Data Dubai

Saba Tower 3

Saba Tower 3Finished100% built361 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Saba Tower 3: ChatGPT · Claude · Perplexity

Saba Tower 3 is a project by Saba Properties Dmcc, recorded at 100% complete at its last Dubai Land Department inspection. 29 sales registered in the trailing 12 months at a median AED 1.21M (1 565 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.21M -19.7% y/y
≈ US$ 330k · typical range AED 878k – AED 1.70M
DLD verified
Median price per sqft
AED 1 565/sqft +12.1% y/y
typical range 1 356 – 1 642 AED/sqft
DLD verified
Registered sales
29 -35.6% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 29 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperSaba Properties Dmcc
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD8 Nov 2008
Construction started20 Jan 2008
Declared completion26 Jan 2008 — registry date, not a handover promise
Units in the project361
Project area34 477 sqm
Project number464

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 0001 2501 5001 750Sep 2023Jan 2024May 2024Sep 2024Jan 2025May 2025Sep 2025Jan 2026May 2026Sep 20261 0001 2501 5001 750Sep 2023Sep 2024Sep 2025Sep 2026

median of a month with no neighbouring month to join it to   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jun 2026: in the 4 months since, no month reached the five registered sales a median needs (5 in total) · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios low sample (9) 9AED 780k 1 643 457 sqft — —
1-bedroom apartments low sample (12) 12AED 1.20M 1 412 801 sqft — —
2-bedroom apartments low sample (7) 7AED 1.75M 1 400 1 181 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
21 Sep 2026Studio Flat — SABA 3Ready 533 sqftAED 840 000 1 577
7 Sep 2026Studio Flat — SABA 3Ready 456 sqftAED 750 000 1 643
7 Sep 20262 B/R Flat — SABA 3Ready 1 106 sqftAED 1 800 000 1 628
2 Sep 20262 B/R Flat — SABA 3Ready 1 379 sqftAED 1 850 000 1 342
30 Jul 20262 B/R Flat — SABA 3Ready 1 455 sqftAED 1 750 000 1 203
28 Jul 2026Studio Flat — SABA 3Ready 457 sqftAED 39 643 87
24 Jul 20261 B/R Flat — SABA 3Ready 777 sqftAED 17 985 23
24 Jul 20261 B/R Flat — SABA 3Ready 902 sqftAED 23 942 27
29 Jun 20261 B/R Flat — SABA 3Ready 987 sqftAED 1 225 000 1 242
25 Jun 2026Studio Flat — SABA 3Ready 457 sqftAED 620 000 1 356
19 Jun 20262 B/R Flat — SABA 3Ready 1 103 sqftAED 1 727 000 1 565
15 Jun 20261 B/R Flat — SABA 3Ready 708 sqftAED 1 050 000 1 483
3 Jun 20261 B/R Flat — SABA 3Ready 934 sqftAED 1 200 000 1 285
18 May 20261 B/R Flat — SABA 3Ready 708 sqftAED 1 000 000 1 412
1 Apr 20262 B/R Flat — SABA 3Ready 1 229 sqftAED 1 720 000 1 400
16 Mar 2026Studio Flat — SABA 3Ready 457 sqftAED 780 000 1 706
11 Mar 20261 B/R Flat — SABA 3Ready 825 sqftAED 964 460 1 169
23 Jan 2026Studio Flat — SABA 3Ready 533 sqftAED 875 000 1 642
7 Jan 20261 B/R Flat — SABA 3Ready 902 sqftAED 25 714 29
7 Jan 2026Studio Flat — SABA 3Ready 457 sqftAED 20 549 45
7 Jan 20261 B/R Flat — SABA 3Ready 777 sqftAED 49 530 64
29 Dec 20252 B/R Flat — SABA 3Ready 1 103 sqftAED 1 875 000 1 700
25 Dec 20251 B/R Flat — SABA 3Ready 987 sqftAED 69 377 70
11 Dec 20251 B/R Flat — SABA 3Ready 777 sqftAED 1 250 000 1 609

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Saba Tower 3: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0204020152016201720182019202020212022202320242025202602040201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

024NovDecJanFebMarAprMayJunJulAugSepOct024DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202621AED 1.05M 1 412AED 18.15M
202543AED 1.44M 1 412AED 54.74M
202442AED 1.11M 1 391AED 48.43M
202338AED 990k 1 158AED 40.13M
202231AED 1.00M 983AED 39.88M
202122AED 846k 851AED 20.37M
202013AED 840k 805AED 10.60M
201918AED 795k 904AED 13.75M
20189AED 1.07M 1 085AED 9.52M
201744AED 1.16M 1 293AED 56.85M
201632AED 1.24M 1 227AED 41.46M
201529AED 1.10M 1 389AED 32.88M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2013–2026

60k80k2013201420152016201720182019202020212022202320242025202660k80k2013201720212025

1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
YearStudio1-bed flat2-bed flatGross yield
2026 YTD 59k80k120k—
2025 61k85k120k7.27%
2024 60k80k120k6.96%
2023 50k74k101k—
2022 42k61k85k—
2021 34k54k75k—
2020 35k56k75k—
2019 44k67k90k—
2018 52k72k105k—
2017 60k85k118k7.73%
2016 65k85k120k—
2015 66k90k124k—
2014 61k80k115k—
2013 55k72k99k7.87%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jun 20265 AED 1.20M1 356 1 285 – 1 483
May 20261 —— —
Apr 20261 —— —
Mar 20262 —— —
Feb 20260 —— —
Jan 20261 —— —
Dec 20255 AED 1.25M1 661 1 609 – 1 665
Nov 20252 —— —
Oct 20252 —— —
Sep 20251 —— —
Aug 20252 —— —
Jul 20256 AED 1.41M1 397 1 330 – 1 431
Jun 20253 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Saba Tower 3. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
New Dubai Gate1
Finished · Bonyan International Investment Group (Holding) (L.L.C)
85 m100%621
Armada Towers
Finished · Mohammad Rahif Hakmi
85 m100%1166
Saba Tower 2
Finished · Saba Properties Dmcc
104 m100%377
Madina Tower
Finished · Reef Real Estate Investment Co (L.L.C)
232 m100%205
Alsaqran Tower
Cancelled · Al Saqran Tower Investments (L.L.C)
271 m38%—
Reef Tower
Finished · Reef Real Estate Investment Co (L.L.C)
336 m100%121
Tiffany Towers
Finished · Allana Feroz Abdul Razak & Allana Shiraz Abdul Razak
442 m100%306
Jumeirah Business Centre 5
Finished · Al Fajer Properties (L. L. C)
446 m100%299
Inigo Icon
Finished · Emirates Properties Investments Ltd
495 m100%246
Dubai Marina Mall
Finished · Emaar Properties (P.J.S.C)
507 m100%651

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in DMCC Master Community

Questions about Saba Tower 3

Who is the developer of Saba Tower 3?

The Dubai Land Department project registry lists Saba Properties Dmcc as the developer of Saba Tower 3.

Is Saba Tower 3 completed?

The DLD registry status of Saba Tower 3 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 26 Jan 2008 — a registry date, not a handover promise.

How many homes are in Saba Tower 3?

The DLD registry records 361 units in Saba Tower 3.

What is the price per square foot in Saba Tower 3?

Over the last 12 complete months the median registered sale in Saba Tower 3 was AED 1.21M, or AED 1 565 per sqft, from 29 registered sales. These are DLD registrations, not asking prices.

Where is Saba Tower 3?

Saba Tower 3 is in the DMCC Master Community community. 10 other projects with a page on this site are registered within 1.2 km; the closest is New Dubai Gate1, about 85 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Saba Tower 3 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/saba-tower-3/”. Reuse is permitted with attribution.