DubaiData

Aykon City 2

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Aykon City 2 is a project by Damac Canal Two Property Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 67 sales registered in the trailing 12 months at a median AED 1.47M (1 814 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.47M +2.8%
IQR AED 1.22M – AED 1.65M
DLD verified
Median price per sqft
AED 1 814/sqft -8.0%
IQR 1 688 – 1 996 AED/sqft
DLD verified
Registered sales
67 -50.4%
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 67 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperDamac Canal Two Property Development L.L.C DLD verified
StatusFinished DLD verified
Construction progress100% — at the last DLD inspection DLD verified
Registered with DLD19 Apr 2016 DLD verified
Construction started1 Jul 2016 DLD verified
Declared completion12 Oct 2023 — registry date, not a handover promise DLD verified
Units in the project986 DLD verified
Project area192 361 sqm DLD verified
Escrow agentAbu Dhabi Commercial Bank DLD verified
Project number1746 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 5002 0002 500Oct 2021May 2022Dec 2022Jul 2023Feb 2024Sep 2024Apr 2025Nov 2025Jun 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 20 technical inspections for this project, from 30 Oct 2016 at 2.1% to 12 Oct 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2023-10-122016-10-302023-10-12

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
12 Oct 2023100.0% +3.9 pp
31 Jul 202396.1% +1.7 pp
14 Apr 202394.4% +3.6 pp
23 Dec 202290.8% +3.7 pp
2 Sep 202287.1% +7.0 pp
17 Mar 202280.0% +6.9 pp
21 Sep 202173.2% +12.6 pp
1 Apr 202160.6% +10.5 pp
11 Nov 202050.1% +10.0 pp
4 Aug 202040.1% +7.7 pp
25 Feb 202032.4% +15.5 pp
20 Aug 201916.9% +3.3 pp
3 Apr 201913.6% +1.9 pp
7 Nov 201811.7% +1.2 pp
3 Jul 201810.5% +1.4 pp
18 Mar 20189.1% +3.0 pp
12 Nov 20176.1% +1.1 pp
13 Jul 20175.0% +1.9 pp
12 Mar 20173.1% +1.0 pp
30 Oct 20162.1% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Sep 20267 AED 1.52M1 653 1 604 – 2 043
Aug 20266 AED 1.48M1 586 1 565 – 1 764
Jul 20261 —— —
Jun 20263 —— —
May 20263 —— —
Apr 20263 —— —
Mar 20266 AED 1.21M1 869 1 781 – 1 996
Feb 20268 AED 1.41M1 796 1 690 – 2 050
Jan 20265 AED 1.55M1 906 1 786 – 2 150
Dec 20259 AED 1.45M1 815 1 784 – 1 906
Nov 20259 AED 1.47M1 817 1 722 – 1 864
Oct 20256 AED 1.62M1 850 1 830 – 2 118
Sep 202511 AED 1.55M1 927 1 899 – 2 297

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios low sample (11) 11AED 850k 1 937 446 sqft — —
1-bedroom apartments low sample (8) 8AED 1.05M 1 815 563 sqft — —
2-bedroom apartments 43AED 1.50M 1 797 814 sqft — —
3-bedroom apartments low sample (5) 5AED 2.40M 1 843 1 302 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

010020020162017201820192020202120222023202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202643AED 1.45M 1 785AED 60.73M
2025127AED 1.47M 1 935AED 184.38M
2024102AED 1.50M 2 061AED 151.19M
2023228AED 1.52M 1 984AED 343.30M
2022181AED 1.50M 1 898AED 249.50M
2021113AED 1.40M 1 965AED 161.80M
202035AED 1.40M 1 715AED 51.06M
2019119AED 1.36M 1 703AED 152.00M
2018224AED 1.33M 1 678AED 266.13M
2017240AED 1.24M 1 672AED 280.73M
201635AED 805k 1 604AED 32.03M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
28 Sep 20263 B/R Flat — AYKON CITY 2Ready 1 302 sqftAED 2 043 122 1 569
25 Sep 20262 B/R Flat — AYKON CITY 2Ready 947 sqftAED 1 520 000 1 606
24 Sep 20262 B/R Flat — AYKON CITY 2Ready 799 sqftAED 1 320 000 1 653
15 Sep 20262 B/R Flat — AYKON CITY 2Ready 817 sqftAED 2 137 920 2 618
10 Sep 20262 B/R Flat — AYKON CITY 2Ready 812 sqftAED 1 300 000 1 602
8 Sep 20262 B/R Flat — AYKON CITY 2Ready 813 sqftAED 1 775 000 2 182
2 Sep 2026Studio Flat — AYKON CITY 2Ready 446 sqftAED 850 000 1 904
25 Aug 20262 B/R Flat — AYKON CITY 2Ready 898 sqftAED 1 400 000 1 560
13 Aug 20262 B/R Flat — AYKON CITY 2Ready 953 sqftAED 1 485 000 1 558
13 Aug 20262 B/R Flat — AYKON CITY 2Ready 943 sqftAED 1 500 000 1 591
6 Aug 20262 B/R Flat — AYKON CITY 2Ready 817 sqftAED 1 510 000 1 848
4 Aug 20262 B/R Flat — AYKON CITY 2Ready 810 sqftAED 1 475 000 1 822

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Aykon City 2 — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/aykon-city-2/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Aykon City 2. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.