Jumeirah Residences Emirates Towers
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Jumeirah Residences Emirates Towers is a project by Dhre 2 Bts L.L.C, recorded at 4% complete at its last Dubai Land Department inspection. 267 sales registered in the trailing 12 months at a median AED 6.16M (4 589 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 267 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Dhre 2 Bts L.L.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 4% — at the last DLD inspection | DLD verified |
| Registered with DLD | 7 Jul 2025 | DLD verified |
| Construction started | 1 Sep 2025 | DLD verified |
| Declared completion | 1 Sep 2030 — registry date, not a handover promise | DLD verified |
| Units in the project | 754 | DLD verified |
| Project area | 93 281 sqm | DLD verified |
| Escrow agent | Mashreq Bank Psc | DLD verified |
| Project number | 3820 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Dec 2025: in the 9 months since, no month reached the five registered sales a median needs (3 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 4 technical inspections for this project, from 2 Jul 2025 at 0.0% to 28 Sep 2026 at 4.2%. Since 2 Jul 2025 the recorded percentage has moved 0.28 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 28 Sep 2026 | 4.2% | +2.9 pp |
| 22 Jun 2026 | 1.3% | +1.3 pp |
| 23 Mar 2026 | 0.0% | +0.0 pp |
| 2 Jul 2025 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Dec 2025 | 13 | AED 6.20M | 4 823 | 4 668 – 4 911 |
| Nov 2025 | 29 | AED 6.38M | 4 767 | 4 700 – 4 877 |
| Oct 2025 | 168 | AED 5.82M | 4 567 | 4 436 – 4 759 |
| Sep 2025 | 245 | AED 5.79M | 4 600 | 4 500 – 4 733 |
| Aug 2025 | 212 | AED 5.09M | 4 633 | 4 451 – 4 769 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments | 69 | AED 4.10M | 4 573 | 880 sqft | — | — |
| 2-bedroom apartments | 141 | AED 6.67M | 4 616 | 1 373 sqft | — | — |
| 3-bedroom apartments | 55 | AED 10.55M | — | 1 930 sqft | — | — |
| 4-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 40 | AED 6.46M | — | AED 149.48M |
| 2025 | 709 | AED 5.73M | 4 605 | AED 3.91B |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 17 Aug 2026 | 3 B/R Flat — Jumeirah Residences Emirates Towers | Off-plan | 1 926 sqft | AED 10 811 000 | 5 614 |
| 17 Jul 2026 | 1 B/R Flat — Jumeirah Residences Emirates Towers | Off-plan | 890 sqft | AED 4 078 000 | 4 583 |
| 27 Apr 2026 | 3 B/R Flat — Jumeirah Residences Emirates Towers | Off-plan | 2 564 sqft | AED 20 804 000 | 8 114 |
| 7 Apr 2026 | 3 B/R Flat — Jumeirah Residences Emirates Towers | Off-plan | 1 930 sqft | AED 10 833 000 | 5 612 |
| 31 Mar 2026 | 3 B/R Flat — Jumeirah Residences Emirates Towers | Off-plan | 1 930 sqft | AED 10 788 000 | 5 589 |
| 6 Mar 2026 | 2 B/R Flat — Jumeirah Residences Emirates Towers | Off-plan | 1 532 sqft | AED 6 777 000 | 4 425 |
| 5 Mar 2026 | 3 B/R Flat — Jumeirah Residences Emirates Towers | Off-plan | 1 926 sqft | AED 10 785 000 | 5 600 |
| 4 Mar 2026 | 1 B/R Flat — Jumeirah Residences Emirates Towers | Off-plan | 890 sqft | AED 4 500 000 | 5 058 |
| 23 Feb 2026 | 3 B/R Flat — Jumeirah Residences Emirates Towers | Off-plan | 1 926 sqft | AED 10 650 000 | 5 529 |
| 19 Feb 2026 | 3 B/R Flat — Jumeirah Residences Emirates Towers | Off-plan | 1 930 sqft | AED 10 743 000 | 5 566 |
| 5 Feb 2026 | 3 B/R Flat — Jumeirah Residences Emirates Towers | Off-plan | 1 930 sqft | AED 10 787 000 | 5 589 |
| 5 Feb 2026 | 2 B/R Flat — Jumeirah Residences Emirates Towers | Off-plan | 1 165 sqft | AED 6 647 000 | 5 706 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects by Dhre 2 Bts L.L.C
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Jumeirah Residences Emirates Towers — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/jumeirah-residences-emirates-towers/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Jumeirah Residences Emirates Towers. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.