DubaiData

Aykon City

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Aykon City is a project by Damac Canal One Property Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 110 sales registered in the trailing 12 months at a median AED 932k (1 646 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 932k -6.8%
IQR AED 710k – AED 1.18M
DLD verified
Median price per sqft
AED 1 646/sqft -0.6%
IQR 1 487 – 1 769 AED/sqft
DLD verified
Registered sales
110 -12.0%
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 110 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperDamac Canal One Property Development L.L.C DLD verified
StatusFinished DLD verified
Construction progress100% — at the last DLD inspection DLD verified
Registered with DLD15 Feb 2016 DLD verified
Construction started1 Jul 2016 DLD verified
Declared completion30 Aug 2023 — registry date, not a handover promise DLD verified
Units in the project1 231 DLD verified
Project area133 058 sqm DLD verified
Escrow agentEmirates Nbd Bank (P.J.S.C) DLD verified
Project number1726 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 5002 0002 500Feb 2022Sep 2022Apr 2023Nov 2023Jun 2024Jan 2025Aug 2025Mar 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 18 technical inspections for this project, from 11 Aug 2016 at 1.6% to 31 Jul 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2023-08-302016-08-112023-07-31

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
31 Jul 2023100.0% +5.5 pp
23 Dec 202294.5% +4.3 pp
7 Sep 202290.2% +4.6 pp
8 Feb 202285.7% +7.2 pp
5 Aug 202178.5% +11.2 pp
24 Jan 202167.3% +7.1 pp
5 Aug 202060.2% +10.1 pp
28 Apr 202050.0% +13.9 pp
26 Dec 201936.1% +15.3 pp
4 Jul 201920.8% +2.3 pp
10 Feb 201918.5% +2.1 pp
3 Oct 201816.4% +4.3 pp
27 May 201812.1% +2.5 pp
10 Jan 20189.6% +1.2 pp
15 Aug 20178.4% +1.6 pp
27 Mar 20176.8% +2.6 pp
6 Nov 20164.2% +2.7 pp
11 Aug 20161.6% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Sep 20268 AED 943k1 414 1 333 – 1 837
Aug 20266 AED 640k1 459 1 442 – 1 540
Jul 20266 AED 714k1 479 1 440 – 1 861
Jun 20267 AED 1.00M1 440 1 438 – 1 506
May 202621 AED 720k1 689 1 689 – 1 689
Apr 20264 —— —
Mar 20265 AED 1.10M1 488 1 298 – 1 548
Feb 20267 AED 1.25M1 537 1 525 – 1 634
Jan 202616 AED 1.05M1 560 1 504 – 1 834
Dec 20257 AED 915k1 687 1 575 – 1 834
Nov 20259 AED 1.08M1 703 1 584 – 1 892
Oct 202514 AED 762k1 747 1 573 – 1 818
Sep 202510 AED 748k1 610 1 524 – 1 733

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios 54AED 710k 1 689 420 sqft — —
1-bedroom apartments 37AED 1.05M 1 510 695 sqft — —
2-bedroom apartments low sample (12) 12AED 1.82M 1 689 1 067 sqft — —
3-bedroom apartments low sample (7) 7AED 2.38M 1 398 1 703 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

020040020162017201820192020202120222023202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202680AED 930k 1 557AED 88.00M
2025123AED 976k 1 650AED 128.77M
202489AED 1.00M 1 874AED 97.77M
2023113AED 1.27M 1 966AED 159.49M
2022428AED 1.32M 1 977AED 582.10M
202121AED 1.15M 1 877AED 29.68M
202079AED 1.11M 1 515AED 96.79M
201949AED 988k 1 886AED 55.46M
201855AED 1.16M 1 859AED 62.13M
2017175AED 1.20M 1 852AED 217.67M
2016303AED 846k 1 590AED 309.46M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
28 Sep 20261 B/R Hotel Apartment — AYKON CITY Ready 695 sqftAED 995 000 1 431
25 Sep 2026Studio Hotel Apartment — AYKON CITY Ready 331 sqftAED 891 800 2 693
24 Sep 2026Studio Hotel Apartment — AYKON CITY Ready 426 sqftAED 774 000 1 819
22 Sep 20263 B/R Hotel Apartment — AYKON CITY Ready 1 699 sqftAED 2 150 000 1 265
18 Sep 20263 B/R Hotel Apartment — AYKON CITY Ready 1 703 sqftAED 2 380 000 1 398
8 Sep 20261 B/R Hotel Apartment — AYKON CITY Ready 830 sqftAED 1 125 000 1 356
7 Sep 20261 B/R Hotel Apartment — AYKON CITY Ready 695 sqftAED 800 000 1 151
7 Sep 2026Studio Hotel Apartment — AYKON CITY Ready 449 sqftAED 850 000 1 892
31 Aug 20263 B/R Hotel Apartment — AYKON CITY Ready 1 703 sqftAED 2 000 000 1 175
19 Aug 2026Studio Hotel Apartment — AYKON CITY Ready 343 sqftAED 660 000 1 922
18 Aug 2026Studio Hotel Apartment — AYKON CITY Ready 347 sqftAED 500 000 1 442
18 Aug 2026Studio Hotel Apartment — AYKON CITY Ready 423 sqftAED 660 000 1 562

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects by Damac Canal One Property Development L.L.C

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Aykon City — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/aykon-city/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Aykon City. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.