 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2025-10-312024-12-272026-02-17

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
17 Feb 202692.6% +4.9 pp
23 Sep 202587.7% +9.1 pp
27 Dec 202478.6% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

At least 242 of the 328 homes in Api- Barsha Residential Tower (74%) have no off-plan sale registered with the Dubai Land Department yet, as of 23 Nov 2026. The unit register lists 328 homes and DLD has recorded 86 off-plan sale registrations; because that count also includes resales before completion, the true number without a buyer can only be higher. This is not the developer's availability list.

HomesNo sale yet,
at least
In unit
register
Registered
sales
1 bedroom62620
2 bedrooms14419046
3 bedrooms367640

Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
2-bedroom apartments insufficient data 4— — — — —
3-bedroom apartments low sample (9) 9AED 3.40M 1 687 1 914 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
2 Sep 20262 B/R Flat — API - Barsha Residential TowerOff-plan 1 456 sqftAED 2 800 824 1 923
11 Jun 20263 B/R Flat — API - Barsha Residential TowerOff-plan 1 838 sqftAED 3 100 000 1 687
13 May 20262 B/R Flat — API - Barsha Residential TowerOff-plan 1 456 sqftAED 2 868 460 1 970
22 Apr 20262 B/R Flat — API - Barsha Residential TowerOff-plan 1 456 sqftAED 2 944 900 2 022
10 Feb 20263 B/R Flat — API - Barsha Residential TowerOff-plan 2 026 sqftAED 3 101 700 1 531
10 Feb 20263 B/R Flat — API - Barsha Residential TowerOff-plan 1 838 sqftAED 3 402 560 1 851
19 Dec 20253 B/R Flat — API - Barsha Residential TowerOff-plan 2 185 sqftAED 3 509 444 1 606
15 Dec 20253 B/R Flat — API - Barsha Residential TowerOff-plan 2 185 sqftAED 3 525 390 1 614
15 Dec 20253 B/R Flat — API - Barsha Residential TowerOff-plan 1 914 sqftAED 3 403 540 1 778
15 Dec 20253 B/R Flat — API - Barsha Residential TowerOff-plan 2 185 sqftAED 3 624 890 1 659
8 Dec 20253 B/R Flat — API - Barsha Residential TowerOff-plan 1 914 sqftAED 3 356 500 1 753
8 Dec 20253 B/R Flat — API - Barsha Residential TowerOff-plan 1 914 sqftAED 3 450 580 1 803
8 Dec 20252 B/R Flat — API - Barsha Residential TowerOff-plan 1 361 sqftAED 2 709 700 1 991

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Api- Barsha Residential Tower: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

02550752017202520260255075201720252026

registered sales per calendar year; the current year is incomplete

By month

0246NovDecJanFebMarAprMayJunJulAugSepOct0246DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20266AED 3.02M 1 887AED 18.22M
202580AED 2.87M 1 734AED 232.95M
20171— —AED 74.60M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Dec 20257 AED 3.45M1 753 1 636 – 1 790
Nov 20250 —— —
Oct 202510 AED 2.64M1 879 1 829 – 1 986
Sep 202510 AED 2.87M1 816 1 654 – 1 878
Aug 202514 AED 2.77M1 732 1 563 – 1 929
Jul 20255 AED 3.19M1 701 1 459 – 1 712
Jun 20255 AED 2.86M1 723 1 556 – 1 726
May 202526 AED 2.65M1 708 1 594 – 1 794

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 13 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

Questions about Api- Barsha Residential Tower

Who is the developer of Api- Barsha Residential Tower?

The Dubai Land Department project registry lists Dubai General Properties L.L.C as the developer of Api- Barsha Residential Tower.

Is Api- Barsha Residential Tower completed?

The DLD registry status of Api- Barsha Residential Tower is Active, 93% complete at the last DLD inspection. The declared completion date in the registry is 31 Oct 2025 — a registry date, not a handover promise.

How many homes are in Api- Barsha Residential Tower?

The DLD registry records 335 units in Api- Barsha Residential Tower. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in Api- Barsha Residential Tower?

Over the last 12 complete months the median registered sale in Api- Barsha Residential Tower was AED 3.36M, or AED 1 778 per sqft, from 13 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Api- Barsha Residential Tower?

The escrow agent recorded by DLD for Api- Barsha Residential Tower is Emirates Nbd Bank (P.J.S.C).

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Api- Barsha Residential Tower — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/api-barsha-residential-tower/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Api- Barsha Residential Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.