Golf Meadow
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Golf Meadow: ChatGPT · Claude · Perplexity
Golf Meadow is a project by Emaar Dubai South Dwc Llc, recorded at 5% complete at its last Dubai Land Department inspection. 5 sales registered in the trailing 12 months at a median AED 2.13M (1 895 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 5 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Emaar Dubai South Dwc Llc |
| Status | Active |
| Construction progress | 5% — at the last DLD inspection |
| Registered with DLD | 7 Mar 2025 |
| Construction started | 20 Aug 2025 |
| Declared completion | 31 Jul 2029 — registry date, not a handover promise |
| Units in the project | 188 |
| Project area | 18 736 sqm |
| Escrow agent | Mashreq Bank Psc |
| Project number | 3579 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2025: in the 13 months since, no month reached the five registered sales a median needs (6 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 3 technical inspections for this project, from 25 Feb 2025 at 0.0% to 19 Jul 2026 at 4.5%. Since 25 Feb 2025 the recorded percentage has moved 0.27 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 19 Jul 2026 | 4.5% | +2.8 pp |
| 24 Mar 2026 | 1.8% | +1.8 pp |
| 25 Feb 2025 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
Off-plan sale registrations in Golf Meadow (183) already equal 97% of the 188 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.
| Homes | In unit register | Registered sales |
|---|---|---|
| 1 bedroom | 69 | 69 |
| 2 bedrooms | 93 | 94 |
| 3 bedrooms | 26 | 20 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments insufficient data | 1 | — | — | — | — | — |
| 2-bedroom apartments insufficient data | 2 | — | — | — | — | — |
| 3-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 4 May 2026 | 1 B/R Flat | Off-plan | 721 sqft | AED 1 428 888 | 1 981 |
| 8 Apr 2026 | 2 B/R Flat | Off-plan | 1 133 sqft | AED 1 672 888 | 1 477 |
| 16 Feb 2026 | 2 B/R Flat | Off-plan | 1 083 sqft | AED 2 128 888 | 1 966 |
| 10 Feb 2026 | 3 B/R Flat | Off-plan | 1 571 sqft | AED 2 738 888 | 1 743 |
| 20 Jan 2026 | 3 B/R Flat | Off-plan | 1 570 sqft | AED 2 973 888 | 1 895 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Golf Meadow: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Oct 2025 – Sep 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 5 | AED 2.13M | 1 895 | AED 10.94M |
| 2025 | 178 | AED 1.66M | 1 612 | AED 305.35M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Sep 2025 | 6 | AED 2.52M | 1 850 | 1 793 – 1 866 |
| Aug 2025 | 4 | — | — | — |
| Jul 2025 | 10 | AED 1.54M | 1 875 | 1 604 – 1 920 |
| Jun 2025 | 6 | AED 1.56M | 1 528 | 1 480 – 1 591 |
| May 2025 | 79 | AED 1.66M | 1 597 | 1 526 – 1 899 |
| Apr 2025 | 72 | AED 1.66M | 1 612 | 1 576 – 1 878 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 5 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai World Central
Questions about Golf Meadow
Who is the developer of Golf Meadow?
The Dubai Land Department project registry lists Emaar Dubai South Dwc Llc as the developer of Golf Meadow.
Is Golf Meadow completed?
The DLD registry status of Golf Meadow is Active, 5% complete at the last DLD inspection. The declared completion date in the registry is 31 Jul 2029 — a registry date, not a handover promise.
How many homes are in Golf Meadow?
The DLD registry records 188 units in Golf Meadow. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Golf Meadow?
Over the last 12 complete months the median registered sale in Golf Meadow was AED 2.13M, or AED 1 895 per sqft, from 5 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Golf Meadow?
The escrow agent recorded by DLD for Golf Meadow is Mashreq Bank Psc.
Where is Golf Meadow?
Golf Meadow is in the Dubai World Central community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Golf Meadow. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.