Data Dubai

Arabian Tower

Arabian TowerCancelled14% builtDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Arabian Tower: ChatGPT · Claude · Perplexity

Arabian Tower is a project by Aa Global Limited, recorded at 14% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAa Global Limited
StatusCancelled
Construction progress14% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started1 Apr 2009
Declared completion30 May 2021 — registry date, not a handover promise
Units in the project0
Escrow agentEmirates Islamic Bank P.J.S.C.
Project number736

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 7 technical inspections for this project, from 11 Jul 2012 at 6.8% to 15 Apr 2019 at 14.1%. The recorded percentage is the same as at the inspection on 17 Apr 2018: no inspection since then changed it. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2021-05-302012-07-112019-04-15

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
15 Apr 201914.1% +0.0 pp
17 Apr 201814.1% +0.1 pp
21 Aug 201714.0% +0.4 pp
26 Mar 201713.6% +0.5 pp
5 Nov 201513.1% +0.3 pp
8 Jan 201512.8% +6.0 pp
11 Jul 20126.8% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Arabian Tower. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Alcove
Finished · Grovy Real Estate Development L.L.C
131 m100%87
Dezire Residences
Finished · Bluechip Real Estate Development L.L.C
166 m100%120
Empire Residence
Finished · Peace Homes Signatures Development L.L.C
204 m100%151
Judi Palace (A+B)
Cancelled · New World Invest Ltd
239 m52%—
Lolena
Finished · Al Masarat Real Estate Development (Llc)
251 m100%97
Serena Resedence
Cancelled · Ici Investment Limited
345 m45%—
Milano Giovanni Boutique Suites
Finished · Arthur And Hard Man Real Estate Development L.L.C
359 m100%127
Roxana Residence
Finished · Rose Homes Investment (L.L.C)
376 m100%255
Diamond View 1,2,3,4
Finished · Diamond Developers Co.Limited
410 m100%25
Westar Casablanca
Finished · Westar Properties Limited
417 m100%13

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

Questions about Arabian Tower

Who is the developer of Arabian Tower?

The Dubai Land Department project registry lists Aa Global Limited as the developer of Arabian Tower.

Is Arabian Tower completed?

The DLD registry status of Arabian Tower is Cancelled, 14% complete at the last DLD inspection. The declared completion date in the registry is 30 May 2021 — a registry date, not a handover promise.

Who holds the escrow account for Arabian Tower?

The escrow agent recorded by DLD for Arabian Tower is Emirates Islamic Bank P.J.S.C..

Where is Arabian Tower?

Arabian Tower is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is Alcove, about 131 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Arabian Tower — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/arabian-tower/”. Reuse is permitted with attribution.