Rufi Water Front Residency
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Rufi Water Front Residency: ChatGPT · Claude · Perplexity
Rufi Water Front Residency is a project by Rufi Water Front Residency Limited, recorded at 41% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Rufi Water Front Residency Limited |
| Status | Cancelled |
| Construction progress | 41% — at the last DLD inspection |
| Registered with DLD | 8 Nov 2008 |
| Construction started | 1 Apr 2010 |
| Declared completion | 30 Jun 2015 — registry date, not a handover promise |
| Units in the project | 1 |
| Project area | 4 877 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 500 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 8 technical inspections for this project, from 1 Aug 2012 at 22.1% to 25 Dec 2017 at 40.5%. The recorded percentage is the same as at the inspection on 31 Jul 2016: no inspection since then changed it. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 25 Dec 2017 | 40.5% | -2.3 pp |
| 24 Nov 2016 | 42.8% | +2.3 pp |
| 31 Jul 2016 | 40.5% | +1.1 pp |
| 25 Oct 2015 | 39.4% | +8.9 pp |
| 4 Mar 2014 | 30.5% | +5.2 pp |
| 7 Nov 2013 | 25.3% | +2.8 pp |
| 19 Mar 2013 | 22.5% | +0.4 pp |
| 1 Aug 2012 | 22.1% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 0 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Rufi Water Front Residency. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Mars Residences Active · Mars Star Real Estate Development L.L.C |
86 m | 80% |
| Rufi Park View Cancelled · Rufi Park View Limited |
126 m | 38% |
| Champions Tower2 Active · Fast Solutions Real Estate Development |
181 m | 78% |
| Shami Tower Cancelled · Brajeel Real Estate Development L.L.C |
184 m | 34% |
| Royale Residence2 Finished · Pan Global Development L.L.C |
241 m | 100% |
| Bermuda Views Finished · Hma Exec Limited. |
243 m | 100% |
| Giovanni Boutique Finished · Neo Solutions Limited |
266 m | 100% |
| Elite 9 Sports Residence Finished · Range 3 Investments Limited |
285 m | 100% |
| Royale Residence1 Finished · Pan Global Development L.L.C |
292 m | 100% |
| Olympic Park 6 Finished · Gulf General Investments Co. (P.S.C) |
323 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
Questions about Rufi Water Front Residency
Who is the developer of Rufi Water Front Residency?
The Dubai Land Department project registry lists Rufi Water Front Residency Limited as the developer of Rufi Water Front Residency.
Is Rufi Water Front Residency completed?
The DLD registry status of Rufi Water Front Residency is Cancelled, 41% complete at the last DLD inspection. The declared completion date in the registry is 30 Jun 2015 — a registry date, not a handover promise.
How many homes are in Rufi Water Front Residency?
The DLD registry records 1 units in Rufi Water Front Residency.
Who holds the escrow account for Rufi Water Front Residency?
The escrow agent recorded by DLD for Rufi Water Front Residency is Mashreq Bank Psc.
Where is Rufi Water Front Residency?
Rufi Water Front Residency is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is Mars Residences, about 86 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗