Data Dubai

Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1

Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1Finished100% built31 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1: ChatGPT · Claude · Perplexity

Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1 is a project by District One - Fz, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
1 -66.7% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 1 record · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDistrict One - Fz
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD7 Dec 2017
Construction started1 Dec 2017
Declared completion31 Jan 2022 — registry date, not a handover promise
Units in the project31
Project area2 589 sqm
Escrow agentDubai Islamic Bank (Public Joint Stock Company)
Project number1984

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2023: in the 44 months since, no month reached the five registered sales a median needs (12 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 6 technical inspections for this project, from 8 Aug 2018 at 3.0% to 16 Feb 2022 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2022-01-312018-08-082022-02-16

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
16 Feb 2022100.0% +2.0 pp
5 Dec 202198.0% +3.0 pp
12 Jan 202195.1% +28.7 pp
22 Jan 202066.4% +55.6 pp
15 Jan 201910.8% +7.7 pp
8 Aug 20183.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
2 Nov 20262 B/R Flat — Mohammed Bin Rashid Al Maktoum City, District One Phase III, Residences 1Ready 1 373 sqftAED 2 950 000 2 149
17 Sep 20261 B/R Flat — Mohammed Bin Rashid Al Maktoum City, District One Phase III, Residences 1Ready 831 sqftAED 1 520 000 1 829

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

01020302018202220232024202520260102030201820222023202420252026

registered sales per calendar year; the current year is incomplete

By month

012MarAprMayJunJulAugSepOctNovDecJanFeb012AprJunAugOctDecFeb

registered sales per month, Mar 2023 – Feb 2024

YearSalesMedian priceMedian AED/sqftTotal registered value
20261— —AED 1.52M
20253— —AED 6.87M
20243— —AED 5.21M
202319AED 1.31M 1 590AED 31.07M
202219AED 1.75M 2 201AED 38.46M
201831AED 1.17M 1 500AED 41.16M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2023–2025

Median annual rent, AED thousand
Year1-bed flatGross yield
2025 110k—
2024 110k—
2023 110k8.39%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Feb 202314 AED 1.24M1 534 1 486 – 1 972
Jan 20230 —— —
Dec 20227 AED 1.79M2 200 2 170 – 2 213
Nov 20221 —— —
Oct 20226 AED 1.72M2 172 2 107 – 2 219

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 1 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 2
Finished · District One - Fz
49 m100%31
Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 3
Finished · District One - Fz
97 m100%31
Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 16
Finished · District One - Fz
141 m100%95
Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 15
Finished · District One - Fz
200 m100%95
Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 5
Finished · District One - Fz
244 m100%73
Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 14
Finished · District One - Fz
266 m100%136
Azizi Greenfield
Finished · Azizi Developments L.L.C
545 m100%102
Prime Views
Finished · Prescott Real Estate Development L.L.C
812 m100%153
The Galleries
Finished · Rockwell Real Estate Development L.L.C
864 m100%48
Azizi Victoria 4
Cancelled · Azizi Developments L.L.C
975 m7%1

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Mohammed Bin Rashid AL Maktoum City -District -1 Community

Questions about Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1

Who is the developer of Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1?

The Dubai Land Department project registry lists District One - Fz as the developer of Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1.

Is Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1 completed?

The DLD registry status of Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 Jan 2022 — a registry date, not a handover promise.

How many homes are in Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1?

The DLD registry records 31 units in Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1.

What is the price per square foot in Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1?

Too few sales were registered in Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1?

The escrow agent recorded by DLD for Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1 is Dubai Islamic Bank (Public Joint Stock Company).

Where is Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1?

Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1 is in the Mohammed Bin Rashid AL Maktoum City -District -1 Community community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 2, about 49 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Mohammed Bin Rashid Al Maktoum City , District One Phase Iii , Residences 1 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/mohammed-bin-rashid-al-maktoum-city-district-one-phase-iii-residences-1/”. Reuse is permitted with attribution.