Data Dubai

Red Wood Park

Red Wood ParkFinished100% built35 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Red Wood Park: ChatGPT · Claude · Perplexity

Red Wood Park is a project by Jumeirah Golf Estates L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
3 -66.7% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 3 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperJumeirah Golf Estates L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD17 Sep 2014
Construction started1 Jan 2015
Declared completion6 Nov 2016 — registry date, not a handover promise
Units in the project35
Project area13 073 sqm
Escrow agentMashreq Bank Psc
Project number1584

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 5 technical inspections for this project, from 19 Oct 2015 at 30.0% to 12 Jan 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2016-11-062015-10-192017-01-12

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
12 Jan 2017100.0% +23.9 pp
27 Jun 201676.1% +13.7 pp
26 Apr 201662.4% +19.0 pp
23 Dec 201543.4% +13.3 pp
19 Oct 201530.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
16 Feb 2026VillaReady 1 957 sqftAED 7 500 000 —
9 Jan 2026VillaReady 1 943 sqftAED 8 275 000 —
3 Nov 2025VillaReady 2 921 sqftAED 7 750 000 —

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Red Wood Park: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

010202015201620172021202220232024202520260102020152017202220242026

registered sales per calendar year; the current year is incomplete

By month

001NovDecJanFebMarAprMayJunJulAugSepOct001DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20262— —AED 15.78M
20259AED 7.00M —AED 61.60M
20247AED 5.50M —AED 40.73M
20236AED 4.20M —AED 25.80M
20223— —AED 13.00M
20216AED 3.74M —AED 21.82M
20172— —AED 7.20M
201627AED 3.07M —AED 87.00M
20158AED 3.57M —AED 29.35M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 3 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

9 projects with a page on this site are registered within 1.2 km of Red Wood Park. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Redwood Park Phase2
Finished · Jumeirah Golf Estates L.L.C
32 m100%41
Redwood Avenue
Finished · Jumeirah Golf Estates L.L.C
362 m100%50
Flame Tree Ridge
Finished · Jumeirah Golf Estates L.L.C
387 m100%33
Jumeirah Luxury
Finished · Jumeirah Luxury Living L.L.C
480 m100%165
Sienna Lakes
Finished · Sienna Lakes Ltd
574 m100%9
Alandalus Townhouse
Finished · Jumeirah Golf Estates L.L.C
911 m100%95
Lime Tree Valley
Finished · Chi Development Group Limited
1,006 m100%2
Orange Lake
Finished · Links Properties Investment Limited
1,108 m100%67
Jumeirah Golf Estates
Finished · Jumeirah Golf Estates L.L.C
1,194 m100%161

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Jumeirah Golf Estates

Questions about Red Wood Park

Who is the developer of Red Wood Park?

The Dubai Land Department project registry lists Jumeirah Golf Estates L.L.C as the developer of Red Wood Park.

Is Red Wood Park completed?

The DLD registry status of Red Wood Park is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 6 Nov 2016 — a registry date, not a handover promise.

How many homes are in Red Wood Park?

The DLD registry records 35 units in Red Wood Park.

What is the price per square foot in Red Wood Park?

Too few sales were registered in Red Wood Park in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Red Wood Park?

The escrow agent recorded by DLD for Red Wood Park is Mashreq Bank Psc.

Where is Red Wood Park?

Red Wood Park is in the Jumeirah Golf Estates community. 9 other projects with a page on this site are registered within 1.2 km; the closest is Redwood Park Phase2, about 32 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Red Wood Park — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/red-wood-park/”. Reuse is permitted with attribution.