Data Dubai

Elaris Axis

Elaris AxisActive4% built171 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Elaris Axis: ChatGPT · Claude · Perplexity

Elaris Axis is a project by Object One Real Estate Development L.L.C, recorded at 4% complete at its last Dubai Land Department inspection. 9 sales registered in the trailing 12 months at a median AED 1.93M. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.93M
≈ US$ 526k · typical range AED 1.21M – AED 8.60M
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
9
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 9 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperObject One Real Estate Development L.L.C
StatusActive
Construction progress4% — at the last DLD inspection
Registered with DLD24 Sep 2026
Construction started10 Jan 2026
Declared completion30 Nov 2028 — registry date, not a handover promise
Units in the project171
Project area20 032 sqm
Escrow agentAbu Dhabi Islamic Bank
Project number4212

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

No month in this window reached the five registered sales a median needs, so there is nothing to plot.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 11 Nov 2025 at 0.0% to 9 Nov 2026 at 4.2%. Since 11 Nov 2025 the recorded percentage has moved 0.35 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2028-11-302025-11-112026-11-09

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
9 Nov 20264.2% +2.0 pp
12 Oct 20262.2% +2.2 pp
11 Nov 20250.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

At least 66 of the 70 homes in Elaris Axis (94%) have no off-plan sale registered with the Dubai Land Department yet, as of 23 Nov 2026. The unit register lists 70 homes and DLD has recorded 4 off-plan sale registrations; because that count also includes resales before completion, the true number without a buyer can only be higher. This is not the developer's availability list.

HomesNo sale yet,
at least
In unit
register
Registered
sales
Studios15161
1 bedroom51543

Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments insufficient data 3— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
24 Nov 2026OfficeOff-plan 961 sqftAED 1 815 893 —
16 Nov 2026Studio FlatOff-plan 418 sqftAED 736 735 1 761
28 Oct 2026OfficeOff-plan 922 sqftAED 1 931 557 —
28 Oct 2026OfficeOff-plan 921 sqftAED 1 931 557 —
28 Oct 2026OfficeOff-plan 1 259 sqftAED 2 649 885 —
27 Oct 2026ShopOff-plan 6 077 sqftAED 13 247 125 —
27 Oct 20261 B/R FlatOff-plan 634 sqftAED 1 122 159 1 769
26 Oct 20261 B/R FlatOff-plan 634 sqftAED 1 212 000 1 911
26 Oct 20261 B/R FlatOff-plan 634 sqftAED 1 212 000 1 911
12 Oct 2026ShopOff-plan 4 729 sqftAED 10 216 445 —
12 Oct 2026ShopOff-plan 3 930 sqftAED 8 602 215 —

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Elaris Axis: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0258202602582026

registered sales per calendar year; the current year is incomplete

By month

0258NovDecJanFebMarAprMayJunJulAugSepOct0258DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20269AED 1.93M —AED 42.12M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 9 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Jumeirah Village Triangle

Questions about Elaris Axis

Who is the developer of Elaris Axis?

The Dubai Land Department project registry lists Object One Real Estate Development L.L.C as the developer of Elaris Axis.

Is Elaris Axis completed?

The DLD registry status of Elaris Axis is Active, 4% complete at the last DLD inspection. The declared completion date in the registry is 30 Nov 2028 — a registry date, not a handover promise.

How many homes are in Elaris Axis?

The DLD registry records 171 units in Elaris Axis. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in Elaris Axis?

Too few sales were registered in Elaris Axis in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Elaris Axis?

The escrow agent recorded by DLD for Elaris Axis is Abu Dhabi Islamic Bank.

Where is Elaris Axis?

Elaris Axis is in the Jumeirah Village Triangle community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Elaris Axis — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/elaris-axis/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Elaris Axis. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.