Data Dubai

Wadi Tower

Wadi TowerFinished100% built202 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Wadi Tower: ChatGPT · Claude · Perplexity

Wadi Tower is a project by Sky One Real Estate L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 9 sales registered in the trailing 12 months at a median AED 640k (723 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 640k
≈ US$ 174k · typical range AED 575k – AED 1.10M
DLD verified
Median price per sqft
AED 723/sqft
typical range 684 – 762 AED/sqft
DLD verified
Registered sales
9 +125.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 9 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperSky One Real Estate L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started1 Dec 2008
Declared completion14 Jun 2020 — registry date, not a handover promise
Units in the project202
Project area23 136 sqm
Escrow agentArab Bank For Investment & Foreign Trade Almasref P.J.S.C.
Project number965

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 14 technical inspections for this project, from 4 Jul 2012 at 60.8% to 14 Jun 2020 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2020-06-142012-07-042020-06-14

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
14 Jun 2020100.0% +0.0 pp
14 Jun 2020100.0% +1.6 pp
6 Apr 202098.4% +5.8 pp
10 Dec 201892.6% +8.6 pp
28 Mar 201884.0% +0.8 pp
12 Dec 201783.2% +0.0 pp
7 Sep 201783.2% +1.3 pp
6 Oct 201581.9% +2.2 pp
6 Nov 201479.7% +11.7 pp
12 Jul 201468.0% +4.5 pp
11 Mar 201463.5% +1.8 pp
3 Oct 201361.7% +1.7 pp
17 Feb 201360.0% -0.7 pp
4 Jul 201260.8% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (6) 6AED 598k 712 811 sqft — —
2-bedroom apartments insufficient data 2— — — — —
3-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
8 Oct 20263 B/R FlatReady 2 218 sqftAED 1 500 000 676
10 Aug 20261 B/R FlatReady 811 sqftAED 568 778 701
21 Jul 20262 B/R FlatReady 1 444 sqftAED 1 100 000 762
16 Jun 20261 B/R FlatReady 811 sqftAED 650 000 801
3 Jun 20261 B/R FlatReady 811 sqftAED 554 665 684
18 May 20262 B/R FlatReady 1 443 sqftAED 1 100 000 762
22 Apr 20261 B/R FlatReady 811 sqftAED 640 000 789
23 Feb 20261 B/R FlatReady 861 sqftAED 575 000 668
4 Dec 20251 B/R FlatReady 858 sqftAED 620 000 723

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Wadi Tower: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0510202320242025202605102023202420252026

registered sales per calendar year; the current year is incomplete

By month

012NovDecJanFebMarAprMayJunJulAugSepOct012DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20268AED 645k 731AED 6.69M
20255AED 620k 715AED 3.28M
20249AED 850k 658AED 7.27M
202310AED 691k 764AED 6.27M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 9 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

7 projects with a page on this site are registered within 1.2 km of Wadi Tower. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
55 Time Dubai
Cancelled · Dubai Property Ring Ltd
434 m1%—
Wadi Walk
Cancelled · Ilyas & Mustafa Galadari Management Investment & Development(L.L.C)
675 m10%1
Avenue 353
Under Cancellation · Ilyas & Mustafa Galadari Real Estate Co (L.L.C)
696 m24%79
Octagon Tower
Cancelled · Ilyas & Mustafa Galadari Management Investment & Development(L.L.C)
755 m0%1
Mag 330
Finished · Mag Property Development L.L.C
907 m100%654
I & M Tower
Cancelled · Ilyas & Mustafa Galadari Management Investment & Development(L.L.C)
1,049 m7%—
Metro Tower
Cancelled · Ilyas & Mustafa Galadari Management Investment & Development(L.L.C)
1,049 m6%—

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in City Of Arabia

Questions about Wadi Tower

Who is the developer of Wadi Tower?

The Dubai Land Department project registry lists Sky One Real Estate L.L.C as the developer of Wadi Tower.

Is Wadi Tower completed?

The DLD registry status of Wadi Tower is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 14 Jun 2020 — a registry date, not a handover promise.

How many homes are in Wadi Tower?

The DLD registry records 202 units in Wadi Tower.

What is the price per square foot in Wadi Tower?

Over the last 12 complete months the median registered sale in Wadi Tower was AED 640k, or AED 723 per sqft, from 9 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Wadi Tower?

The escrow agent recorded by DLD for Wadi Tower is Arab Bank For Investment & Foreign Trade Almasref P.J.S.C..

Where is Wadi Tower?

Wadi Tower is in the City Of Arabia community. 7 other projects with a page on this site are registered within 1.2 km; the closest is 55 Time Dubai, about 434 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Wadi Tower — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/wadi-tower/”. Reuse is permitted with attribution.