City Walk Crestlane 1
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
City Walk Crestlane 1 is a project by Citywalk Residential 1 L.L.C, recorded at 0% complete at its last Dubai Land Department inspection. 85 sales registered in the trailing 12 months at a median AED 3.42M (3 278 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 85 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Citywalk Residential 1 L.L.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 0% — at the last DLD inspection | DLD verified |
| Registered with DLD | 12 Jun 2025 | DLD verified |
| Construction started | 8 Sep 2025 | DLD verified |
| Declared completion | 30 Sep 2029 — registry date, not a handover promise | DLD verified |
| Units in the project | 202 | DLD verified |
| Project area | 26 271 sqm | DLD verified |
| Escrow agent | National Bank Of Ras Al- Khaimah (P.S.C) | DLD verified |
| Project number | 3801 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Oct 2025: in the 11 months since, no month reached the five registered sales a median needs (4 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 4 technical inspections for this project, from 3 Jun 2025 at 0.0% to 3 Aug 2026 at 0.2%. Since 3 Jun 2025 the recorded percentage has moved 0.01 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 3 Aug 2026 | 0.2% | +0.2 pp |
| 24 Apr 2026 | 0.0% | +0.0 pp |
| 31 Dec 2025 | 0.0% | +0.0 pp |
| 3 Jun 2025 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Oct 2025 | 76 | AED 3.07M | 3 270 | 3 212 – 3 359 |
| Sep 2025 | 40 | AED 2.85M | 3 246 | 3 104 – 3 296 |
| Aug 2025 | 46 | AED 2.78M | 3 290 | 3 223 – 3 411 |
| Jul 2025 | 25 | AED 3.58M | 3 320 | 3 262 – 3 368 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments | 38 | AED 2.67M | 3 278 | 822 sqft | — | — |
| 2-bedroom apartments | 30 | AED 3.73M | 3 163 | 1 261 sqft | — | — |
| 3-bedroom apartments low sample (11) | 11 | AED 6.76M | 3 533 | 2 109 sqft | — | — |
| 4-bedroom apartments low sample (5) | 5 | — | 3 791 | 4 401 sqft | — | — |
| 5-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 3 | — | — | AED 11.04M |
| 2025 | 195 | AED 2.84M | 3 278 | AED 706.23M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 25 Aug 2026 | 4 B/R Flat — City Walk Crestlane 1 | Off-plan | 4 397 sqft | AED 16 686 000 | 3 795 |
| 7 Aug 2026 | 2 B/R Flat — City Walk Crestlane 1 | Off-plan | 1 169 sqft | AED 3 724 000 | 3 187 |
| 11 Feb 2026 | 3 B/R Flat — City Walk Crestlane 1 | Off-plan | 2 121 sqft | AED 7 320 000 | 3 451 |
| 24 Nov 2025 | 4 B/R Flat — City Walk Crestlane 1 | Off-plan | 4 394 sqft | AED 16 674 000 | 3 794 |
| 30 Oct 2025 | 2 B/R Flat — City Walk Crestlane 1 | Off-plan | 1 169 sqft | AED 3 684 000 | 3 151 |
| 29 Oct 2025 | 3 B/R Flat — City Walk Crestlane 1 | Off-plan | 2 109 sqft | AED 7 493 000 | 3 553 |
| 29 Oct 2025 | 2 B/R Flat — City Walk Crestlane 1 | Off-plan | 1 265 sqft | AED 3 965 000 | 3 135 |
| 29 Oct 2025 | 1 B/R Flat — City Walk Crestlane 1 | Off-plan | 830 sqft | AED 2 843 000 | 3 426 |
| 29 Oct 2025 | 3 B/R Flat — City Walk Crestlane 1 | Off-plan | 4 209 sqft | AED 11 754 000 | 2 793 |
| 29 Oct 2025 | 2 B/R Flat — City Walk Crestlane 1 | Off-plan | 1 355 sqft | AED 4 519 000 | 3 336 |
| 28 Oct 2025 | 1 B/R Flat — City Walk Crestlane 1 | Off-plan | 794 sqft | AED 2 669 000 | 3 359 |
| 28 Oct 2025 | 3 B/R Flat — City Walk Crestlane 1 | Off-plan | 2 966 sqft | AED 10 853 000 | 3 659 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in City Walk
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “City Walk Crestlane 1 — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/city-walk-crestlane-1/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for City Walk Crestlane 1. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.