Damac Hills - Golf Gate
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Damac Hills - Golf Gate is a project by Damac Crescent Properties, recorded at 100% complete at its last Dubai Land Department inspection. 50 sales registered in the trailing 12 months at a median AED 1.03M (1 526 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 50 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Damac Crescent Properties | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 11 Feb 2022 | DLD verified |
| Construction started | 3 May 2022 | DLD verified |
| Declared completion | 15 Dec 2024 — registry date, not a handover promise | DLD verified |
| Units in the project | 351 | DLD verified |
| Project area | 78 793 sqm | DLD verified |
| Escrow agent | Abu Dhabi Commercial Bank | DLD verified |
| Project number | 2358 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Apr 2026: in the 5 months since, no month reached the five registered sales a median needs (11 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 9 technical inspections for this project, from 16 Aug 2022 at 2.5% to 12 Feb 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 12 Feb 2025 | 100.0% | +9.7 pp |
| 19 Sep 2024 | 90.3% | +20.2 pp |
| 1 May 2024 | 70.1% | +15.0 pp |
| 1 May 2024 | 55.0% | +5.0 pp |
| 5 Dec 2023 | 50.1% | +19.2 pp |
| 28 Aug 2023 | 30.9% | +15.7 pp |
| 27 Apr 2023 | 15.2% | +7.2 pp |
| 20 Dec 2022 | 8.0% | +5.6 pp |
| 16 Aug 2022 | 2.5% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Apr 2026 | 5 | AED 1.15M | 1 541 | 1 421 – 1 593 |
| Mar 2026 | 2 | — | — | — |
| Feb 2026 | 4 | — | — | — |
| Jan 2026 | 5 | AED 1.01M | 1 586 | 1 575 – 1 599 |
| Dec 2025 | 7 | AED 1.00M | 1 521 | 1 501 – 1 594 |
| Nov 2025 | 11 | AED 1.04M | 1 476 | 1 424 – 1 589 |
| Oct 2025 | 5 | AED 950k | 1 479 | 1 403 – 1 649 |
| Sep 2025 | 8 | AED 1.14M | 1 484 | 1 433 – 1 535 |
| Aug 2025 | 6 | AED 988k | 1 481 | 1 420 – 1 493 |
| Jul 2025 | 9 | AED 1.00M | 1 504 | 1 469 – 1 583 |
| Jun 2025 | 3 | — | — | — |
| May 2025 | 4 | — | — | — |
| Apr 2025 | 4 | — | — | — |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments | 38 | AED 1.00M | 1 564 | 635 sqft | — | — |
| 2-bedroom apartments low sample (12) | 12 | AED 1.70M | 1 411 | 1 134 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 27 | AED 1.05M | 1 529 | AED 31.97M |
| 2025 | 77 | AED 1.00M | 1 497 | AED 86.65M |
| 2024 | 37 | AED 948k | 1 353 | AED 36.17M |
| 2023 | 210 | AED 880k | 1 265 | AED 217.64M |
| 2022 | 142 | AED 808k | 1 247 | AED 124.51M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 11 Sep 2026 | 1 B/R Flat — DAMAC HILLS - GOLF GATE | Ready | 635 sqft | AED 1 100 000 | 1 733 |
| 1 Sep 2026 | 1 B/R Flat — DAMAC HILLS - GOLF GATE | Ready | 638 sqft | AED 975 000 | 1 529 |
| 18 Aug 2026 | 1 B/R Flat — DAMAC HILLS - GOLF GATE | Ready | 638 sqft | AED 955 000 | 1 498 |
| 14 Aug 2026 | 1 B/R Flat — DAMAC HILLS - GOLF GATE | Ready | 922 sqft | AED 1 107 500 | 1 202 |
| 10 Aug 2026 | 2 B/R Flat — DAMAC HILLS - GOLF GATE | Ready | 1 133 sqft | AED 1 600 000 | 1 412 |
| 23 Jul 2026 | 1 B/R Flat — DAMAC HILLS - GOLF GATE | Ready | 626 sqft | AED 900 000 | 1 437 |
| 15 Jul 2026 | 1 B/R Flat — DAMAC HILLS - GOLF GATE | Ready | 635 sqft | AED 950 000 | 1 496 |
| 13 Jul 2026 | 2 B/R Flat — DAMAC HILLS - GOLF GATE | Ready | 1 259 sqft | AED 1 775 000 | 1 410 |
| 25 Jun 2026 | 2 B/R Flat — DAMAC HILLS - GOLF GATE | Ready | 1 133 sqft | AED 1 500 000 | 1 324 |
| 18 Jun 2026 | 1 B/R Flat — DAMAC HILLS - GOLF GATE | Ready | 626 sqft | AED 1 000 000 | 1 597 |
| 22 May 2026 | 1 B/R Flat — DAMAC HILLS - GOLF GATE | Ready | 637 sqft | AED 1 000 000 | 1 571 |
| 20 Apr 2026 | 2 B/R Flat — DAMAC HILLS - GOLF GATE | Ready | 1 259 sqft | AED 1 720 000 | 1 366 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in DAMAC HILLS
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Damac Hills - Golf Gate — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/damac-hills-golf-gate/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Damac Hills - Golf Gate. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.