Data Dubai

Judi Palace (A+B)

Judi Palace (A+B)Cancelled52% builtDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Judi Palace (A+B): ChatGPT · Claude · Perplexity

Judi Palace (A+B) is a project by New World Invest Ltd, recorded at 52% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperNew World Invest Ltd
StatusCancelled
Construction progress52% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started1 Nov 2009
Declared completion24 Jun 2016 — registry date, not a handover promise
Units in the project0
Escrow agentMashreq Bank Psc
Project number578

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 7 technical inspections for this project, from 27 Aug 2012 at 28.8% to 28 Nov 2016 at 52.3%. Over the inspections since 17 Sep 2015 it moved 0.66 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2016-06-242012-08-272016-11-28

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
28 Nov 201652.3% +4.2 pp
17 Jan 201648.1% +5.3 pp
17 Sep 201542.7% +7.2 pp
7 May 201535.5% +7.8 pp
14 Dec 201427.8% +3.3 pp
20 May 201324.5% -4.2 pp
27 Aug 201228.8% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Judi Palace (A+B). Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Empire Residence
Finished · Peace Homes Signatures Development L.L.C
86 m100%151
Dezire Residences
Finished · Bluechip Real Estate Development L.L.C
95 m100%120
Milano Giovanni Boutique Suites
Finished · Arthur And Hard Man Real Estate Development L.L.C
178 m100%127
Diamond View 1,2,3,4
Finished · Diamond Developers Co.Limited
207 m100%25
Indigo Ville 1
Finished · Venus Properties Investment Ltd
207 m100%15
Diamond Views 3 - Villas A
Finished · Diamond Developers Co.Limited
238 m100%13
Arabian Tower
Cancelled · Aa Global Limited
239 m14%—
Diamond Views 2
Finished · Diamond Developers Co.Limited
251 m100%191
Diamond Views 3
Finished · Diamond Developers Co.Limited
252 m100%262
Diamond Views 3 - Villas B
Finished · Diamond Developers Co.Limited
272 m100%19

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

Questions about Judi Palace (A+B)

Who is the developer of Judi Palace (A+B)?

The Dubai Land Department project registry lists New World Invest Ltd as the developer of Judi Palace (A+B).

Is Judi Palace (A+B) completed?

The DLD registry status of Judi Palace (A+B) is Cancelled, 52% complete at the last DLD inspection. The declared completion date in the registry is 24 Jun 2016 — a registry date, not a handover promise.

Who holds the escrow account for Judi Palace (A+B)?

The escrow agent recorded by DLD for Judi Palace (A+B) is Mashreq Bank Psc.

Where is Judi Palace (A+B)?

Judi Palace (A+B) is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is Empire Residence, about 86 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Judi Palace (A+B) — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/judi-palace-a-b/”. Reuse is permitted with attribution.