Equiti Gates
Updated 25 Nov 2026 · latest DLD registrations 25 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Equiti Gates: ChatGPT · Claude · Perplexity
Equiti Gates is a project by B N H Real Estate Developer, recorded at 100% complete at its last Dubai Land Department inspection. 13 sales registered in the trailing 12 months at a median AED 650k (1 498 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 25 Nov 2026 · sample 13 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | B N H Real Estate Developer |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 29 Nov 2023 |
| Construction started | 6 Oct 2022 |
| Units in the project | 284 |
| Project area | 16 242 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 2839 |
Source: DLD project registry (Mashrooi) · Data through 25 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 25 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Oct 2025: in the 12 months since, no month reached the five registered sales a median needs (13 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 6 Nov 2023 at 48.3% to 21 Oct 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 21 Oct 2025 | 100.0% | +2.9 pp |
| 10 Oct 2025 | 97.1% | +0.0 pp |
| 10 Oct 2025 | 97.1% | +6.9 pp |
| 8 Oct 2024 | 90.2% | +22.6 pp |
| 6 May 2024 | 67.5% | +19.2 pp |
| 6 Nov 2023 | 48.3% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 25 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (8) | 8 | AED 623k | 1 703 | 356 sqft | — | — |
| 1-bedroom apartments insufficient data | 4 | — | — | — | — | — |
| 3-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 25 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 25 Nov 2026 | 1 B/R Flat | Ready | 594 sqft | AED 769 852 | 1 297 |
| 25 Nov 2026 | Studio Flat | Ready | 436 sqft | AED 565 502 | 1 298 |
| 25 Nov 2026 | Studio Flat | Ready | 353 sqft | AED 457 524 | 1 297 |
| 25 Nov 2026 | Studio Flat | Ready | 346 sqft | AED 449 571 | 1 297 |
| 24 Nov 2026 | 1 B/R Flat | Ready | 593 sqft | AED 705 000 | 1 190 |
| 9 Nov 2026 | 1 B/R Flat | Ready | 593 sqft | AED 651 170 | 1 099 |
| 28 Sep 2026 | 3 B/R Flat | Ready | 1 255 sqft | AED 1 400 686 | 1 116 |
| 7 Sep 2026 | Studio Flat | Ready | 355 sqft | AED 651 278 | 1 832 |
| 30 Jul 2026 | 1 B/R Flat | Ready | 593 sqft | AED 650 000 | 1 097 |
| 12 Jun 2026 | Studio Flat | Ready | 357 sqft | AED 500 000 | 1 402 |
| 7 May 2026 | 1 B/R Flat | Ready | 700 sqft | AED 1 106 058 | 1 581 |
| 7 May 2026 | Studio Flat | Ready | 347 sqft | AED 684 108 | 1 971 |
| 7 Apr 2026 | 1 B/R Flat | Ready | 698 sqft | AED 1 045 034 | 1 498 |
| 9 Mar 2026 | Studio Flat | Ready | 357 sqft | AED 530 000 | 1 486 |
| 5 Mar 2026 | Studio Flat | Ready | 356 sqft | AED 580 000 | 1 627 |
| 21 Jan 2026 | Studio Flat | Off-plan | 437 sqft | AED 635 566 | 1 455 |
| 19 Dec 2025 | 1 B/R Flat | Ready | 570 sqft | AED 800 000 | 1 402 |
| 5 Nov 2025 | Studio Flat | Ready | 355 sqft | AED 635 256 | 1 788 |
| 3 Nov 2025 | Studio Flat | Ready | 344 sqft | AED 611 471 | 1 778 |
Source: Registered DLD transactions · Data through 25 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Equiti Gates: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 10 | AED 651k | 1 492 | AED 7.78M |
| 2025 | 109 | AED 850k | 1 460 | AED 92.28M |
| 2024 | 137 | AED 838k | 1 441 | AED 115.16M |
Source: Registered DLD transactions · Data through 25 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Oct 2025 | 6 | AED 660k | 1 697 | 1 569 – 1 740 |
| Sep 2025 | 4 | — | — | — |
| Aug 2025 | 17 | AED 838k | 1 482 | 1 342 – 1 626 |
| Jul 2025 | 29 | AED 885k | 1 486 | 1 419 – 1 722 |
| Jun 2025 | 2 | — | — | — |
| May 2025 | 14 | AED 762k | 1 659 | 1 401 – 1 713 |
| Apr 2025 | 14 | AED 838k | 1 453 | 1 368 – 1 526 |
| Mar 2025 | 3 | — | — | — |
| Feb 2025 | 1 | — | — | — |
| Jan 2025 | 16 | AED 838k | 1 369 | 1 305 – 1 419 |
| Dec 2024 | 18 | AED 632k | 1 614 | 1 418 – 1 696 |
| Nov 2024 | 9 | AED 922k | 1 615 | 1 519 – 1 639 |
| Oct 2024 | 4 | — | — | — |
Source: Registered DLD transactions · Data through 25 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 13 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Down Town Jabal Ali
Questions about Equiti Gates
Who is the developer of Equiti Gates?
The Dubai Land Department project registry lists B N H Real Estate Developer as the developer of Equiti Gates.
Is Equiti Gates completed?
The DLD registry status of Equiti Gates is Finished, 100% complete at the last DLD inspection.
How many homes are in Equiti Gates?
The DLD registry records 284 units in Equiti Gates.
What is the price per square foot in Equiti Gates?
Over the last 12 complete months the median registered sale in Equiti Gates was AED 650k, or AED 1 498 per sqft, from 13 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Equiti Gates?
The escrow agent recorded by DLD for Equiti Gates is Abu Dhabi Commercial Bank.
Where is Equiti Gates?
Equiti Gates is in the Down Town Jabal Ali community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 25 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 25 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗