Data Dubai

Electra

ElectraActive9% built281 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Electra: ChatGPT · Claude · Perplexity

Electra is a project by Acube Real Estate Development L L C, recorded at 9% complete at its last Dubai Land Department inspection. 32 sales registered in the trailing 12 months at a median AED 823k (1 585 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 823k -32.7% y/y
≈ US$ 224k · typical range AED 749k – AED 1.35M
DLD verified
Median price per sqft
AED 1 585/sqft +3.0% y/y
typical range 1 384 – 1 607 AED/sqft
DLD verified
Registered sales
32 -59.5% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 32 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAcube Real Estate Development L L C
StatusActive
Construction progress9% — at the last DLD inspection
Registered with DLD20 May 2024
Construction started30 Apr 2024
Units in the project281
Project area21 746 sqm
Escrow agentDubai Islamic Bank (Public Joint Stock Company)
Project number2881

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 4001 6001 800Jul 2024Oct 2024Jan 2025Apr 2025Jul 2025Oct 2025Jan 2026Apr 2026Jul 2026Oct 20261 4001 6001 800Jul 2024Apr 2025Jan 2026Oct 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 8 technical inspections for this project, from 4 Apr 2024 at 0.0% to 19 Oct 2026 at 9.2%. Since 17 Jul 2025 the recorded percentage has moved 0.24 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%2024-04-042026-10-19

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
19 Oct 20269.2% +1.4 pp
6 Jul 20267.9% +0.3 pp
21 May 20267.6% +0.9 pp
16 Mar 20266.7% +1.1 pp
17 Jul 20255.6% +0.7 pp
2 Apr 20254.9% +4.6 pp
14 Nov 20240.3% +0.3 pp
4 Apr 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

The DLD unit register lists 278 homes in Electra, and 208 off-plan sale registrations have been recorded since July 2024, as of 23 Nov 2026. After 2.3 years of sales, resales make up a growing part of those registrations, so we do not turn them into an unsold count.

HomesIn unit
register
Registered
sales
Studios10688
1 bedroom11283
2 bedrooms5031
3 bedrooms106

Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios low sample (18) 18AED 749k 1 606 455 sqft — —
1-bedroom apartments low sample (6) 6AED 1.16M 1 292 895 sqft — —
2-bedroom apartments low sample (6) 6AED 1.87M 1 369 1 406 sqft — —
3-bedroom apartments insufficient data 2— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
23 Nov 20263 B/R FlatOff-plan 1 698 sqftAED 2 311 619 1 361
10 Nov 20262 B/R FlatOff-plan 1 098 sqftAED 1 351 673 1 231
30 Oct 20261 B/R FlatOff-plan 893 sqftAED 1 217 969 1 363
21 Oct 20262 B/R FlatOff-plan 1 715 sqftAED 2 309 300 1 347
21 Oct 2026Studio FlatOff-plan 518 sqftAED 822 389 1 588
21 Oct 2026Studio FlatOff-plan 518 sqftAED 820 136 1 583
21 Oct 2026Studio FlatOff-plan 455 sqftAED 748 140 1 644
21 Oct 2026Studio FlatOff-plan 518 sqftAED 821 939 1 587
21 Oct 2026Studio FlatOff-plan 452 sqftAED 724 971 1 605
21 Oct 2026Studio FlatOff-plan 445 sqftAED 731 326 1 644
21 Oct 2026Studio FlatOff-plan 518 sqftAED 823 291 1 589
15 Oct 2026Studio FlatOff-plan 452 sqftAED 726 150 1 608
15 Oct 2026Studio FlatOff-plan 452 sqftAED 725 364 1 606
8 Oct 2026Studio FlatOff-plan 452 sqftAED 725 757 1 607
8 Oct 20261 B/R FlatOff-plan 896 sqftAED 1 092 959 1 220
25 Sep 2026Studio FlatOff-plan 518 sqftAED 822 840 1 589
14 Sep 20262 B/R FlatOff-plan 1 715 sqftAED 2 063 161 1 203
1 Sep 20261 B/R FlatOff-plan 893 sqftAED 1 089 104 1 219
7 Aug 2026Studio FlatOff-plan 455 sqftAED 749 328 1 647
7 Aug 2026Studio FlatOff-plan 518 sqftAED 821 488 1 586
3 Aug 20262 B/R FlatOff-plan 1 098 sqftAED 1 352 521 1 232
13 Jul 20261 B/R FlatOff-plan 896 sqftAED 1 092 254 1 219
13 Jul 2026Studio FlatOff-plan 518 sqftAED 736 654 1 422
24 Apr 20263 B/R FlatOff-plan 1 698 sqftAED 2 313 029 1 362

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Electra: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0501002014202320242025202605010020142023202420252026

registered sales per calendar year; the current year is incomplete

By month

0510NovDecJanFebMarAprMayJunJulAugSepOct0510DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202628AED 822k 1 587AED 30.46M
202574AED 1.26M 1 538AED 93.37M
2024104AED 1.07M 1 556AED 118.06M
20231— —AED 34.95M
20141— —AED 29.83M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Oct 202613 AED 820k1 589 1 583 – 1 607
Sep 20263 —— —
Aug 20263 —— —
Jul 20262 —— —
Jun 20260 —— —
May 20260 —— —
Apr 20262 —— —
Mar 20263 —— —
Feb 20261 —— —
Jan 20261 —— —
Dec 20254 —— —
Nov 20250 —— —
Oct 20251 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Jumeirah Village Circle

Questions about Electra

Who is the developer of Electra?

The Dubai Land Department project registry lists Acube Real Estate Development L L C as the developer of Electra.

Is Electra completed?

The DLD registry status of Electra is Active, 9% complete at the last DLD inspection.

How many homes are in Electra?

The DLD registry records 281 units in Electra. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in Electra?

Over the last 12 complete months the median registered sale in Electra was AED 823k, or AED 1 585 per sqft, from 32 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Electra?

The escrow agent recorded by DLD for Electra is Dubai Islamic Bank (Public Joint Stock Company).

Where is Electra?

Electra is in the Jumeirah Village Circle community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Electra — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/electra/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Electra. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.