Data Dubai

Classic Soccer Tower

Classic Soccer TowerCancelled27% builtDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Classic Soccer Tower: ChatGPT · Claude · Perplexity

Classic Soccer Tower is a project by New World Invest Ltd, recorded at 27% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperNew World Invest Ltd
StatusCancelled
Construction progress27% — at the last DLD inspection
Registered with DLD20 Aug 2014
Construction started1 Jun 2008
Declared completion11 Sep 2017 — registry date, not a handover promise
Units in the project0
Escrow agentMashreq Bank Psc
Project number860

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 9 technical inspections for this project, from 27 Sep 2012 at 0.8% to 5 Jan 2017 at 27.1%. Since 27 Aug 2015 the recorded percentage has moved 0.11 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2017-09-112012-09-272017-01-05

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
5 Jan 201727.1% -0.9 pp
21 Jan 201628.1% +2.7 pp
27 Aug 201525.4% +7.1 pp
5 Feb 201518.3% +8.2 pp
31 Aug 201410.1% +5.8 pp
21 May 20144.2% +1.5 pp
28 Nov 20132.7% +0.1 pp
12 Feb 20132.6% +1.9 pp
27 Sep 20120.8% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Classic Soccer Tower. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Global Golf Residence 2
Finished · Empire Arabia Real Estate Developers L.L.C
70 m100%342
Amal Tower
Finished · Consolidated Urban Real Estate Development Co. L.L.C
70 m100%346
The Medalist
Finished · Gold Vision Development Limited
93 m100%154
The Spirit
Finished · First Homes Limited
131 m100%386
Oasis Tower 2
Active · P A L Developments L.L.C
139 m74%444
Champions Tower 4
Cancelled · Memon Investments L.L.C
178 m52%—
Elite 4 Sports Residence
Finished · Triplanet International (Fzc)
179 m100%251
Elite 6 Sports Residence
Finished · Triplanet International (Fzc)
245 m100%366
Lime Light Twin Towers
Active · Lime Light Real Estate Development L.L.C
259 m71%734
Oasis Tower One
Finished · Brighton Holdings Limited
276 m100%221

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

Questions about Classic Soccer Tower

Who is the developer of Classic Soccer Tower?

The Dubai Land Department project registry lists New World Invest Ltd as the developer of Classic Soccer Tower.

Is Classic Soccer Tower completed?

The DLD registry status of Classic Soccer Tower is Cancelled, 27% complete at the last DLD inspection. The declared completion date in the registry is 11 Sep 2017 — a registry date, not a handover promise.

Who holds the escrow account for Classic Soccer Tower?

The escrow agent recorded by DLD for Classic Soccer Tower is Mashreq Bank Psc.

Where is Classic Soccer Tower?

Classic Soccer Tower is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is Global Golf Residence 2, about 70 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Classic Soccer Tower — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/classic-soccer-tower/”. Reuse is permitted with attribution.