Bianca
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Bianca is a project by Reportage Prime Properties L.L.C, recorded at 56% complete at its last Dubai Land Department inspection. 73 sales registered in the trailing 12 months at a median AED 1.32M (1 312 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 73 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Reportage Prime Properties L.L.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 56% — at the last DLD inspection | DLD verified |
| Registered with DLD | 27 Mar 2023 | DLD verified |
| Construction started | 30 Sep 2023 | DLD verified |
| Declared completion | 31 Dec 2026 — registry date, not a handover promise | DLD verified |
| Units in the project | 653 | DLD verified |
| Project area | 65 049 sqm | DLD verified |
| Escrow agent | Arab Bank For Investment & Foreign Trade Almasref P.J.S.C. | DLD verified |
| Project number | 2553 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 8 technical inspections for this project, from 15 Mar 2023 at 0.0% to 3 Jun 2026 at 56.1%. Over the inspections since 23 Dec 2024 it moved 2.64 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 3 Jun 2026 | 56.1% | +8.2 pp |
| 5 Feb 2026 | 47.9% | +12.4 pp |
| 21 Oct 2025 | 35.5% | +5.4 pp |
| 11 Jun 2025 | 30.2% | +10.3 pp |
| 12 Mar 2025 | 19.8% | +9.4 pp |
| 23 Dec 2024 | 10.5% | +10.3 pp |
| 9 May 2024 | 0.2% | +0.2 pp |
| 15 Mar 2023 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Sep 2026 | 5 | AED 1.32M | 1 334 | 1 332 – 1 733 |
| Aug 2026 | 4 | — | — | — |
| Jul 2026 | 4 | — | 1 230 | 1 158 – 1 232 |
| Jun 2026 | 6 | AED 1.28M | 1 261 | 1 065 – 1 294 |
| May 2026 | 3 | — | — | — |
| Apr 2026 | 5 | AED 1.34M | 1 358 | 1 224 – 1 373 |
| Mar 2026 | 2 | — | — | — |
| Feb 2026 | 2 | — | — | — |
| Jan 2026 | 2 | — | — | — |
| Dec 2025 | 5 | AED 1.37M | 1 316 | 1 214 – 1 406 |
| Nov 2025 | 11 | AED 1.39M | 1 406 | 1 242 – 1 475 |
| Oct 2025 | 21 | AED 1.32M | 1 305 | 836 – 1 377 |
| Sep 2025 | 17 | AED 1.26M | 1 137 | 954 – 1 345 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 2-bedroom apartments | 56 | AED 1.30M | 1 306 | 976 sqft | — | — |
| 4-bedroom apartments low sample (17) | 17 | AED 1.80M | 1 733 | 976 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 36 | AED 1.30M | 1 299 | AED 46.51M |
| 2025 | 98 | AED 1.31M | 1 248 | AED 129.29M |
| 2024 | 270 | AED 1.29M | 1 258 | AED 354.47M |
| 2023 | 256 | AED 903k | 895 | AED 261.02M |
| 2022 | 1 | — | — | AED 73.75M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 22 Sep 2026 | 2 B/R Villa — Bianca | Off-plan | 989 sqft | AED 1 320 000 | 1 334 |
| 21 Sep 2026 | 4 B/R Villa — Bianca | Off-plan | 976 sqft | AED 2 000 000 | 2 050 |
| 14 Sep 2026 | 2 B/R Villa — Bianca | Off-plan | 976 sqft | AED 1 300 000 | 1 332 |
| 14 Sep 2026 | 2 B/R Villa — Bianca | Off-plan | 976 sqft | AED 1 250 000 | 1 281 |
| 8 Sep 2026 | 4 B/R Villa — Bianca | Off-plan | 1 010 sqft | AED 1 750 000 | 1 733 |
| 31 Aug 2026 | 2 B/R Villa — Bianca | Off-plan | 1 014 sqft | AED 1 170 000 | 1 153 |
| 24 Aug 2026 | 2 B/R Villa — Bianca | Off-plan | 976 sqft | AED 1 436 029 | 1 472 |
| 20 Aug 2026 | 2 B/R Villa — Bianca | Off-plan | 966 sqft | AED 1 300 000 | 1 346 |
| 17 Aug 2026 | 2 B/R Villa — Bianca | Off-plan | 976 sqft | AED 1 300 000 | 1 332 |
| 23 Jul 2026 | 2 B/R Villa — Bianca | Off-plan | 976 sqft | AED 930 000 | 953 |
| 21 Jul 2026 | 4 B/R Villa — Bianca | Off-plan | 971 sqft | AED 1 897 991 | 1 955 |
| 17 Jul 2026 | 2 B/R Villa — Bianca | Off-plan | 1 014 sqft | AED 1 250 000 | 1 232 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects by Reportage Prime Properties L.L.C
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Bianca — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/bianca/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Bianca. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.