Data Dubai

Shami Tower

Shami TowerCancelled34% built1 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Shami Tower: ChatGPT · Claude · Perplexity

Shami Tower is a project by Brajeel Real Estate Development L.L.C, recorded at 34% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperBrajeel Real Estate Development L.L.C
StatusCancelled
Construction progress34% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started5 Feb 2008
Declared completion1 Dec 2009 — registry date, not a handover promise
Units in the project1
Project area4 731 sqm
Escrow agentEmirates Nbd Bank (P.J.S.C)
Project number540

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 5 Oct 2014 at 25.6% to 17 Nov 2016 at 33.7%. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2009-12-012014-10-052016-11-17

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
17 Nov 201633.7% +0.0 pp
19 Nov 201433.6% +8.1 pp
5 Oct 201425.6% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Shami Tower. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Bermuda Views
Finished · Hma Exec Limited.
63 m100%236
Rufi Park View
Cancelled · Rufi Park View Limited
120 m38%—
Giovanni Boutique
Finished · Neo Solutions Limited
123 m100%400
Mars Residences
Active · Mars Star Real Estate Development L.L.C
133 m80%554
Royale Residence2
Finished · Pan Global Development L.L.C
181 m100%196
Rufi Water Front Residency
Cancelled · Rufi Water Front Residency Limited
184 m41%1
Champions Tower2
Active · Fast Solutions Real Estate Development
187 m78%172
Royale Residence1
Finished · Pan Global Development L.L.C
198 m100%305
Prime Villas
Finished · Prescott Developers Limited
266 m100%32
Olympic Park 6
Finished · Gulf General Investments Co. (P.S.C)
304 m100%154

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

Questions about Shami Tower

Who is the developer of Shami Tower?

The Dubai Land Department project registry lists Brajeel Real Estate Development L.L.C as the developer of Shami Tower.

Is Shami Tower completed?

The DLD registry status of Shami Tower is Cancelled, 34% complete at the last DLD inspection. The declared completion date in the registry is 1 Dec 2009 — a registry date, not a handover promise.

How many homes are in Shami Tower?

The DLD registry records 1 units in Shami Tower.

Who holds the escrow account for Shami Tower?

The escrow agent recorded by DLD for Shami Tower is Emirates Nbd Bank (P.J.S.C).

Where is Shami Tower?

Shami Tower is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is Bermuda Views, about 63 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Shami Tower — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/shami-tower/”. Reuse is permitted with attribution.