Myra Onyx
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Myra Onyx: ChatGPT · Claude · Perplexity
Myra Onyx is a project by Myra Real Estate Deveiopment L.L.C, recorded at 86% complete at its last Dubai Land Department inspection. 27 sales registered in the trailing 12 months at a median AED 1.41M (1 222 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 27 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Myra Real Estate Deveiopment L.L.C |
| Status | Active |
| Construction progress | 86% — at the last DLD inspection |
| Registered with DLD | 29 Jan 2026 |
| Construction started | 13 Sep 2024 |
| Declared completion | 12 Sep 2026 — registry date, not a handover promise |
| Units in the project | 60 |
| Project area | 6 636 sqm |
| Escrow agent | First Abu Dhabi Bank P.J.S.C. |
| Project number | 4308 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2026: in the 2 months since, no month reached the five registered sales a median needs (3 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 3 technical inspections for this project, from 25 Dec 2025 at 42.6% to 9 Oct 2026 at 85.9%. Over the inspections since 25 Dec 2025 it moved 4.58 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 9 Oct 2026 | 85.9% | +19.1 pp |
| 2 Jul 2026 | 66.8% | +24.2 pp |
| 25 Dec 2025 | 42.6% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
At least 29 of the 60 homes in Myra Onyx (48%) have no off-plan sale registered with the Dubai Land Department yet, as of 23 Nov 2026. The unit register lists 60 homes and DLD has recorded 31 off-plan sale registrations; because that count also includes resales before completion, the true number without a buyer can only be higher. This is not the developer's availability list.
| Homes | No sale yet, at least | In unit register | Registered sales |
|---|---|---|---|
| 1 bedroom | 8 | 20 | 12 |
| 2 bedrooms | 21 | 40 | 19 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (12) | 12 | AED 934k | 1 264 | 739 sqft | — | — |
| 2-bedroom apartments low sample (15) | 15 | AED 1.46M | 1 091 | 1 341 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 17 Nov 2026 | 2 B/R Flat | Off-plan | 1 352 sqft | AED 1 438 000 | 1 063 |
| 9 Nov 2026 | 2 B/R Flat | Off-plan | 1 341 sqft | AED 1 415 000 | 1 055 |
| 6 Nov 2026 | 2 B/R Flat | Off-plan | 1 142 sqft | AED 1 490 000 | 1 304 |
| 4 Nov 2026 | 2 B/R Flat | Off-plan | 1 142 sqft | AED 1 506 000 | 1 318 |
| 28 Sep 2026 | 1 B/R Flat | Off-plan | 696 sqft | AED 958 000 | 1 376 |
| 28 Sep 2026 | 1 B/R Flat | Off-plan | 739 sqft | AED 915 000 | 1 238 |
| 8 Sep 2026 | 2 B/R Flat | Off-plan | 1 352 sqft | AED 1 414 000 | 1 045 |
| 25 Aug 2026 | 2 B/R Flat | Off-plan | 1 341 sqft | AED 1 440 000 | 1 074 |
| 24 Aug 2026 | 2 B/R Flat | Off-plan | 1 352 sqft | AED 1 480 000 | 1 094 |
| 20 Aug 2026 | 2 B/R Flat | Off-plan | 1 352 sqft | AED 1 450 000 | 1 072 |
| 3 Aug 2026 | 2 B/R Flat | Off-plan | 1 352 sqft | AED 1 505 000 | 1 113 |
| 3 Aug 2026 | 2 B/R Flat | Off-plan | 1 341 sqft | AED 1 464 000 | 1 092 |
| 3 Aug 2026 | 1 B/R Flat | Off-plan | 739 sqft | AED 900 000 | 1 218 |
| 30 Jul 2026 | 2 B/R Flat | Off-plan | 1 341 sqft | AED 1 470 000 | 1 096 |
| 17 Jul 2026 | 2 B/R Flat | Off-plan | 1 352 sqft | AED 1 414 000 | 1 045 |
| 17 Jul 2026 | 1 B/R Flat | Off-plan | 739 sqft | AED 912 000 | 1 234 |
| 16 Jul 2026 | 2 B/R Flat | Off-plan | 1 341 sqft | AED 1 463 000 | 1 091 |
| 2 Jul 2026 | 2 B/R Flat | Off-plan | 1 142 sqft | AED 1 500 000 | 1 313 |
| 29 Jun 2026 | 1 B/R Flat | Off-plan | 696 sqft | AED 937 000 | 1 346 |
| 23 Jun 2026 | 1 B/R Flat | Off-plan | 696 sqft | AED 990 000 | 1 422 |
| 23 Jun 2026 | 1 B/R Flat | Off-plan | 739 sqft | AED 934 000 | 1 264 |
| 23 Jun 2026 | 2 B/R Flat | Off-plan | 1 052 sqft | AED 1 461 000 | 1 389 |
| 22 May 2026 | 1 B/R Flat | Off-plan | 696 sqft | AED 972 000 | 1 396 |
| 7 May 2026 | 1 B/R Flat | Off-plan | 739 sqft | AED 925 000 | 1 252 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Myra Onyx: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Mar 2026 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 27 | AED 1.41M | 1 222 | AED 33.02M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2026 | 6 | AED 1.46M | 1 093 | 1 079 – 1 108 |
| Jul 2026 | 5 | AED 1.46M | 1 096 | 1 091 – 1 234 |
| Jun 2026 | 4 | — | — | — |
| May 2026 | 3 | — | — | — |
| Apr 2026 | 1 | — | — | — |
| Mar 2026 | 5 | AED 1.41M | 1 264 | 1 061 – 1 300 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
Questions about Myra Onyx
Who is the developer of Myra Onyx?
The Dubai Land Department project registry lists Myra Real Estate Deveiopment L.L.C as the developer of Myra Onyx.
Is Myra Onyx completed?
The DLD registry status of Myra Onyx is Active, 86% complete at the last DLD inspection. The declared completion date in the registry is 12 Sep 2026 — a registry date, not a handover promise.
How many homes are in Myra Onyx?
The DLD registry records 60 units in Myra Onyx. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Myra Onyx?
Over the last 12 complete months the median registered sale in Myra Onyx was AED 1.41M, or AED 1 222 per sqft, from 27 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Myra Onyx?
The escrow agent recorded by DLD for Myra Onyx is First Abu Dhabi Bank P.J.S.C..
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗