Ac3
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Ac3: ChatGPT · Claude · Perplexity
Ac3 is a project by Lootah Real Estate Investement, recorded at 36% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 1 record · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Lootah Real Estate Investement |
| Status | Cancelled |
| Construction progress | 36% — at the last DLD inspection |
| Registered with DLD | 5 May 2009 |
| Construction started | 1 Jan 2009 |
| Declared completion | 30 Sep 2017 — registry date, not a handover promise |
| Units in the project | 273 |
| Project area | 23 961 sqm |
| Escrow agent | Emirates Islamic Bank P.J.S.C. |
| Project number | 1172 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
No month in this window reached the five registered sales a median needs, so there is nothing to plot.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 2 technical inspections for this project, from 31 Dec 2014 at 35.5% to 23 Jul 2015 at 35.6%. Since 31 Dec 2014 the recorded percentage has moved 0.02 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 23 Jul 2015 | 35.6% | +0.1 pp |
| 31 Dec 2014 | 35.5% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 18 Dec 2025 | Building | Ready | 145 669 sqft | AED 182 100 000 | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Ac3: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2025 | 1 | — | — | AED 0 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent by year, 2022–2026
| Year | Studio | 1-bed flat | 2-bed flat |
|---|---|---|---|
| 2026 YTD | 35k | 46k | — |
| 2025 | 35k | 47k | 66k |
| 2024 | 35k | 45k | 65k |
| 2023 | 33k | 45k | 62k |
| 2022 | 29k | 43k | 57k |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 1 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Ac3. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Mirdad Active · Mirdad Real Estate Development L.L.C |
423 m | 6% |
| Detroit House Finished · Al Tamimi Investments Limited |
441 m | 100% |
| Kensington Royale Cancelled · M E Development L.L.C |
562 m | 75% |
| The Bridge Finished · T F G Real Estate L.L.C |
617 m | 100% |
| Coral International Hotel Apartment Finished · Arabian Investments Limited |
627 m | 100% |
| Red Residence Finished · M E Development L.L.C |
673 m | 100% |
| Hera Tower Finished · Titans Real Estate Developers L.L.C |
724 m | 100% |
| Casa Flores And Eden Apartments Finished · National Properties Owned By National Bonds Corporation Sole Proprietorship Psc Sole Proprietorship L.L.C |
724 m | 100% |
| Elite 5 Sports Residence Finished · Triplanet International (Fzc) |
739 m | 100% |
| Takaya Active · Takaya Real Estate Development L.L.C |
778 m | 16% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Motor City
Questions about Ac3
Who is the developer of Ac3?
The Dubai Land Department project registry lists Lootah Real Estate Investement as the developer of Ac3.
Is Ac3 completed?
The DLD registry status of Ac3 is Cancelled, 36% complete at the last DLD inspection. The declared completion date in the registry is 30 Sep 2017 — a registry date, not a handover promise.
How many homes are in Ac3?
The DLD registry records 273 units in Ac3.
What is the price per square foot in Ac3?
Too few sales were registered in Ac3 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.
Who holds the escrow account for Ac3?
The escrow agent recorded by DLD for Ac3 is Emirates Islamic Bank P.J.S.C..
Where is Ac3?
Ac3 is in the Motor City community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Mirdad, about 423 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗