Hills View At Wasl Gate
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Hills View At Wasl Gate is a project by Suncrest Hills Property L.L.C, recorded at 9% complete at its last Dubai Land Department inspection. 250 sales registered in the trailing 12 months at a median AED 711k (1 467 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 250 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Suncrest Hills Property L.L.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 9% — at the last DLD inspection | DLD verified |
| Registered with DLD | 20 May 2025 | DLD verified |
| Construction started | 30 Jun 2025 | DLD verified |
| Declared completion | 30 Jun 2028 — registry date, not a handover promise | DLD verified |
| Units in the project | 350 | DLD verified |
| Project area | 21 775 sqm | DLD verified |
| Escrow agent | The National Bank Of Fujairah P S C | DLD verified |
| Project number | 3627 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 2 months since, no month reached the five registered sales a median needs (5 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 3 technical inspections for this project, from 27 Mar 2025 at 0.0% to 24 Sep 2026 at 9.1%. Since 27 Mar 2025 the recorded percentage has moved 0.50 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 24 Sep 2026 | 9.1% | +5.2 pp |
| 1 Jun 2026 | 3.9% | +3.9 pp |
| 27 Mar 2025 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2026 | 5 | AED 805k | 1 512 | 1 435 – 1 611 |
| Jun 2026 | 9 | AED 1.08M | 1 435 | 1 424 – 1 550 |
| May 2026 | 16 | AED 1.09M | 1 409 | 1 398 – 1 512 |
| Apr 2026 | 4 | — | — | — |
| Mar 2026 | 1 | — | — | — |
| Feb 2026 | 51 | AED 1.08M | 1 425 | 1 393 – 1 553 |
| Jan 2026 | 35 | AED 1.08M | 1 418 | 1 408 – 1 529 |
| Dec 2025 | 49 | AED 700k | 1 500 | 1 415 – 1 581 |
| Nov 2025 | 54 | AED 682k | 1 550 | 1 405 – 1 593 |
| Oct 2025 | 21 | AED 675k | 1 569 | 1 485 – 1 600 |
| Sep 2025 | 5 | AED 674k | 1 541 | 1 398 – 1 583 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios | 133 | AED 675k | 1 570 | 424 sqft | — | — |
| 1-bedroom apartments | 106 | AED 1.09M | 1 401 | 778 sqft | — | — |
| 2-bedroom apartments low sample (11) | 11 | AED 1.62M | 1 366 | 1 183 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 126 | AED 1.08M | 1 425 | AED 121.89M |
| 2025 | 129 | AED 683k | 1 550 | AED 105.18M |
| 2023 | 1 | — | — | AED 37.83M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 28 Sep 2026 | Studio Flat — Hills View at Wasl Gate | Off-plan | 456 sqft | AED 652 000 | 1 430 |
| 28 Sep 2026 | 1 B/R Flat — Hills View at Wasl Gate | Off-plan | 774 sqft | AED 1 099 928 | 1 421 |
| 21 Sep 2026 | Studio Flat — Hills View at Wasl Gate | Off-plan | 422 sqft | AED 738 750 | 1 752 |
| 13 Aug 2026 | 1 B/R Flat — Hills View at Wasl Gate | Off-plan | 787 sqft | AED 1 057 355 | 1 343 |
| 12 Aug 2026 | 1 B/R Flat — Hills View at Wasl Gate | Off-plan | 778 sqft | AED 1 044 411 | 1 343 |
| 31 Jul 2026 | 1 B/R Flat — Hills View at Wasl Gate | Off-plan | 778 sqft | AED 1 091 030 | 1 402 |
| 27 Jul 2026 | Studio Flat — Hills View at Wasl Gate | Off-plan | 424 sqft | AED 805 000 | 1 900 |
| 27 Jul 2026 | 1 B/R Flat — Hills View at Wasl Gate | Off-plan | 755 sqft | AED 1 083 396 | 1 435 |
| 27 Jul 2026 | Studio Flat — Hills View at Wasl Gate | Off-plan | 422 sqft | AED 680 678 | 1 611 |
| 6 Jul 2026 | Studio Flat — Hills View at Wasl Gate | Off-plan | 450 sqft | AED 680 000 | 1 512 |
| 26 Jun 2026 | Studio Flat — Hills View at Wasl Gate | Off-plan | 424 sqft | AED 663 026 | 1 563 |
| 25 Jun 2026 | Studio Flat — Hills View at Wasl Gate | Off-plan | 474 sqft | AED 711 060 | 1 500 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Wasl Gate
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Hills View At Wasl Gate — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/hills-view-at-wasl-gate/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Hills View At Wasl Gate. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.