Design Quarter
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Design Quarter: ChatGPT · Claude · Perplexity
Design Quarter is a project by Dhre 2 Bts L.L.C, recorded at 41% complete at its last Dubai Land Department inspection. 19 sales registered in the trailing 12 months at a median AED 3.09M (2 552 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 19 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Dhre 2 Bts L.L.C |
| Status | Active |
| Construction progress | 41% — at the last DLD inspection |
| Registered with DLD | 16 Mar 2023 |
| Construction started | 25 May 2023 |
| Declared completion | 25 Feb 2027 — registry date, not a handover promise |
| Units in the project | 564 |
| Project area | 174 529 sqm |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) |
| Project number | 2607 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Apr 2025: in the 18 months since, no month reached the five registered sales a median needs (25 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 10 technical inspections for this project, from 8 Mar 2023 at 0.9% to 28 Sep 2026 at 40.8%. Over the inspections since 2 May 2025 it moved 1.91 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 28 Sep 2026 | 40.8% | +9.8 pp |
| 30 Jun 2026 | 31.0% | +4.9 pp |
| 26 Mar 2026 | 26.1% | -0.2 pp |
| 26 Mar 2026 | 26.3% | +9.4 pp |
| 7 Nov 2025 | 16.9% | +3.3 pp |
| 30 Jul 2025 | 13.6% | +5.1 pp |
| 2 May 2025 | 8.5% | +3.7 pp |
| 7 Feb 2025 | 4.8% | +1.7 pp |
| 3 Jun 2024 | 3.1% | +2.2 pp |
| 8 Mar 2023 | 0.9% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
Off-plan sale registrations in Design Quarter (569) already equal 100% of the 558 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.
| Homes | In unit register | Registered sales |
|---|---|---|
| 1 bedroom | 262 | 282 |
| 2 bedrooms | 208 | 223 |
| 3 bedrooms | 88 | 64 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (8) | 8 | AED 1.99M | 2 411 | 823 sqft | — | — |
| 2-bedroom apartments low sample (7) | 7 | AED 3.18M | 2 653 | 1 185 sqft | — | — |
| 3-bedroom apartments insufficient data | 4 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 6 Nov 2026 | 2 B/R Flat — Tower A | Off-plan | 1 265 sqft | AED 2 690 000 | 2 127 |
| 5 Nov 2026 | 2 B/R Flat — Tower A | Off-plan | 1 258 sqft | AED 3 210 000 | 2 552 |
| 2 Nov 2026 | 1 B/R Flat — Tower B | Off-plan | 822 sqft | AED 2 381 000 | 2 897 |
| 15 Oct 2026 | 1 B/R Flat — Tower A | Off-plan | 823 sqft | AED 2 000 000 | 2 430 |
| 13 Oct 2026 | 2 B/R Flat — Tower B | Off-plan | 1 168 sqft | AED 3 289 000 | 2 817 |
| 24 Sep 2026 | 2 B/R Flat — Tower A | Off-plan | 1 258 sqft | AED 2 700 000 | 2 147 |
| 23 Sep 2026 | 3 B/R Flat — Tower C | Off-plan | 2 951 sqft | AED 5 350 000 | 1 813 |
| 4 Aug 2026 | 3 B/R Flat — Tower B | Off-plan | 3 132 sqft | AED 8 724 000 | 2 786 |
| 4 Aug 2026 | 1 B/R Flat — Tower A | Off-plan | 843 sqft | AED 1 985 000 | 2 354 |
| 29 Jul 2026 | 2 B/R Flat — Tower A | Off-plan | 1 185 sqft | AED 3 180 150 | 2 684 |
| 1 Jul 2026 | 1 B/R Flat — Tower C | Off-plan | 859 sqft | AED 2 023 000 | 2 355 |
| 14 May 2026 | 3 B/R Flat — Tower B | Off-plan | 2 019 sqft | AED 6 672 000 | 3 305 |
| 31 Mar 2026 | 3 B/R Flat — Tower B | Off-plan | 3 305 sqft | AED 8 537 000 | 2 583 |
| 16 Mar 2026 | 1 B/R Flat — Tower A | Off-plan | 823 sqft | AED 1 840 000 | 2 237 |
| 12 Feb 2026 | 2 B/R Flat — Tower B | Off-plan | 1 168 sqft | AED 3 098 000 | 2 653 |
| 2 Feb 2026 | 1 B/R Flat — Tower A | Off-plan | 843 sqft | AED 2 145 000 | 2 543 |
| 27 Jan 2026 | 2 B/R Flat — Tower A | Off-plan | 1 185 sqft | AED 3 090 000 | 2 608 |
| 29 Dec 2025 | 1 B/R Flat — Tower C | Off-plan | 799 sqft | AED 1 923 000 | 2 407 |
| 29 Dec 2025 | 1 B/R Flat — Tower C | Off-plan | 797 sqft | AED 1 925 000 | 2 415 |
| 11 Dec 2025 | 2 B/R Flat — Tower A | Off-plan | 1 258 sqft | AED 3 310 000 | 2 632 |
| 24 Nov 2025 | 2 B/R Flat — Tower B | Off-plan | 1 185 sqft | AED 3 401 000 | 2 871 |
| 11 Nov 2025 | 1 B/R Flat — Tower A | Off-plan | 823 sqft | AED 2 100 000 | 2 552 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Design Quarter: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, May 2025 – Apr 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 14 | AED 3.09M | 2 563 | AED 54.63M |
| 2025 | 24 | AED 3.08M | 2 639 | AED 84.37M |
| 2024 | 66 | AED 3.40M | 2 769 | AED 233.10M |
| 2023 | 462 | AED 2.36M | 2 665 | AED 1.26B |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Apr 2025 | 8 | AED 3.15M | 2 639 | 2 538 – 2 724 |
| Mar 2025 | 3 | — | — | — |
| Feb 2025 | 2 | — | — | — |
| Jan 2025 | 0 | — | — | — |
| Dec 2024 | 4 | — | — | — |
| Nov 2024 | 1 | — | — | — |
| Oct 2024 | 1 | — | — | — |
| Sep 2024 | 7 | AED 2.69M | 2 138 | 2 117 – 2 295 |
| Aug 2024 | 5 | AED 3.44M | 2 862 | 2 853 – 2 905 |
| Jul 2024 | 5 | AED 2.90M | 2 696 | 2 448 – 2 720 |
| Jun 2024 | 1 | — | — | — |
| May 2024 | 9 | AED 3.14M | 2 780 | 2 662 – 2 827 |
| Apr 2024 | 5 | AED 4.35M | 2 812 | 2 748 – 2 845 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| Design Quarter - Tower A low sample (9) | 9 | AED 2.15M | 2 543 | 100.0% |
| Design Quarter - Tower B low sample (6) | 6 | AED 5.04M | 2 801 | 100.0% |
| Design Quarter - Tower C insufficient data | 4 | — | — | 100.0% |
| Design Quarter - Office Building A1 insufficient data | 0 | — | — | — |
| Design Quarter - Office Building A3 insufficient data | 0 | — | — | — |
| Design Quarter - Office Building B3 insufficient data | 0 | — | — | — |
| Design Quarter - Office Building A2 insufficient data | 0 | — | — | — |
| Design Quarter - Office Building B1 insufficient data | 0 | — | — | — |
| Design Quarter - Office Building B2 insufficient data | 0 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 19 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Business Park
Questions about Design Quarter
Who is the developer of Design Quarter?
The Dubai Land Department project registry lists Dhre 2 Bts L.L.C as the developer of Design Quarter.
Is Design Quarter completed?
The DLD registry status of Design Quarter is Active, 41% complete at the last DLD inspection. The declared completion date in the registry is 25 Feb 2027 — a registry date, not a handover promise.
How many homes are in Design Quarter?
The DLD registry records 564 units in Design Quarter. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Design Quarter?
Over the last 12 complete months the median registered sale in Design Quarter was AED 3.09M, or AED 2 552 per sqft, from 19 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Design Quarter?
The escrow agent recorded by DLD for Design Quarter is Emirates Nbd Bank (P.J.S.C).
Where is Design Quarter?
Design Quarter is in the Business Park community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Design Quarter. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.