DubaiData

The One Tower

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

The One Tower is a project by Rashed Mohammed Abdulla Almazroui Real Estate Development, recorded at 100% complete at its last Dubai Land Department inspection. 61 sales registered in the trailing 12 months at a median AED 3.32M. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 3.32M +7.3%
IQR AED 2.90M – AED 3.83M
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
61 +90.6%
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 61 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperRashed Mohammed Abdulla Almazroui Real Estate Development DLD verified
StatusFinished DLD verified
Construction progress100% — at the last DLD inspection DLD verified
Registered with DLD10 May 2010 DLD verified
Construction started16 Jun 2009 DLD verified
Declared completion14 Aug 2014 — registry date, not a handover promise DLD verified
Units in the project191 DLD verified
Project area39 117 sqm DLD verified
Escrow agentAbu Dhabi Commercial Bank DLD verified
Project number1270 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 2 technical inspections for this project, from 24 Jun 2013 at 89.1% to 20 Jan 2014 at 94.6%. Over the inspections since 24 Jun 2013 it moved 0.80 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2014-08-142013-06-242014-01-20

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
20 Jan 201494.6% +5.5 pp
24 Jun 201389.1% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
3-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

02040201120172020202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202638AED 3.44M —AED 123.87M
202551AED 3.16M —AED 163.96M
20249AED 3.05M —AED 25.17M
20204— —AED 1.95M
20173— —AED 0
20116AED 2.14M —AED 12.61M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
29 Sep 2026Office Office — THE ONE TOWERReady 1 993 sqftAED 4 000 000 —
27 Aug 2026Office Office — THE ONE TOWERReady 1 452 sqftAED 2 933 794 —
27 Aug 2026Office Office — THE ONE TOWERReady 1 658 sqftAED 3 349 523 —
24 Aug 2026Office Office — THE ONE TOWERReady 1 661 sqftAED 3 354 957 —
21 Aug 2026Office Office — THE ONE TOWERReady 1 150 sqftAED 2 322 818 —
21 Aug 2026Office Office — THE ONE TOWERReady 1 993 sqftAED 4 026 829 —
21 Aug 2026Office Office — THE ONE TOWERReady 1 770 sqftAED 3 574 571 —
7 Jul 2026Office Office — THE ONE TOWERReady 1 062 sqftAED 2 549 496 —
6 Jul 2026Office Office — THE ONE TOWERReady 1 365 sqftAED 2 934 868 —
6 Jul 2026Office Office — THE ONE TOWERReady 1 664 sqftAED 3 577 582 —
6 Jul 2026Office Office — THE ONE TOWERReady 1 062 sqftAED 2 283 924 —
3 Jul 2026Office Office — THE ONE TOWERReady 1 971 sqftAED 4 236 919 —

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “The One Tower — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/the-one-tower/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for The One Tower. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.