Api- Barsha Residential Tower
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Api- Barsha Residential Tower: ChatGPT · Claude · Perplexity
Api- Barsha Residential Tower is a project by Dubai General Properties L.L.C, recorded at 93% complete at its last Dubai Land Department inspection. 13 sales registered in the trailing 12 months at a median AED 3.36M (1 778 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 13 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Dubai General Properties L.L.C |
| Status | Active |
| Construction progress | 93% — at the last DLD inspection |
| Registered with DLD | 24 Jan 2025 |
| Construction started | 17 Aug 2021 |
| Declared completion | 31 Oct 2025 — registry date, not a handover promise |
| Units in the project | 335 |
| Project area | 46 482 sqm |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) |
| Project number | 3417 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Dec 2025: in the 10 months since, no month reached the five registered sales a median needs (6 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 3 technical inspections for this project, from 27 Dec 2024 at 78.6% to 17 Feb 2026 at 92.6%. Over the inspections since 27 Dec 2024 it moved 1.02 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 17 Feb 2026 | 92.6% | +4.9 pp |
| 23 Sep 2025 | 87.7% | +9.1 pp |
| 27 Dec 2024 | 78.6% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
At least 242 of the 328 homes in Api- Barsha Residential Tower (74%) have no off-plan sale registered with the Dubai Land Department yet, as of 23 Nov 2026. The unit register lists 328 homes and DLD has recorded 86 off-plan sale registrations; because that count also includes resales before completion, the true number without a buyer can only be higher. This is not the developer's availability list.
| Homes | No sale yet, at least | In unit register | Registered sales |
|---|---|---|---|
| 1 bedroom | 62 | 62 | 0 |
| 2 bedrooms | 144 | 190 | 46 |
| 3 bedrooms | 36 | 76 | 40 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 2-bedroom apartments insufficient data | 4 | — | — | — | — | — |
| 3-bedroom apartments low sample (9) | 9 | AED 3.40M | 1 687 | 1 914 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 2 Sep 2026 | 2 B/R Flat — API - Barsha Residential Tower | Off-plan | 1 456 sqft | AED 2 800 824 | 1 923 |
| 11 Jun 2026 | 3 B/R Flat — API - Barsha Residential Tower | Off-plan | 1 838 sqft | AED 3 100 000 | 1 687 |
| 13 May 2026 | 2 B/R Flat — API - Barsha Residential Tower | Off-plan | 1 456 sqft | AED 2 868 460 | 1 970 |
| 22 Apr 2026 | 2 B/R Flat — API - Barsha Residential Tower | Off-plan | 1 456 sqft | AED 2 944 900 | 2 022 |
| 10 Feb 2026 | 3 B/R Flat — API - Barsha Residential Tower | Off-plan | 2 026 sqft | AED 3 101 700 | 1 531 |
| 10 Feb 2026 | 3 B/R Flat — API - Barsha Residential Tower | Off-plan | 1 838 sqft | AED 3 402 560 | 1 851 |
| 19 Dec 2025 | 3 B/R Flat — API - Barsha Residential Tower | Off-plan | 2 185 sqft | AED 3 509 444 | 1 606 |
| 15 Dec 2025 | 3 B/R Flat — API - Barsha Residential Tower | Off-plan | 2 185 sqft | AED 3 525 390 | 1 614 |
| 15 Dec 2025 | 3 B/R Flat — API - Barsha Residential Tower | Off-plan | 1 914 sqft | AED 3 403 540 | 1 778 |
| 15 Dec 2025 | 3 B/R Flat — API - Barsha Residential Tower | Off-plan | 2 185 sqft | AED 3 624 890 | 1 659 |
| 8 Dec 2025 | 3 B/R Flat — API - Barsha Residential Tower | Off-plan | 1 914 sqft | AED 3 356 500 | 1 753 |
| 8 Dec 2025 | 3 B/R Flat — API - Barsha Residential Tower | Off-plan | 1 914 sqft | AED 3 450 580 | 1 803 |
| 8 Dec 2025 | 2 B/R Flat — API - Barsha Residential Tower | Off-plan | 1 361 sqft | AED 2 709 700 | 1 991 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Api- Barsha Residential Tower: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 6 | AED 3.02M | 1 887 | AED 18.22M |
| 2025 | 80 | AED 2.87M | 1 734 | AED 232.95M |
| 2017 | 1 | — | — | AED 74.60M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Dec 2025 | 7 | AED 3.45M | 1 753 | 1 636 – 1 790 |
| Nov 2025 | 0 | — | — | — |
| Oct 2025 | 10 | AED 2.64M | 1 879 | 1 829 – 1 986 |
| Sep 2025 | 10 | AED 2.87M | 1 816 | 1 654 – 1 878 |
| Aug 2025 | 14 | AED 2.77M | 1 732 | 1 563 – 1 929 |
| Jul 2025 | 5 | AED 3.19M | 1 701 | 1 459 – 1 712 |
| Jun 2025 | 5 | AED 2.86M | 1 723 | 1 556 – 1 726 |
| May 2025 | 26 | AED 2.65M | 1 708 | 1 594 – 1 794 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 13 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
Questions about Api- Barsha Residential Tower
Who is the developer of Api- Barsha Residential Tower?
The Dubai Land Department project registry lists Dubai General Properties L.L.C as the developer of Api- Barsha Residential Tower.
Is Api- Barsha Residential Tower completed?
The DLD registry status of Api- Barsha Residential Tower is Active, 93% complete at the last DLD inspection. The declared completion date in the registry is 31 Oct 2025 — a registry date, not a handover promise.
How many homes are in Api- Barsha Residential Tower?
The DLD registry records 335 units in Api- Barsha Residential Tower. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Api- Barsha Residential Tower?
Over the last 12 complete months the median registered sale in Api- Barsha Residential Tower was AED 3.36M, or AED 1 778 per sqft, from 13 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Api- Barsha Residential Tower?
The escrow agent recorded by DLD for Api- Barsha Residential Tower is Emirates Nbd Bank (P.J.S.C).
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Cite or reuse this data
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Api- Barsha Residential Tower — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/api-barsha-residential-tower/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Api- Barsha Residential Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.