DubaiData

Nad Al Sheba Gardens Phase 8 & 9

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Nad Al Sheba Gardens Phase 8 & 9 is a project by Nas Estates L.L.C, recorded at 1% complete at its last Dubai Land Department inspection. 200 sales registered in the trailing 12 months at a median AED 12.01M (2 557 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 12.01M
IQR AED 5.91M – AED 16.06M
DLD verified
Median price per sqft
AED 2 557/sqft
IQR 1 878 – 2 784 AED/sqft
DLD verified
Registered sales
200 +9900.0%
all property types · trailing 12 complete months
DLD verified
Off-plan share
31.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 200 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperNas Estates L.L.C DLD verified
StatusActive DLD verified
Construction progress1% — at the last DLD inspection DLD verified
Registered with DLD10 Jul 2025 DLD verified
Construction started1 Sep 2025 DLD verified
Declared completion1 Oct 2028 — registry date, not a handover promise DLD verified
Units in the project201 DLD verified
Project area108 843 sqm DLD verified
Escrow agentEmirates Nbd Bank (P.J.S.C) DLD verified
Project number3860 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Nov 2025: in the 10 months since, no month reached the five registered sales a median needs (7 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 1 Jul 2025 at 0.0% to 20 Aug 2026 at 0.7%. Since 1 Jul 2025 the recorded percentage has moved 0.05 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2028-10-012025-07-012026-08-20

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
20 Aug 20260.7% +0.1 pp
14 May 20260.6% +0.4 pp
4 Feb 20260.2% +0.2 pp
1 Jul 20250.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Nov 202536 AED 15.69M2 558 2 225 – 2 562
Oct 2025119 AED 9.68M2 671 1 885 – 2 784

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
3-bedroom apartments 62AED 5.46M 2 557 1 962 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

05010015020252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202624AED 12.02M 1 870AED 290.77M
2025178AED 12.01M 2 562AED 2.18B

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
7 Sep 2026Land — Nad Al Sheba Gardens Phase 8 & 9Ready 8 610 sqftAED 12 188 000 —
7 Sep 2026Land — Nad Al Sheba Gardens Phase 8 & 9Ready 8 094 sqftAED 18 786 000 —
7 Sep 2026Land — Nad Al Sheba Gardens Phase 8 & 9Ready 7 559 sqftAED 12 111 000 —
18 Aug 20263 B/R Villa — Nad Al Sheba Gardens Phase 8 & 9Off-plan 3 107 sqftAED 5 836 000 1 878
9 Jul 2026Land — Nad Al Sheba Gardens Phase 8 & 9Ready 6 007 sqftAED 9 633 000 —
11 Jun 2026Land — Nad Al Sheba Gardens Phase 8 & 9Ready 7 057 sqftAED 14 867 000 —
20 Apr 2026Land — Nad Al Sheba Gardens Phase 8 & 9Ready 7 612 sqftAED 14 856 000 —
25 Mar 2026Land — Nad Al Sheba Gardens Phase 8 & 9Ready 6 370 sqftAED 11 927 000 —
25 Mar 2026Land — Nad Al Sheba Gardens Phase 8 & 9Ready 6 006 sqftAED 9 547 000 —
25 Mar 2026Land — Nad Al Sheba Gardens Phase 8 & 9Ready 7 718 sqftAED 14 750 000 —
25 Mar 20263 B/R Villa — Nad Al Sheba Gardens Phase 8 & 9Off-plan 3 206 sqftAED 5 918 000 1 846
25 Mar 2026Land — Nad Al Sheba Gardens Phase 8 & 9Ready 6 006 sqftAED 11 758 000 —

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects by Nas Estates L.L.C

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Nad Al Sheba Gardens Phase 8 & 9 — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/nad-al-sheba-gardens-phase-8-and-9/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Nad Al Sheba Gardens Phase 8 & 9. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.