Alsaqran Tower

Alsaqran TowerCancelled38% builtDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Alsaqran Tower: ChatGPT · Claude · Perplexity

Alsaqran Tower is a project by Al Saqran Tower Investments (L.L.C), recorded at 38% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperAl Saqran Tower Investments (L.L.C)
StatusCancelled
Construction progress38% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started1 Mar 2009
Declared completion29 Feb 2024 — registry date, not a handover promise
Units in the project0
Escrow agentDubai Islamic Bank (Public Joint Stock Company)
Project number818

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 11 technical inspections for this project, from 11 Jun 2012 at 35.5% to 10 Aug 2021 at 38.1%. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2024-02-292012-06-112021-08-10

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
10 Aug 202138.1% -1.5 pp
28 Jan 201839.6% +0.1 pp
22 Aug 201739.6% +0.4 pp
8 Feb 201739.2% +2.3 pp
27 Apr 201636.9% +1.6 pp
21 May 201535.3% +1.8 pp
16 Dec 201433.5% -8.7 pp
9 Aug 201442.2% +0.0 pp
26 Mar 201342.2% +2.1 pp
18 Dec 201240.1% +4.6 pp
11 Jun 201235.5% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Alsaqran Tower. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Saba Tower 2
Finished · Saba Properties Dmcc
169 m100%377
New Dubai Gate1
Finished · Bonyan International Investment Group (Holding) (L.L.C)
208 m100%621
Tiffany Towers
Finished · Allana Feroz Abdul Razak & Allana Shiraz Abdul Razak
228 m100%306
Saba Tower 3
Finished · Saba Properties Dmcc
271 m100%361
Jumeirah Business Centre 5
Finished · Al Fajer Properties (L. L. C)
273 m100%299
Liwa Heights
Finished · Maysan Real Estate Investment (L.L.C)
310 m100%307
Armada Towers
Finished · Mohammad Rahif Hakmi
334 m100%1166
Jumeirah Business Centre2
Finished · Al Fajer Properties (L. L. C)
384 m100%295
V3
Finished · Sheikh Suroor Bin Mohd Alnehayan
454 m100%331
Bayside Residence
Finished · Trident International Holding (Fzco)
459 m100%108

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

Questions about Alsaqran Tower

Who is the developer of Alsaqran Tower?

The Dubai Land Department project registry lists Al Saqran Tower Investments (L.L.C) as the developer of Alsaqran Tower.

Is Alsaqran Tower completed?

The DLD registry status of Alsaqran Tower is Cancelled, 38% complete at the last DLD inspection. The declared completion date in the registry is 29 Feb 2024 — a registry date, not a handover promise.

Who holds the escrow account for Alsaqran Tower?

The escrow agent recorded by DLD for Alsaqran Tower is Dubai Islamic Bank (Public Joint Stock Company).

Where is Alsaqran Tower?

Alsaqran Tower is in Dubai. 10 other projects with a page on this site are registered within 1.2 km; the closest is Saba Tower 2, about 169 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Alsaqran Tower — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/alsaqran-tower/”. Reuse is permitted with attribution.