Metro Tower

Metro TowerCancelled6% builtDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Metro Tower: ChatGPT · Claude · Perplexity

Metro Tower is a project by Ilyas & Mustafa Galadari Management Investment & Development(L.L.C), recorded at 6% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperIlyas & Mustafa Galadari Management Investment & Development(L.L.C)
StatusCancelled
Construction progress6% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started9 Feb 2009
Declared completion1 Dec 2015 — registry date, not a handover promise
Units in the project0
Escrow agentArab Bank For Investment & Foreign Trade Almasref P.J.S.C.
Project number967

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 11 Dec 2012 at 6.1% to 13 Oct 2015 at 6.1%. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2015-12-012012-12-112015-10-13

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
13 Oct 20156.1% +0.0 pp
15 May 20136.1% +0.0 pp
11 Dec 20126.1% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Metro Tower. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
I & M Tower
Cancelled · Ilyas & Mustafa Galadari Management Investment & Development(L.L.C)
0 m7%—
Mag 330
Finished · Mag Property Development L.L.C
264 m100%654
Wadi Walk
Cancelled · Ilyas & Mustafa Galadari Management Investment & Development(L.L.C)
408 m10%1
Avenue 353
Under Cancellation · Ilyas & Mustafa Galadari Real Estate Co (L.L.C)
509 m24%79
Arabian Crowne
Cancelled · M E Development L.L.C
606 m12%1
G-Tower
Cancelled · Galadari Investment Office Limited Real Estate Llc
617 m10%—
55 Time Dubai
Cancelled · Dubai Property Ring Ltd
697 m1%—
Octagon Tower
Cancelled · Ilyas & Mustafa Galadari Management Investment & Development(L.L.C)
820 m0%1
Madison Residence
Finished · Damac Development(L L C)
828 m100%1
Wadi Tower
Finished · Sky One Real Estate L.L.C
1,049 m100%202

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

Questions about Metro Tower

Who is the developer of Metro Tower?

The Dubai Land Department project registry lists Ilyas & Mustafa Galadari Management Investment & Development(L.L.C) as the developer of Metro Tower.

Is Metro Tower completed?

The DLD registry status of Metro Tower is Cancelled, 6% complete at the last DLD inspection. The declared completion date in the registry is 1 Dec 2015 — a registry date, not a handover promise.

Who holds the escrow account for Metro Tower?

The escrow agent recorded by DLD for Metro Tower is Arab Bank For Investment & Foreign Trade Almasref P.J.S.C..

Where is Metro Tower?

Metro Tower is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is I & M Tower, about 0 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗