DubaiData

Amal Tower

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Amal Tower is a project by Consolidated Urban Real Estate Development Co. L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 66 sales registered in the trailing 12 months at a median AED 800k (1 000 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 800k -5.9%
IQR AED 495k – AED 1.00M
DLD verified
Median price per sqft
AED 1 000/sqft -3.1%
IQR 931 – 1 132 AED/sqft
DLD verified
Registered sales
66 -34.0%
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 66 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperConsolidated Urban Real Estate Development Co. L.L.C DLD verified
StatusFinished DLD verified
Construction progress100% — at the last DLD inspection DLD verified
Registered with DLD12 Jul 2015 DLD verified
Construction started30 Aug 2015 DLD verified
Declared completion7 Jan 2025 — registry date, not a handover promise DLD verified
Units in the project358 DLD verified
Project area30 199 sqm DLD verified
Escrow agentDubai Islamic Bank (Public Joint Stock Company) DLD verified
Project number591 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

5007501 0001 250Nov 2023Mar 2024Jul 2024Nov 2024Mar 2025Jul 2025Nov 2025Mar 2026Jul 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 2 months since, no month reached the five registered sales a median needs (7 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 18 technical inspections for this project, from 16 Sep 2015 at 3.5% to 7 Jan 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2025-01-072015-09-162025-01-07

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
7 Jan 2025100.0% +2.0 pp
18 Oct 202498.0% +8.0 pp
12 Jun 202490.0% +18.0 pp
21 Feb 202472.0% +13.8 pp
9 Nov 202358.3% +4.1 pp
25 Jul 202354.2% +17.1 pp
27 Feb 202337.0% +5.7 pp
12 Sep 202231.4% +3.1 pp
10 May 202228.3% +2.6 pp
2 Nov 202125.7% +3.7 pp
22 Sep 202022.1% +1.7 pp
5 Mar 202020.4% +0.3 pp
2 May 201920.0% +5.9 pp
11 Dec 201814.2% +6.7 pp
10 Oct 20187.4% +1.4 pp
8 Apr 20186.0% +2.2 pp
14 Feb 20173.8% +0.3 pp
16 Sep 20153.5% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jul 202610 AED 608k1 067 1 001 – 1 242
Jun 20265 AED 860k1 054 1 031 – 1 133
May 20263 —— —
Apr 20261 —— —
Mar 20261 —— —
Feb 20264 —998 960 – 1 000
Jan 20261 —— —
Dec 20258 AED 540k788 450 – 1 150
Nov 202513 AED 439k451 450 – 1 171
Oct 20258 AED 1.07M992 938 – 1 038
Sep 20252 —— —
Aug 202517 AED 853k1 002 804 – 1 004
Jul 20258 AED 934k1 152 1 040 – 1 203

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios low sample (19) 19AED 532k 1 102 399 sqft — —
1-bedroom apartments 28AED 824k 1 000 807 sqft — —
2-bedroom apartments low sample (19) 19AED 1.25M 998 1 261 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

0501002010201620222023202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202637AED 848k 1 031AED 28.27M
2025105AED 846k 1 023AED 77.06M
202483AED 896k 963AED 68.70M
202351AED 704k 874AED 27.25M
20229— 672AED 1.65M
20161— —AED 28.09M
201037AED 638k 854AED 26.05M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
21 Sep 20261 B/R Flat — AMAL TOWERReady 746 sqftAED 810 000 1 086
18 Sep 20261 B/R Flat — AMAL TOWERReady 1 063 sqftAED 1 000 000 941
16 Sep 2026Studio Flat — AMAL TOWERReady 463 sqftAED 510 000 1 102
11 Sep 2026Studio Flat — AMAL TOWERReady 466 sqftAED 595 000 1 278
27 Aug 2026Studio Flat — AMAL TOWERReady 463 sqftAED 515 000 1 112
26 Aug 20262 B/R Flat — AMAL TOWERReady 1 261 sqftAED 1 100 000 873
24 Aug 20261 B/R Flat — AMAL TOWERReady 750 sqftAED 847 000 1 129
30 Jul 20262 B/R Flat — AMAL TOWERReady 1 261 sqftAED 1 400 000 1 111
23 Jul 2026Studio Flat — AMAL TOWERReady 463 sqftAED 470 000 1 015
21 Jul 20261 B/R Flat — AMAL TOWERReady 746 sqftAED 620 000 831
20 Jul 20261 B/R Flat — AMAL TOWERReady 750 sqftAED 800 000 1 066
20 Jul 2026Studio Flat — AMAL TOWERReady 464 sqftAED 495 000 1 067

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai Sports City

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Amal Tower — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/amal-tower/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Amal Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.