Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Antalya By Karma is a project by Karma D S C Developers L.L.C, recorded at 0% complete at its last Dubai Land Department inspection. 100 sales registered in the trailing 12 months at a median AED 1.16M (1 493 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.16M -0.4%
IQR AED 766k – AED 1.57M
DLD verified
Median price per sqft
AED 1 493/sqft +2.3%
IQR 1 404 – 1 804 AED/sqft
DLD verified
Registered sales
100 +1566.7%
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 100 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperKarma D S C Developers L.L.C DLD verified
StatusActive DLD verified
Construction progress0% — at the last DLD inspection DLD verified
Registered with DLD23 Jul 2025 DLD verified
Construction started1 Oct 2025 DLD verified
Declared completion30 Sep 2028 — registry date, not a handover promise DLD verified
Units in the project192 DLD verified
Project area15 824 sqm DLD verified
Escrow agentFirst Abu Dhabi Bank P.J.S.C. DLD verified
Project number3775 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 4001 6001 800Sep 2025Oct 2025Nov 2025Dec 2025Jan 2026Feb 2026Mar 2026Apr 2026May 2026Jun 2026Jul 2026Aug 2026Sep 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jun 2026: in the 3 months since, no month reached the five registered sales a median needs (9 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 2 technical inspections for this project, from 19 May 2025 at 0.0% to 14 Apr 2026 at 0.1%. The recorded percentage is the same as at the inspection on 19 May 2025: no inspection since then changed it. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2028-09-302025-05-192026-04-14

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
14 Apr 20260.1% +0.1 pp
19 May 20250.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jun 20265 AED 1.24M1 425 1 405 – 1 599
May 20261 —— —
Apr 20266 AED 799k1 819 1 635 – 1 863
Mar 202611 AED 1.12M1 591 1 426 – 1 780
Feb 202614 AED 968k1 666 1 420 – 1 821
Jan 202618 AED 1.67M1 444 1 427 – 1 475
Dec 202536 AED 1.18M1 478 1 374 – 1 810
Nov 20250 —— —
Oct 20250 —— —
Sep 20255 AED 1.14M1 460 1 455 – 1 775

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios 39AED 760k 1 825 415 sqft — —
1-bedroom apartments 21AED 1.16M 1 455 795 sqft — —
2-bedroom apartments 35AED 1.61M 1 355 1 179 sqft — —
3-bedroom apartments low sample (5) 5AED 2.51M 1 591 1 590 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

0204060202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202664AED 1.15M 1 502AED 81.17M
202541AED 1.18M 1 475AED 47.34M
20241— —AED 27.00M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
21 Sep 2026Studio Flat — Antalya By KarmaOff-plan 415 sqftAED 760 031 1 830
9 Sep 20261 B/R Flat — Antalya By KarmaOff-plan 770 sqftAED 1 148 034 1 490
9 Sep 20261 B/R Flat — Antalya By KarmaOff-plan 786 sqftAED 1 101 765 1 403
9 Sep 20262 B/R Flat — Antalya By KarmaOff-plan 1 163 sqftAED 1 533 619 1 319
19 Aug 2026Studio Flat — Antalya By KarmaOff-plan 413 sqftAED 723 523 1 750
19 Aug 2026Studio Flat — Antalya By KarmaOff-plan 415 sqftAED 741 260 1 785
10 Aug 20261 B/R Flat — Antalya By KarmaOff-plan 799 sqftAED 1 168 976 1 464
10 Aug 20263 B/R Flat — Antalya By KarmaOff-plan 1 594 sqftAED 2 497 606 1 567
13 Jul 2026Studio Flat — Antalya By KarmaOff-plan 415 sqftAED 768 792 1 851
29 Jun 20261 B/R Flat — Antalya By KarmaOff-plan 774 sqftAED 1 238 468 1 599
15 Jun 20262 B/R Flat — Antalya By KarmaOff-plan 1 164 sqftAED 1 635 661 1 405
9 Jun 20262 B/R Flat — Antalya By KarmaOff-plan 1 203 sqftAED 1 527 504 1 270

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai Sports City

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Antalya By Karma — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/antalya-by-karma/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Antalya By Karma. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.