Topaz Residences 4
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Topaz Residences 4: ChatGPT · Claude · Perplexity
Topaz Residences 4 is a project by Gulf General Investments Co. (P.S.C), recorded at 37% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Gulf General Investments Co. (P.S.C) |
| Status | Cancelled |
| Construction progress | 37% — at the last DLD inspection |
| Registered with DLD | 22 Feb 2016 |
| Construction started | 9 Aug 2015 |
| Declared completion | 8 Aug 2016 — registry date, not a handover promise |
| Units in the project | 0 |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) |
| Project number | 1728 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 3 May 2017 at 36.8% to 11 Oct 2017 at 36.8%. The recorded percentage is the same as at the inspection on 3 May 2017: no inspection since then changed it. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 11 Oct 2017 | 36.8% | +0.0 pp |
| 3 May 2017 | 36.8% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 0 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Topaz Residences 4. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| It Plaza Finished · Fatima International (Fzc) |
94 m | 100% |
| Selicon Star 2 Finished · Adel Mohammad Saleh Ali Naqi Al Zarooni |
104 m | 100% |
| Silicon Heights Finished · Vision Avenue Homes (Fzc) |
108 m | 100% |
| Axis Residences 6 Finished · Gulf General Investments Co. (P.S.C) |
184 m | 100% |
| Silicon Gate2 Finished · Time Properties |
184 m | 100% |
| Al Falak Residence Finished · Al Falak Residence Fzco |
232 m | 100% |
| Axis Residences 8 Finished · Gulf General Investments Co. (P.S.C) |
261 m | 100% |
| Arabian Gate Finished · Time Properties |
294 m | 100% |
| Topaz Residences 3 Finished · Gulf General Investments Co. (P.S.C) |
308 m | 100% |
| Imperial Finished · Bonyan Emirates Properties |
368 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
Questions about Topaz Residences 4
Who is the developer of Topaz Residences 4?
The Dubai Land Department project registry lists Gulf General Investments Co. (P.S.C) as the developer of Topaz Residences 4.
Is Topaz Residences 4 completed?
The DLD registry status of Topaz Residences 4 is Cancelled, 37% complete at the last DLD inspection. The declared completion date in the registry is 8 Aug 2016 — a registry date, not a handover promise.
Who holds the escrow account for Topaz Residences 4?
The escrow agent recorded by DLD for Topaz Residences 4 is Dubai Islamic Bank (Public Joint Stock Company).
Where is Topaz Residences 4?
Topaz Residences 4 is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is It Plaza, about 94 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗