Data Dubai

Mirdif Hills- Janayen Avenue

Mirdif Hills- Janayen AvenueFinished100% built359 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Mirdif Hills- Janayen Avenue: ChatGPT · Claude · Perplexity

Mirdif Hills- Janayen Avenue is a project by Dubai Investment Real Estate (L L C), recorded at 100% complete at its last Dubai Land Department inspection. 9 sales registered in the trailing 12 months at a median AED 2.79M (1 144 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 2.79M +15.1% y/y
≈ US$ 761k · typical range AED 1.90M – AED 3.30M
DLD verified
Median price per sqft
AED 1 144/sqft -6.8% y/y
typical range 1 136 – 1 213 AED/sqft
DLD verified
Registered sales
9 -69.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 9 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDubai Investment Real Estate (L L C)
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD5 Sep 2016
Construction started21 Nov 2016
Declared completion12 Jan 2020 — registry date, not a handover promise
Units in the project359
Project area64 275 sqm
Escrow agentFirst Abu Dhabi Bank P.J.S.C.
Project number1073

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 0001 2001 400Dec 2021Jul 2022Feb 2023Sep 2023Apr 2024Nov 2024Jun 2025Jan 2026Aug 20261 0001 2001 400Dec 2021Jul 2023Feb 2025Sep 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Nov 2025: in the 11 months since, no month reached the five registered sales a median needs (4 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 5 technical inspections for this project, from 21 Feb 2017 at 6.7% to 12 Jan 2020 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2020-01-122017-02-212020-01-12

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
12 Jan 2020100.0% +19.3 pp
6 Feb 201980.7% +23.9 pp
25 Sep 201856.8% +21.2 pp
19 Nov 201735.6% +28.9 pp
21 Feb 20176.7% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
2-bedroom apartments insufficient data 3— — — — —
3-bedroom apartments insufficient data 3— — — — —
4-bedroom apartments insufficient data 3— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
18 Nov 20262 B/R Flat — JANAYEN AVENUEReady 1 608 sqftAED 1 770 000 1 101
18 Nov 20262 B/R Flat — JANAYEN AVENUEReady 1 645 sqftAED 1 950 000 1 185
6 Aug 20262 B/R Flat — JANAYEN AVENUEReady 1 645 sqftAED 1 869 273 1 136
10 Jul 20264 B/R Flat — JANAYEN AVENUE 2Ready 3 102 sqftAED 3 550 000 1 144
26 Jun 20262 B/R Flat — JANAYEN AVENUEReady 1 527 sqftAED 1 810 000 1 186
3 Jun 20263 B/R Flat — JANAYEN AVENUE 2Ready 2 563 sqftAED 3 300 000 1 288
25 Nov 20254 B/R Flat — JANAYEN AVENUE 2Ready 3 116 sqftAED 3 550 000 1 139
25 Nov 20253 B/R Flat — JANAYEN AVENUEReady 2 303 sqftAED 2 794 802 1 213
25 Nov 20253 B/R Flat — JANAYEN AVENUE 2Ready 1 961 sqftAED 2 446 628 1 247
17 Nov 20252 B/R Flat — JANAYEN AVENUEReady 3 316 sqftAED 1 900 000 573
10 Nov 20254 B/R Flat — JANAYEN AVENUE 2Ready 3 141 sqftAED 3 300 000 1 051

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Mirdif Hills- Janayen Avenue: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0204020172018201920202021202220232024202520260204020182020202220242026

registered sales per calendar year; the current year is incomplete

By month

024NovDecJanFebMarAprMayJunJulAugSepOct024DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20264— —AED 10.53M
202526AED 2.45M 1 219AED 68.18M
202451AED 2.43M 1 169AED 129.76M
202322AED 1.74M 993AED 42.07M
202225AED 1.79M 1 002AED 52.26M
202142AED 1.75M 1 001AED 82.44M
202018AED 1.69M 1 049AED 35.46M
201917AED 1.88M 1 100AED 36.27M
201828AED 1.58M 1 000AED 50.34M
201726AED 1.75M 1 203AED 50.83M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2020–2026

80k100k202020212022202320242025202680k100k2020202220242026

2-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year2-bed flat3-bed flatGross yield
2026 YTD 102k120k—
2025 89k106k—
2024 84k99k4.31%
2023 77k89k—
2022 75k86k—
2021 76k86k4.71%
2020 77k92k—

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Nov 20255 AED 2.79M1 139 1 051 – 1 213
Oct 20251 —— —
Sep 20254 —— —
Aug 20251 —— —
Jul 20252 —— —
Jun 20253 —— —
May 20251 —— —
Apr 20254 —— —
Mar 20252 —— —
Feb 20251 —— —
Jan 20252 —— —
Dec 20246 AED 2.60M1 340 1 162 – 1 519
Nov 20242 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

Buildings in this project

Building (DLD name)SalesMedian priceMedian AED/sqftOff-plan
Janayen Avenue 2 low sample (5) 5AED 3.30M 1 1440.0%
Janayen Avenue insufficient data 4— —0.0%

Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 9 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

3 projects with a page on this site are registered within 1.2 km of Mirdif Hills- Janayen Avenue. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Mirdif Hills- Nasayem Avenue
Finished · Dubai Investment Real Estate (L L C)
280 m100%407
Mirdif Hills- Al Multaqa Avenue
Finished · Dubai Investment Real Estate (L L C)
563 m100%491
Mirdif Tulip
Finished · Jersey Real Estate Development L.L.C
703 m100%146

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects by Dubai Investment Real Estate (L L C)

Questions about Mirdif Hills- Janayen Avenue

Who is the developer of Mirdif Hills- Janayen Avenue?

The Dubai Land Department project registry lists Dubai Investment Real Estate (L L C) as the developer of Mirdif Hills- Janayen Avenue.

Is Mirdif Hills- Janayen Avenue completed?

The DLD registry status of Mirdif Hills- Janayen Avenue is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 12 Jan 2020 — a registry date, not a handover promise.

How many homes are in Mirdif Hills- Janayen Avenue?

The DLD registry records 359 units in Mirdif Hills- Janayen Avenue.

What is the price per square foot in Mirdif Hills- Janayen Avenue?

Over the last 12 complete months the median registered sale in Mirdif Hills- Janayen Avenue was AED 2.79M, or AED 1 144 per sqft, from 9 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Mirdif Hills- Janayen Avenue?

The escrow agent recorded by DLD for Mirdif Hills- Janayen Avenue is First Abu Dhabi Bank P.J.S.C..

Where is Mirdif Hills- Janayen Avenue?

Mirdif Hills- Janayen Avenue is in Dubai. 3 other projects with a page on this site are registered within 1.2 km; the closest is Mirdif Hills- Nasayem Avenue, about 280 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Mirdif Hills- Janayen Avenue — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/mirdif-hills-janayen-avenue/”. Reuse is permitted with attribution.