Data Dubai

Damac Hills (2) - Farmhouses

Damac Hills (2) - FarmhousesActive83% built13 homesDLD data through 25 Nov 2026

Updated 25 Nov 2026 · latest DLD registrations 25 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Damac Hills (2) - Farmhouses: ChatGPT · Claude · Perplexity

Damac Hills (2) - Farmhouses is a project by Front Line Investment Management L.L.C, recorded at 83% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
0
all property types · trailing 12 complete months
DLD verified
Off-plan share
—
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 25 Nov 2026 · sample 0 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperFront Line Investment Management L.L.C
StatusActive
Construction progress83% — at the last DLD inspection
Registered with DLD25 Jul 2023
Construction started19 Sep 2023
Declared completion28 Aug 2025 — registry date, not a handover promise
Units in the project13
Project area16 728 sqm
Escrow agentAbu Dhabi Commercial Bank
Project number2543

Source: DLD project registry (Mashrooi) · Data through 25 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 25 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 6 technical inspections for this project, from 9 Jan 2023 at 0.0% to 14 May 2026 at 83.0%. Over the inspections since 25 Feb 2025 it moved 3.65 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2025-08-282023-01-092026-05-14

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
14 May 202683.0% +24.1 pp
25 Nov 202559.0% +13.6 pp
25 Jun 202545.3% +15.4 pp
25 Feb 202529.9% +28.6 pp
14 Mar 20241.3% +1.3 pp
9 Jan 20230.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 25 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Damac Hills (2) - Farmhouses: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

05102023202420250510202320242025

registered sales per calendar year; the current year is incomplete

YearSalesMedian priceMedian AED/sqftTotal registered value
20251— —AED 7.80M
20243— —AED 28.69M
202310AED 6.93M —AED 81.35M

Source: Registered DLD transactions · Data through 25 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 0 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in DAMAC HILLS 2

Questions about Damac Hills (2) - Farmhouses

Who is the developer of Damac Hills (2) - Farmhouses?

The Dubai Land Department project registry lists Front Line Investment Management L.L.C as the developer of Damac Hills (2) - Farmhouses.

Is Damac Hills (2) - Farmhouses completed?

The DLD registry status of Damac Hills (2) - Farmhouses is Active, 83% complete at the last DLD inspection. The declared completion date in the registry is 28 Aug 2025 — a registry date, not a handover promise.

How many homes are in Damac Hills (2) - Farmhouses?

The DLD registry records 13 units in Damac Hills (2) - Farmhouses.

What is the price per square foot in Damac Hills (2) - Farmhouses?

Too few sales were registered in Damac Hills (2) - Farmhouses in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Damac Hills (2) - Farmhouses?

The escrow agent recorded by DLD for Damac Hills (2) - Farmhouses is Abu Dhabi Commercial Bank.

Where is Damac Hills (2) - Farmhouses?

Damac Hills (2) - Farmhouses is in the DAMAC HILLS 2 community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 25 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 25 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Damac Hills (2) - Farmhouses — Data Dubai, Continental Club Property, data through 25 Nov 2026, https://datadubai.ae/projects/damac-hills-2-farmhouses/”. Reuse is permitted with attribution.